메뉴 건너뛰기




Volumn 46, Issue 6, 1998, Pages 883-898

Determining production schedules under base-stock policies in single facility multi-item production systems

Author keywords

Inventory production: multi item echeon stage; Inventory production: stochastic; Production scheduling: stochastic

Indexed keywords

HEURISTIC METHODS; INVENTORY CONTROL; MATHEMATICAL PROGRAMMING; PRODUCTION; PUBLIC POLICY;

EID: 0032201714     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.46.6.883     Document Type: Article
Times cited : (41)

References (52)
  • 1
    • 0032073456 scopus 로고    scopus 로고
    • Managing Stochastic Multi-product Systems: Models, Measures and Analysis
    • ANUPINDI, R., AND S. TAYUR. 1998. Managing Stochastic Multi-product Systems: Models, Measures and Analysis. Op. Res. 46, S98-S111.
    • (1998) Op. Res. , vol.46
    • Anupindi, R.1    Tayur, S.2
  • 3
    • 0002154450 scopus 로고
    • Optimization of Multiclass Queueing Networks: Polyhedral and Nonlinear Characterizations of Achievable Performance
    • to appear
    • BERTSIMAS, D., I. PASCHALIDIS, AND J. TSITSIKLIS. 1994. Optimization of Multiclass Queueing Networks: Polyhedral and Nonlinear Characterizations of Achievable Performance. to appear in Annals of Applied Probability.
    • (1994) Annals of Applied Probability
    • Bertsimas, D.1    Paschalidis, I.2    Tsitsiklis, J.3
  • 7
    • 0001267220 scopus 로고
    • The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand
    • BOURLAND, K. E., AND C. A. YANO. 1994. The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand, Mgmt. Sci. 40, 1690-1704.
    • (1994) Mgmt. Sci. , vol.40 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.A.2
  • 8
    • 0039675990 scopus 로고
    • Optimization of Polling Systems
    • P. J. B. King, I. Mitrani, and R. J. Pooley (eds.). Elsevier Science Publishers B.V., North Holland
    • BOXMA, O. J., H. LEVY, AND J. A. WESTSTRATE. 1990. Optimization of Polling Systems. In Performance 90, P. J. B. King, I. Mitrani, and R. J. Pooley (eds.). Elsevier Science Publishers B.V., North Holland.
    • (1990) Performance 90
    • Boxma, O.J.1    Levy, H.2    Weststrate, J.A.3
  • 9
    • 0004836691 scopus 로고
    • Efficient Visit Frequencies for Polling Tables: Minimization of Waiting Cost
    • BOXMA, O. J., H. LEVY, AND J. A. WESTSTRATE. 1991. Efficient Visit Frequencies for Polling Tables: Minimization of Waiting Cost. Queueing Systems, 9, 133-162.
    • (1991) Queueing Systems , vol.9 , pp. 133-162
    • Boxma, O.J.1    Levy, H.2    Weststrate, J.A.3
  • 12
    • 0000391518 scopus 로고
    • Dynamic Priority Rules for Cyclic-type Queues
    • BROWNE, S., AND U. YECHIALI. 1989b. Dynamic Priority Rules for Cyclic-type Queues. Advances in Applied Probability. 21, 2, 432-450.
    • (1989) Advances in Applied Probability , vol.21 , Issue.2 , pp. 432-450
    • Browne, S.1    Yechiali, U.2
  • 14
    • 0019013348 scopus 로고
    • A Characterization of Waiting Time Performance Realizable by Single Server Queues
    • COFFMAN, E., AND I. MITRANI. 1980. A Characterization of Waiting Time Performance Realizable by Single Server Queues. Opns. Res. 28, 810-821.
