Volumn 16, Issue 5, 1998, Pages 321-327

An analysis method in project management using primal-dual relationships

Author keywords

Critical path programming; Linear programming; PERT cost; Project management

Indexed keywords

COST ACCOUNTING; CRITICAL PATH ANALYSIS; LINEAR PROGRAMMING; MATHEMATICAL MODELS; PERT; PROBLEM SOLVING; STRATEGIC PLANNING;

EID: 0032188732     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0263-7863(97)00057-4     Document Type: Article
Times cited : (6)

References (21)
  • 2
    • 0024715589 scopus 로고
    • A classified bibliography of research on stochastic PERT networks: 1966-1987
    • Adlakha, V. G. and Kulkarni, V. G., A classified bibliography of research on stochastic PERT networks: 1966-1987. INFOR, 1989, 27, 272-296.
    • (1989) INFOR , vol.27 , pp. 272-296
    • Adlakha, V.G.1    Kulkarni, V.G.2
  • 3
    • 0022745027 scopus 로고
    • Stochastic bounds on distributions of optimal value functions with applications to PERT, network flows and reliability
    • Weiss, G., Stochastic bounds on distributions of optimal value functions with applications to PERT, network flows and reliability. Operations Research, 1986, 34, 595-605.
    • (1986) Operations Research , vol.34 , pp. 595-605
    • Weiss, G.1
  • 5
    • 0041706149 scopus 로고
    • On estimating the probability distribution function in PERT type networks
    • Operations Research Program, Raleigh, NC
    • Dodin, B., On estimating the probability distribution function in PERT type networks. Operations Research Report, No. 153. Operations Research Program, Raleigh, NC, 1980.
    • (1980) Operations Research Report , Issue.153
    • Dodin, B.1
  • 6
    • 0021469459 scopus 로고
    • Determining the most critical paths in PERT networks
    • Dodin, B., Determining the most critical paths in PERT networks. Operations Research, 1984, 32, 859-877.
    • (1984) Operations Research , vol.32 , pp. 859-877
    • Dodin, B.1
  • 7
    • 0022099676 scopus 로고
    • Bounding the project completion time distribution in PERT networks
    • Dodin, B., Bounding the project completion time distribution in PERT networks. Operations Research, 1985, 33, 862-881.
    • (1985) Operations Research , vol.33 , pp. 862-881
    • Dodin, B.1
  • 12
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost and quality considerations
    • Babu, A. J. G. and Suresh, N., Project management with time, cost and quality considerations. European Journal of Operational Research, 1996, 88, 320-327.
    • (1996) European Journal of Operational Research , vol.88 , pp. 320-327
    • Babu, A.J.G.1    Suresh, N.2
  • 16
    • 0000181338 scopus 로고
    • A network flows computation for project cost curves
    • Fulkerson, D. R., A network flows computation for project cost curves. Management Science, 1961, 7, 167-178.
    • (1961) Management Science , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 18
    • 0001620447 scopus 로고
    • Critical-path planning and scheduling: Mathematical basis
    • Kelly, J., Critical-path planning and scheduling: mathematical basis. Operations Research, 1961, 9, 296-320.
    • (1961) Operations Research , vol.9 , pp. 296-320
    • Kelly, J.1
  • 20
    • 44649126168 scopus 로고
    • University of British Columbia
    • Suoweland, C., Lecture Notes, University of British Columbia, 1974.
    • (1974) Lecture Notes
    • Suoweland, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.