-
1
-
-
0346490751
-
A methodology for the vulnerability analysis of Just-In-Time production systems
-
Albino, V. and Garavelli, A. C., 1995, A methodology for the vulnerability analysis of Just-In-Time production systems. International Journal of Production Economics, 41, 71-80.
-
(1995)
International Journal of Production Economics
, vol.41
, pp. 71-80
-
-
Albino, V.1
Garavelli, A.C.2
-
2
-
-
85010492874
-
Vulnerability and performance-related dependability measures for production systems
-
May, Banff, Canada, forthcoming
-
Albino, V., Garavelli, A. C. and Okogbaa, G. O., 1998, Vulnerability and performance-related dependability measures for production systems. 7th Industrial Engineering Research Conference, 9-10 May, Banff, Canada, forthcoming.
-
(1998)
7Th Industrial Engineering Research Conference
, pp. 9-10
-
-
Albino, V.1
Garavelli, A.C.2
Okogbaa, G.O.3
-
3
-
-
0028452762
-
Models for performance evaluation of flexibility in manufacturing systems
-
Benjaafar, S., 1994, Models for performance evaluation of flexibility in manufacturing systems. International Journal of Production Research, 32, 1383-1402.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1383-1402
-
-
Benjaafar, S.1
-
4
-
-
3843111308
-
Beyond content and control: Project vulnerability and the process agenda
-
Buchanan, D. A., 1991, Beyond content and control: project vulnerability and the process agenda. International Journal of Project Management, 9, 233-239.
-
(1991)
International Journal of Project Management
, vol.9
, pp. 233-239
-
-
Buchanan, D.A.1
-
5
-
-
0024087415
-
A study of JIT implementation and operating problems
-
Crawford, K. M., Blackstone, J. H., Jr. and Cox, J. F., 1988, A study of JIT implementation and operating problems. International Journal of Production Research, 26, 1561-1568.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1561-1568
-
-
Crawford, K.M.1
Blackstone, J.H.2
Cox, J.F.3
-
7
-
-
0002355705
-
Effective supply chain
-
Davis, T., 1993, Effective supply chain. Sloan Management Review, 34, 35-46.
-
(1993)
Sloan Management Review
, vol.34
, pp. 35-46
-
-
Davis, T.1
-
8
-
-
0024304479
-
Calculating availability and performability measures of repairable computer systems using randomization
-
and
-
De Souza e Silva, E. and Gail, R. H., 1989, Calculating availability and performability measures of repairable computer systems using randomization. Journal of the Association for Computing Machinery, 36, 171-193.
-
(1989)
Journal of the Association for Computing Machinery
, vol.36
, pp. 171-193
-
-
De Souza E Silva, E.1
Gail, R.H.2
-
9
-
-
29244444746
-
Seismic vulnerability evaluation and damage scenarios
-
Columbia University, New York, 12-13 December
-
Dolce, M., 1996, Seismic vulnerability evaluation and damage scenarios. Proc. of USA-Italian Workshop Seismic Evaluation and Retrofit, Columbia University, New York, 12-13 December, pp. 1-18.
-
(1996)
Proc. Of Usa-Italian Workshop Seismic Evaluation and Retrofit
, pp. 1-18
-
-
Dolce, M.1
-
10
-
-
0002478039
-
The emerging theory of manufacturing
-
Drucker, P. F., 1990, The emerging theory of manufacturing. Harvard Business Review, 68, 94-102.
-
(1990)
Harvard Business Review
, vol.68
, pp. 94-102
-
-
Drucker, P.F.1
-
11
-
-
1642583580
-
The consequences of complexity in economics: Vulnerability, risk and rigidity factors in supply
-
Aida et al. (eds) (Tokyo: United Nations University)
-
Giarini, O., 1984, The consequences of complexity in economics: vulnerability, risk and rigidity factors in supply. In The Science and Praxis of Complexity. Aida et al. (eds) (Tokyo: United Nations University), pp. 133-145.
-
(1984)
In the Science and Praxis of Complexity
, pp. 133-145
-
-
Giarini, O.1
-
12
-
-
0030621938
-
The four faces of mass customization
-
Gilmore, J. and Pine, B. J. II, 1997, The four faces of mass customization. Harvard Business Review, 75, 91-101.
-
(1997)
Harvard Business Review
, vol.75
, pp. 91-101
-
-
Gilmore, J.1
Pine, B.2
-
13
-
-
3543149292
-
Implications of implementing just-in-time systems
-
Gupta, P. Y. and Heragu, S., 1991, Implications of implementing just-in-time systems. Technovation, 11, 143-162.
-
(1991)
Technovation
, vol.11
, pp. 143-162
-
-
Gupta, P.Y.1
Heragu, S.2
-
16
-
-
0002537975
-
How much has really changed between US automakers and their suppliers?
-
Helper, S., 1991, How much has really changed between US automakers and their suppliers? Sloan Management Review, 32, 15-28.
-
(1991)
Sloan Management Review
, vol.32
, pp. 15-28
-
-
Helper, S.1
-
17
-
-
0024725591
-
Getting control of Just-in-Time
-
Karmarkar, U., 1989, Getting control of Just-in-Time. Harvard Business Review, 67, 122-131.
-
(1989)
Harvard Business Review
, vol.67
, pp. 122-131
-
-
Karmarkar, U.1
-
18
-
-
0029530893
-
Explaining household vulnerability to idiosyncratic income shocks
-
Kochar, A., 1995, Explaining household vulnerability to idiosyncratic income shocks. American Economic Review, 85, 159-165.
-
(1995)
American Economic Review
, vol.85
, pp. 159-165
-
-
Kochar, A.1
-
19
-
-
3843084116
-
The capacity-inventory trade-off in JIT
-
London Business School, London, 5-6 April
-
Lambrecht, M., 1993, The capacity-inventory trade-off in JIT. In Proc. of the 4th International Production Management Conference, London Business School, London, 5-6 April, pp. 357-367.
-
(1993)
In Proc. Of the 4Th International Production Management Conference
, pp. 357-367
-
-
Lambrecht, M.1
-
20
-
-
0002257240
-
Mixed motive marriages: What’s next for buyer-supplier relations?
-
Lyons, T. F., Krachenberg, A. R. and Henke, J. W., 1990, Mixed motive marriages: what’s next for buyer-supplier relations? Sloan Management Review, 31, 29-36.
-
(1990)
Sloan Management Review
, vol.31
, pp. 29-36
-
-
Lyons, T.F.1
Krachenberg, A.R.2
Henke, J.W.3
-
21
-
-
0023439933
-
Modeling coordination in organizations and markets
-
Malone, T., 1987, Modeling coordination in organizations and markets. Management Science, 33, 1317-1333.
-
(1987)
Management Science
, vol.33
, pp. 1317-1333
-
-
Malone, T.1
-
23
-
-
0001698924
-
A survey and critical review of flexibility measures in manufacturing systems
-
Sarker, B. R., Krishnamurthy, S. and Kuthethur, S. G., 1994, A survey and critical review of flexibility measures in manufacturing systems. Production Planning and Control, 5, 512-523.
-
(1994)
Production Planning and Control
, vol.5
, pp. 512-523
-
-
Sarker, B.R.1
Krishnamurthy, S.2
Kuthethur, S.G.3
-
26
-
-
0002528360
-
Does manufacturing need a JIT revolution?
-
Zipkin, P. H., 1991, Does manufacturing need a JIT revolution? Harvard Business Review, 69, 40-46.
-
(1991)
Harvard Business Review
, vol.69
, pp. 40-46
-
-
Zipkin, P.H.1
|