    • (1980) Opns. Res. , vol.28 , pp. 810-821
    • Coffman, E.1    Mitrani, I.2
  • 15
    • 0023420909 scopus 로고
    • The Economic Lot Scheduling Problem: Achieving Feasibility Using Time-varying Lot Sizes
    • DODSON, G. 1987. The Economic Lot Scheduling Problem: Achieving Feasibility Using Time-varying Lot Sizes. Opns. Res. 35, 5, 764-771.
    • (1987) Opns. Res. , vol.35 , Issue.5 , pp. 764-771
    • Dodson, G.1
  • 16
    • 34249753159 scopus 로고
    • Stochastic Scheduling of Parallel Queues with Setup Costs
    • DUENYAS, I., AND M. P. VAN OYEN. 1995. Stochastic Scheduling of Parallel Queues with Setup Costs. Queueing Systems, 19, 421-444.
    • (1995) Queueing Systems , vol.19 , pp. 421-444
    • Duenyas, I.1    Van Oyen, M.P.2
  • 17
    • 0001514851 scopus 로고    scopus 로고
    • Heuristic Scheduling of Parallel Heterogeneous Queues with Setups
    • DUENYAS, I., AND M. P. VAN OYEN. 1996. Heuristic Scheduling of Parallel Heterogeneous Queues with Setups. Mgmt. Sci. 42, 814-829.
    • (1996) Mgmt. Sci. , vol.42 , pp. 814-829
    • Duenyas, I.1    Van Oyen, M.P.2
  • 18
    • 0024073120 scopus 로고
    • Characterization and Optimization of Achievable Performance in General Queueing Systems
    • FEDERGRUEN, A., AND H. GROENEVELT. 1988a. Characterization and Optimization of Achievable Performance in General Queueing Systems. Opns. Res. 36, 736-741.
    • (1988) Opns. Res. , vol.36 , pp. 736-741
    • Federgruen, A.1    Groenevelt, H.2
  • 19
    • 0000077307 scopus 로고
    • M/G/c Queueing Systems with Multiple Customer Classes: Characterization and Control Achievable Performance under Nonpreemptive Priority Rules
    • FEDERGRUEN, A., AND H. GROENEVELT. 1988b. M/G/c Queueing Systems with Multiple Customer Classes: Characterization and Control Achievable Performance under Nonpreemptive Priority Rules. Mgmt. Sci. 34, 1121-1138.
    • (1988) Mgmt. Sci. , vol.34 , pp. 1121-1138
    • Federgruen, A.1    Groenevelt, H.2
  • 20
    • 21844487671 scopus 로고
    • Approximating Queue Size and Waiting Time Distributions in General Polling Systems
    • FEDERGRUEN, A., AND Z. KATALAN. 1994. Approximating Queue Size and Waiting Time Distributions in General Polling Systems. Queueing Systems, 18, 353-386.
    • (1994) Queueing Systems , vol.18 , pp. 353-386
    • Federgruen, A.1    Katalan, Z.2
  • 22
    • 0001706406 scopus 로고    scopus 로고
    • The Stochastic Economic Lot Scheduling Problem: Cyclical Base-stock Policies with Idle Times
    • FEDERGRUEN, A., AND Z. KATALAN. 1996a. The Stochastic Economic Lot Scheduling Problem: Cyclical Base-stock Policies with Idle Times. Mgmt. Sci. 42, 783-796.
    • (1996) Mgmt. Sci. , vol.42 , pp. 783-796
    • Federgruen, A.1    Katalan, Z.2
  • 23
    • 0030282573 scopus 로고    scopus 로고
    • The Impact of Setup Times on the Performance of Multi-class Service and Production Systems
    • FEDERGRUEN, A., AND Z. KATALAN. 1996b. The Impact of Setup Times on the Performance of Multi-class Service and Production Systems. Opns. Res. 44, 989-1001.
    • (1996) Opns. Res. , vol.44 , pp. 989-1001
