메뉴 건너뛰기




Volumn 110, Issue 1, 1998, Pages 1-19

Reacting in real-time to production contingencies in a capacitated flexible cell

Author keywords

Inventory; Manufacturing; Production scheduling

Indexed keywords

ALGORITHMS; COMPETITION; COMPUTATIONAL METHODS; CONSTRAINT THEORY; COST EFFECTIVENESS; INVENTORY CONTROL; PROCESS CONTROL; PRODUCTION CONTROL; REAL TIME SYSTEMS; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0032190052     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00212-9     Document Type: Article
Times cited : (3)

References (23)
  • 1
    • 0002668750 scopus 로고
    • Lot-sizing procedures for requirements planning systems: A framework for analysis
    • W.L. Berry, Lot-sizing procedures for requirements planning systems: A framework for analysis, Production and Inventory Management 13 1972, 19-33.
    • (1972) Production and Inventory Management , vol.13 , pp. 19-33
    • Berry, W.L.1
  • 2
    • 0039177408 scopus 로고
    • Performance of lot-sizing rules in an MRP system with different operating conditions
    • J.R. Biggs, C.K. Hahn, P.A. Pinto, Performance of lot-sizing rules in an MRP system with different operating conditions. Academy of Management Review 5 1980, 86-96.
    • (1980) Academy of Management Review , vol.5 , pp. 86-96
    • Biggs, J.R.1    Hahn, C.K.2    Pinto, P.A.3
  • 3
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • P.J. Billington, J.O. McClain, L.J. Thomas, Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction, Management Science 29, 1983, 1126-1141.
    • (1983) Management Science , vol.29 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 4
    • 0022769864 scopus 로고
    • Heuristics for multi-level lot-sizing with a bottleneck
    • P.J. Billington, J.O. McClain, L.J. Thomas, Heuristics for multi-level lot-sizing with a bottleneck, Management Science 32, 1986, 989-1006.
    • (1986) Management Science , vol.32 , pp. 989-1006
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 5
    • 0018507737 scopus 로고
    • Less nervous MRP systems: A dynamic economic lot-sizing approach
    • R.C. Carlson, J.V. Jucker, D.H. Kropp, Less nervous MRP systems: A dynamic economic lot-sizing approach, Management Science 25, 1979, 754-761.
    • (1979) Management Science , vol.25 , pp. 754-761
    • Carlson, R.C.1    Jucker, J.V.2    Kropp, D.H.3
  • 6
    • 84985803914 scopus 로고
    • Open order rescheduling in a job shop with demand uncertainty
    • D.P. Christy, J.J. Kanet, Open order rescheduling in a job shop with demand uncertainty, Decision Sciences 19, 1988, 801-818.
    • (1988) Decision Sciences , vol.19 , pp. 801-818
    • Christy, D.P.1    Kanet, J.J.2
  • 7
    • 0002170207 scopus 로고
    • A comparison of MRP lot-sizing methods considering capacity change costs
    • D.A. Collier, A comparison of MRP lot-sizing methods considering capacity change costs, Journal of Operations Management 1, 1980, 23-29.
    • (1980) Journal of Operations Management , vol.1 , pp. 23-29
    • Collier, D.A.1
  • 9
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedurs to cope with MRP system nervousness
    • C.J. Ho, P.L. Carter, An investigation of alternative dampening procedurs to cope with MRP system nervousness, International Journal of Production Research 34, 1996, 137-156.
    • (1996) International Journal of Production Research , vol.34 , pp. 137-156
    • Ho, C.J.1    Carter, P.L.2
  • 11
    • 85033906848 scopus 로고    scopus 로고
    • HYPERLINDO/PC, LINDO Systems Inc., Chicago, IL, 1989
    • HYPERLINDO/PC, LINDO Systems Inc., Chicago, IL, 1989.
  • 13
    • 84989427471 scopus 로고
    • Heuristic lot-sizing approaches for dealing with MRP system nervousness
    • D.H. Kropp, R.C. Carlson, J.V. Jucker, Heuristic lot-sizing approaches for dealing with MRP system nervousness. Decision Sciences 14, 1983, 156-169.
    • (1983) Decision Sciences , vol.14 , pp. 156-169
    • Kropp, D.H.1    Carlson, R.C.2    Jucker, J.V.3
  • 14
    • 0021373333 scopus 로고
    • A lot-sizing algorithm for reducing nervousness in MRP systems Management
    • D.H. Kropp, R.C. Carlson, A lot-sizing algorithm for reducing nervousness in MRP systems Management Science 30 1984, 240-244.
    • (1984) Science , vol.30 , pp. 240-244
    • Kropp, D.H.1    Carlson, R.C.2
  • 15
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled - Way of life MRP?
    • H. Mather, Reschedule the reschedules you just rescheduled - way of life MRP?, Production and Inventory Management 18 (4) 1977, 60-79.
    • (1977) Production and Inventory Management , vol.18 , Issue.4 , pp. 60-79
    • Mather, H.1
  • 22
    • 0016843112 scopus 로고
    • The nervous MRP system: How to do battle
    • D.C. Steele, The nervous MRP system: How to do battle, Production and Inventory Management 16 (4) 1975, 83-89.
    • (1975) Production and Inventory Management , vol.16 , Issue.4 , pp. 83-89
    • Steele, D.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.