-
3
-
-
38249034192
-
Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
-
Flynn, B. B., 1987, Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops. Journal of Operations Management, 7, 203-216.
-
(1987)
Journal of Operations Management
, vol.7
, pp. 203-216
-
-
Flynn, B.B.1
-
4
-
-
0022785585
-
A simulation comparison of group technology with traditional job shop manufacturing
-
Flynn, B. B. and Jacobs, F. R., 1986, A simulation comparison of group technology with traditional job shop manufacturing. International Journal of Production Research, 24, 1171-1192.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1171-1192
-
-
Flynn, B.B.1
Jacobs, F.R.2
-
5
-
-
84985773741
-
An experimental comparison of cellular (Group technology) layout with process layout
-
Flynn, B. B. and Jacobs, F. R., 1987, An experimental comparison of cellular (group technology) layout with process layout. Decision Sciences, 18, 562-581.
-
(1987)
Decision Sciences
, vol.18
, pp. 562-581
-
-
Flynn, B.B.1
Jacobs, F.R.2
-
6
-
-
0002855196
-
Countering the negative impact of intercell flow in cellular manufacturing
-
Garza, O. and Smunt, T. L., 1991, Countering the negative impact of intercell flow in cellular manufacturing. Journal of Operations Management, 10, 92-118.
-
(1991)
Journal of Operations Management
, vol.10
, pp. 92-118
-
-
Garza, O.1
Smunt, T.L.2
-
7
-
-
84985801774
-
Repetitive lots: Flow time reductions through sequencing and dynamic batch sizing
-
Jacobs, R. and Bragg, D., 1988, Repetitive lots: flow time reductions through sequencing and dynamic batch sizing. Decision Sciences, 19, 281-294.
-
(1988)
Decision Sciences
, vol.19
, pp. 281-294
-
-
Jacobs, R.1
Bragg, D.2
-
8
-
-
0030106740
-
Machine dedication and process flexibility in a group technology environment
-
Jensen, J. B., Malhotra, M. K. and Philipoom, P. R., 1996, Machine dedication and process flexibility in a group technology environment. Journal of Operations Management, 14, 19-39.
-
(1996)
Journal of Operations Management
, vol.14
, pp. 19-39
-
-
Jensen, J.B.1
Malhotra, M.K.2
Philipoom, P.R.3
-
11
-
-
0026220052
-
A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
-
Mahmoodi, F. and Dooley, K. J., 1991, A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. International Journal of Production Research, 29, 1923-1939.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1923-1939
-
-
Mahmoodi, F.1
Dooley, K.J.2
-
12
-
-
45149135939
-
An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system
-
Mahmoodi, F., Dooley, K. J. and Starr, P. J., 1990a, An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system. Journal of Operations Management, 9, 548-572.
-
(1990)
Journal of Operations Management
, vol.9
, pp. 548-572
-
-
Mahmoodi, F.1
Dooley, K.J.2
Starr, P.J.3
-
13
-
-
0025485232
-
An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
-
Mahmoodi, F., Dooley, K. J. and Starr, P. J., 1990b, An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell. International Journal of Production Research, 28, 1695-1711.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1695-1711
-
-
Mahmoodi, F.1
Dooley, K.J.2
Starr, P.J.3
-
14
-
-
0002765014
-
Dynamic group scheduling heuristics in a flow-through cell environment
-
Mahmoodi, F., Tierney, E. J. and Mosier, C. T., 1992, Dynamic group scheduling heuristics in a flow-through cell environment. Decision Sciences, 23, 61-85.
-
(1992)
Decision Sciences
, vol.23
, pp. 61-85
-
-
Mahmoodi, F.1
Tierney, E.J.2
Mosier, C.T.3
-
15
-
-
0040522363
-
-
Homewood: Dow Jones-Irwin)
-
Melnyk, S. A., Carter, P. L., Dilts, D. M. and Lyth, D. M., 1985, Shop Floor Control (Homewood: Dow Jones-Irwin).
-
(1985)
Shop Floor Control
-
-
Melnyk, S.A.1
Carter, P.L.2
Dilts, D.M.3
Lyth, D.M.4
-
16
-
-
0000560047
-
A comparison of cell loading practices in group technology
-
Morris, J. S. and Tersine, R. J., 1989, A comparison of cell loading practices in group technology. Journal of Manufacturing Operations Management, 2, 299-313.
-
(1989)
Journal of Manufacturing Operations Management
, vol.2
, pp. 299-313
-
-
Morris, J.S.1
Tersine, R.J.2
-
17
-
-
0025560330
-
A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
-
Morris, J. S. and Tersine, R. J., 1990, A simulation analysis of factors influencing the attractiveness of group technology cellular layouts. Management Science, 36, 1567-1578.
-
(1990)
Management Science
, vol.36
, pp. 1567-1578
-
-
Morris, J.S.1
Tersine, R.J.2
-
18
-
-
0021499969
-
Analysis of group technology scheduling heuristics
-
Mosier, C. T., Elvers, D. A. and Kelly, D., 1984, Analysis of group technology scheduling heuristics. International Journal of Production Research, 22, 857-875.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 857-875
-
-
Mosier, C.T.1
Elvers, D.A.2
Kelly, D.3
-
21
-
-
33749276677
-
Sequencing rules and due date setting procedures in flow line cells with family setups
-
Russell, G. R. and Philipoom, P. R., 1991, Sequencing rules and due date setting procedures in flow line cells with family setups. Journal of Operations Management, 10, 524-545.
-
(1991)
Journal of Operations Management
, vol.10
, pp. 524-545
-
-
Russell, G.R.1
Philipoom, P.R.2
-
22
-
-
0026373412
-
On scheduling parallel machines with two setup classes
-
Rajgopal, J. and Bidanda, B., 1991, On scheduling parallel machines with two setup classes. International Journal of Production Research, 29, 2443-2458.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2443-2458
-
-
Rajgopal, J.1
Bidanda, B.2
-
24
-
-
0025413493
-
Some heuristics for scheduling jobs on parallel machines with setups
-
So, K. C., 1990, Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36, 467-475.
-
(1990)
Management Science
, vol.36
, pp. 467-475
-
-
So, K.C.1
-
25
-
-
0028406510
-
Coping with the loss of pooling synergy in cellular manufacturing systems
-
Suresh, N. C. and Meredith, J. R., 1994, Coping with the loss of pooling synergy in cellular manufacturing systems. Management Science, 40, 466-483.
-
(1994)
Management Science
, vol.40
, pp. 466-483
-
-
Suresh, N.C.1
Meredith, J.R.2
-
27
-
-
0020291133
-
On scheduling in a GT environment
-
Vaithianathan, R. and McRoberts, K. L., 1982, On scheduling in a GT environment. Journal of Manufacturing Systems, 2, 149-155.
-
(1982)
Journal of Manufacturing Systems
, vol.2
, pp. 149-155
-
-
Vaithianathan, R.1
Mc Roberts, K.L.2
-
29
-
-
9644287019
-
Job and family scheduling of a flow-line manufacturing cell: A simulation study
-
Wemmerlov, U. and Vakharia, A. J., 1991, Job and family scheduling of a flow-line manufacturing cell: a simulation study. IIE Transactions, 23, 383-393.
-
(1991)
IIE Transactions
, vol.23
, pp. 383-393
-
-
Wemmerlov, U.1
Vakharia, A.J.2
|