    • Federgruen, A.1    Katalan, Z.2
  • 24
    • 20044369604 scopus 로고
    • Discrete Optimization via Marginal Analysis
    • FOX, B. 1958. Discrete Optimization via Marginal Analysis. Mgmt. Sci. 4, 136-153.
    • (1958) Mgmt. Sci. , vol.4 , pp. 136-153
    • Fox, B.1
  • 25
    • 0020120231 scopus 로고
    • The Complexity of Selection and Ranking in X + Y and Matrices with Sorted Columns
    • FREDERICKSON, G. N., AND D. B. JOHNSON. 1982. The Complexity of Selection and Ranking in X + Y and Matrices with Sorted Columns. J. Comput. Sys. Sci. 197-208.
    • (1982) J. Comput. Sys. Sci. , pp. 197-208
    • Frederickson, G.N.1    Johnson, D.B.2
  • 26
    • 0022130542 scopus 로고
    • Stochastic Decompositions in the M/G/1 Queue with Generalized Vacations
    • FUHRMANN, S. W., AND R. B. COOPER. 1985. Stochastic Decompositions in the M/G/1 Queue with Generalized Vacations. Opns. Res. 33, 5, 1117-1129.
    • (1985) Opns. Res. , vol.33 , Issue.5 , pp. 1117-1129
    • Fuhrmann, S.W.1    Cooper, R.B.2
  • 27
    • 0001917320 scopus 로고
    • A Fast Selection Algorithm and the Problem of Optimum Distribution of Efforts
    • GALIL, Z., AND N. MEGIDDO. 1979. A Fast Selection Algorithm and the Problem of Optimum Distribution of Efforts. J. ACM, 26, 58-64.
    • (1979) J. ACM , vol.26 , pp. 58-64
    • Galil, Z.1    Megiddo, N.2
  • 28
    • 0027642234 scopus 로고
    • The Distribution Free Newsboy Problem: Review and Extensions
    • GALLEGO, G., AND I. MOON. 1993. The Distribution Free Newsboy Problem: Review and Extensions. J. Opl. Res. Soc. 44, 825-834.
    • (1993) J. Opl. Res. Soc. , vol.44 , pp. 825-834
    • Gallego, G.1    Moon, I.2
  • 29
    • 0031999878 scopus 로고    scopus 로고
    • New Bounds and Heuristics for (Q, r) Policies
    • GALLEGO, G. 1998. New Bounds and Heuristics for (Q, r) Policies. Mgmt. Sci. 44, 219-233.
    • (1998) Mgmt. Sci. , vol.44 , pp. 219-233
    • Gallego, G.1
  • 33
    • 0023345261 scopus 로고
    • The Multiarmed Bandit Problem: Decomposition and Computation
    • KATEHAKIS, M. N., AND A. F. VEINOTT. 1987. The Multiarmed Bandit Problem: Decomposition and Computation. Math. O. R. 12, 262-268.
    • (1987) Math. O. R. , vol.12 , pp. 262-268
    • Katehakis, M.N.1    Veinott, A.F.2
  • 34
    • 0024068882 scopus 로고
    • The Analysis of Random Polling Systems
    • KLEINROCK, L., AND H. LEVY. 1988. The Analysis of Random Polling Systems. Opns. Res. 36, 716-732.
    • (1988) Opns. Res. , vol.36 , pp. 716-732
    • Kleinrock, L.1    Levy, H.2
  • 37
    • 0028370336 scopus 로고    scopus 로고
    • Descendant Set: An Efficient Approach for the Analysis of Polling Systems
    • KONHEIM, A. G., H. LEVY, AND M. M. SRINIVASAN. Descendant Set: An Efficient Approach for the Analysis of Polling Systems. IEEE Trans. Communications, 42, 2/3/4, 1245-1253.
    • IEEE Trans. Communications , vol.42 , Issue.2-4 , pp. 1245-1253
    • Konheim, A.G.1    Levy, H.2    Srinivasan, M.M.3
  • 38
    • 0023977009 scopus 로고
    • A Heuristic Scheduling Policy for Multi-item, Single-machine Production Systems with Time-varying Stochastic Demands
