메뉴 건너뛰기




Volumn 36, Issue 11, 1998, Pages 3055-3066

Vulnerability of production systems with multi-supplier network: A case study

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL MODELS; OPERATIONS RESEARCH; PRODUCTION; SYSTEMS ANALYSIS;

EID: 0032205648     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498192283     Document Type: Article
Times cited : (15)

References (26)
  • 1
    • 0346490751 scopus 로고
    • A methodology for the vulnerability analysis of Just-In-Time production systems
    • Albino, V. and Garavelli, A. C., 1995, A methodology for the vulnerability analysis of Just-In-Time production systems. International Journal of Production Economics, 41, 71-80.
    • (1995) International Journal of Production Economics , vol.41 , pp. 71-80
    • Albino, V.1    Garavelli, A.C.2
  • 2
    • 85010492874 scopus 로고    scopus 로고
    • Vulnerability and performance-related dependability measures for production systems
    • May, Banff, Canada, forthcoming
    • Albino, V., Garavelli, A. C. and Okogbaa, G. O., 1998, Vulnerability and performance-related dependability measures for production systems. 7th Industrial Engineering Research Conference, 9-10 May, Banff, Canada, forthcoming.
    • (1998) 7Th Industrial Engineering Research Conference , pp. 9-10
    • Albino, V.1    Garavelli, A.C.2    Okogbaa, G.O.3
  • 3
    • 0028452762 scopus 로고
    • Models for performance evaluation of flexibility in manufacturing systems
    • Benjaafar, S., 1994, Models for performance evaluation of flexibility in manufacturing systems. International Journal of Production Research, 32, 1383-1402.
    • (1994) International Journal of Production Research , vol.32 , pp. 1383-1402
    • Benjaafar, S.1
  • 4
    • 3843111308 scopus 로고
    • Beyond content and control: Project vulnerability and the process agenda
    • Buchanan, D. A., 1991, Beyond content and control: project vulnerability and the process agenda. International Journal of Project Management, 9, 233-239.
    • (1991) International Journal of Project Management , vol.9 , pp. 233-239
    • Buchanan, D.A.1
  • 7
    • 0002355705 scopus 로고
    • Effective supply chain
    • Davis, T., 1993, Effective supply chain. Sloan Management Review, 34, 35-46.
    • (1993) Sloan Management Review , vol.34 , pp. 35-46
    • Davis, T.1
  • 8
    • 0024304479 scopus 로고
    • Calculating availability and performability measures of repairable computer systems using randomization
    • and
    • De Souza e Silva, E. and Gail, R. H., 1989, Calculating availability and performability measures of repairable computer systems using randomization. Journal of the Association for Computing Machinery, 36, 171-193.
    • (1989) Journal of the Association for Computing Machinery , vol.36 , pp. 171-193
    • De Souza E Silva, E.1    Gail, R.H.2
  • 9
    • 29244444746 scopus 로고    scopus 로고
    • Seismic vulnerability evaluation and damage scenarios
    • Columbia University, New York, 12-13 December
    • Dolce, M., 1996, Seismic vulnerability evaluation and damage scenarios. Proc. of USA-Italian Workshop Seismic Evaluation and Retrofit, Columbia University, New York, 12-13 December, pp. 1-18.
    • (1996) Proc. Of Usa-Italian Workshop Seismic Evaluation and Retrofit , pp. 1-18
    • Dolce, M.1
  • 10
    • 0002478039 scopus 로고
    • The emerging theory of manufacturing
    • Drucker, P. F., 1990, The emerging theory of manufacturing. Harvard Business Review, 68, 94-102.
    • (1990) Harvard Business Review , vol.68 , pp. 94-102
    • Drucker, P.F.1
  • 11
    • 1642583580 scopus 로고
    • The consequences of complexity in economics: Vulnerability, risk and rigidity factors in supply
    • Aida et al. (eds) (Tokyo: United Nations University)
    • Giarini, O., 1984, The consequences of complexity in economics: vulnerability, risk and rigidity factors in supply. In The Science and Praxis of Complexity. Aida et al. (eds) (Tokyo: United Nations University), pp. 133-145.
    • (1984) In the Science and Praxis of Complexity , pp. 133-145
    • Giarini, O.1
  • 12
    • 0030621938 scopus 로고    scopus 로고
    • The four faces of mass customization
    • Gilmore, J. and Pine, B. J. II, 1997, The four faces of mass customization. Harvard Business Review, 75, 91-101.
    • (1997) Harvard Business Review , vol.75 , pp. 91-101
    • Gilmore, J.1    Pine, B.2
  • 13
    • 3543149292 scopus 로고
    • Implications of implementing just-in-time systems
    • Gupta, P. Y. and Heragu, S., 1991, Implications of implementing just-in-time systems. Technovation, 11, 143-162.
    • (1991) Technovation , vol.11 , pp. 143-162
    • Gupta, P.Y.1    Heragu, S.2
  • 16
    • 0002537975 scopus 로고
    • How much has really changed between US automakers and their suppliers?
    • Helper, S., 1991, How much has really changed between US automakers and their suppliers? Sloan Management Review, 32, 15-28.
    • (1991) Sloan Management Review , vol.32 , pp. 15-28
    • Helper, S.1
  • 17
    • 0024725591 scopus 로고
    • Getting control of Just-in-Time
    • Karmarkar, U., 1989, Getting control of Just-in-Time. Harvard Business Review, 67, 122-131.
    • (1989) Harvard Business Review , vol.67 , pp. 122-131
    • Karmarkar, U.1
  • 18
    • 0029530893 scopus 로고
    • Explaining household vulnerability to idiosyncratic income shocks
    • Kochar, A., 1995, Explaining household vulnerability to idiosyncratic income shocks. American Economic Review, 85, 159-165.
    • (1995) American Economic Review , vol.85 , pp. 159-165
    • Kochar, A.1
  • 20
    • 0002257240 scopus 로고
    • Mixed motive marriages: What’s next for buyer-supplier relations?
    • Lyons, T. F., Krachenberg, A. R. and Henke, J. W., 1990, Mixed motive marriages: what’s next for buyer-supplier relations? Sloan Management Review, 31, 29-36.
    • (1990) Sloan Management Review , vol.31 , pp. 29-36
    • Lyons, T.F.1    Krachenberg, A.R.2    Henke, J.W.3
  • 21
    • 0023439933 scopus 로고
    • Modeling coordination in organizations and markets
    • Malone, T., 1987, Modeling coordination in organizations and markets. Management Science, 33, 1317-1333.
    • (1987) Management Science , vol.33 , pp. 1317-1333
    • Malone, T.1
  • 23
    • 0001698924 scopus 로고
    • A survey and critical review of flexibility measures in manufacturing systems
    • Sarker, B. R., Krishnamurthy, S. and Kuthethur, S. G., 1994, A survey and critical review of flexibility measures in manufacturing systems. Production Planning and Control, 5, 512-523.
    • (1994) Production Planning and Control , vol.5 , pp. 512-523
    • Sarker, B.R.1    Krishnamurthy, S.2    Kuthethur, S.G.3
  • 26
    • 0002528360 scopus 로고
    • Does manufacturing need a JIT revolution?
    • Zipkin, P. H., 1991, Does manufacturing need a JIT revolution? Harvard Business Review, 69, 40-46.
    • (1991) Harvard Business Review , vol.69 , pp. 40-46
    • Zipkin, P.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.