    • LEACHMAN, R. C., AND A. GASCON. 1988. A Heuristic Scheduling Policy for Multi-item, Single-machine Production Systems with Time-varying Stochastic Demands. Mgmt. Sci. 34, 3, 377-390.
    • (1988) Mgmt. Sci. , vol.34 , Issue.3 , pp. 377-390
    • Leachman, R.C.1    Gascon, A.2
  • 39
    • 0039893556 scopus 로고
    • Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-item, Single Machine
    • LEACHMAN, R. C., Z. K. XIONG, A. GASCON, AND K. PARK. 1991. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-item, Single Machine. Mgmt. Sci. 37, 9, 1201-1205.
    • (1991) Mgmt. Sci. , vol.37 , Issue.9 , pp. 1201-1205
    • Leachman, R.C.1    Xiong, Z.K.2    Gascon, A.3    Park, K.4
  • 41
    • 0029252917 scopus 로고
    • Multiproduct Production Inventory Control under Random Demands
    • QUI, J., AND R. LOULOU. 1995. Multiproduct Production Inventory Control under Random Demands. IEEE Trans. Automatic Control, 40, 350-356.
    • (1995) IEEE Trans. Automatic Control , vol.40 , pp. 350-356
    • Qui, J.1    Loulou, R.2
  • 42
    • 0000693149 scopus 로고
    • Variance Effects in Cyclic Production Systems
    • SARKAR, D., AND W. I. ZANGWILL. 1991. Variance Effects in Cyclic Production Systems. Mgmt. Sci. 37, 444-453.
    • (1991) Mgmt. Sci. , vol.37 , pp. 444-453
    • Sarkar, D.1    Zangwill, W.I.2
  • 44
    • 0026861383 scopus 로고
    • Multiclass Queueing Systems: Polymatroidal Structure and Optimal Scheduling Control
    • SHANTHIKUMAR, G., AND D. D. YAO. 1992. Multiclass Queueing Systems: Polymatroidal Structure and Optimal Scheduling Control. Opns. Res. 40, Supplement 2, S293-299.
    • (1992) Opns. Res. , vol.40 , Issue.2 SUPPL.
    • Shanthikumar, G.1    Yao, D.D.2
  • 48
    • 21144484288 scopus 로고
    • The Limits of Japanese Production Theory
    • ZANGWILL, W. I. 1992. The Limits of Japanese Production Theory. Interfaces, 22, 14-25.
    • (1992) Interfaces , vol.22 , pp. 14-25
    • Zangwill, W.I.1
  • 49
    • 0003882532 scopus 로고
    • Comments on "The Limits of Japanese Production Theory."
    • ZANGWILL, W. I. 1994. Comments on "The Limits of Japanese Production Theory." Interfaces, 24, 77-94.
    • (1994) Interfaces , vol.24 , pp. 77-94
    • Zangwill, W.I.1
  • 50
    • 0020182814 scopus 로고
    • Exact and Approximate Cost Functions for Product Aggregates
    • ZIPKIN, P. 1982. Exact and Approximate Cost Functions for Product Aggregates. Mgmt. Sci. 28, 1002-1012.
    • (1982) Mgmt. Sci. , vol.28 , pp. 1002-1012
    • Zipkin, P.1
  • 51
    • 0022562253 scopus 로고
    • Models for Design and Control of Stochastic, Multi-item Batch Production Systems
    • ZIPKIN, P. 1986. Models for Design and Control of Stochastic, Multi-item Batch Production Systems. Opns. Res. 34, 1, 91-104.
    • (1986) Opns. Res. , vol.34 , Issue.1 , pp. 91-104
    • Zipkin, P.1
  • 52
    • 0002144959 scopus 로고
    • Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
    • ZIPKIN, P. 1991. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem. Opns. Res. 39, 1, 56-63.
    • (1991) Opns. Res. , vol.39 , Issue.1 , pp. 56-63
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.