-
1
-
-
0015476092
-
The effect of station breakdowns and random processing times on the capacity of flow lines with inprocess storage
-
Buzacott, J. A., 1972, The effect of station breakdowns and random processing times on the capacity of flow lines with inprocess storage. AIIE Transactions, 4, 308-312.
-
(1972)
AIIE Transactions
, vol.4
, pp. 308-312
-
-
Buzacott, J.A.1
-
2
-
-
0025566605
-
-
Commault, C., and Dallery, Y., 1990, Production rate of transfer lines without buffer storage. IIE Transactions, 22, 315-326.
-
(1990)
Production Rate of Transfer Lines without Buffer Storage. IIE Transactions
, vol.22
, pp. 315-326
-
-
Commault, C.1
Dallery, Y.2
-
3
-
-
0028393057
-
Assembly system design principles and trade-offs
-
Daganzo, C. F., and Blumenfeld, D., 1994, Assembly system design principles and trade-offs. International Journal of Product Research, 32, 669-681.
-
(1994)
International Journal of Product Research
, vol.32
, pp. 669-681
-
-
Daganzo, C.F.1
Blumenfeld, D.2
-
4
-
-
5844387991
-
Reliability analysis of production systems with buffer storage
-
Elsayed, E. A., and Turley, R. E., 1980, Reliability analysis of production systems with buffer storage. International Journal of Product Research, 5, 637-645.
-
(1980)
International Journal of Product Research
, vol.5
, pp. 637-645
-
-
Elsayed, E.A.1
Turley, R.E.2
-
5
-
-
11544295775
-
The availability of a two-stage production line with intermediate buffer
-
June, Paris, France
-
El-Tamimi, A., and Savsar, M., 1987, The availability of a two-stage production line with intermediate buffer. IASTED Reliability and Quality Control Conference, 24-26 June, Paris, France, pp. 117-120.
-
(1987)
IASTED Reliability and Quality Control Conference
, vol.24-26
, pp. 117-120
-
-
El-Tamimi, A.1
Savsar, M.2
-
6
-
-
0020721475
-
Modeling and analysis of three-stage transfer lines with unreliable machines and finite buffers
-
GErshwin, S. B., and Schick, I. C., 1983, Modeling and analysis of three-stage transfer lines with unreliable machines and finite buffers. Operations Research, 31, 354-380.
-
(1983)
Operations Research
, vol.31
, pp. 354-380
-
-
Gershwin, S.B.1
Schick, I.C.2
-
7
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh, S., and Gagnon, R. J., 1989, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Product Research, 27, 637-670.
-
(1989)
International Journal of Product Research
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
10
-
-
0026239015
-
The effect of machine breakdowns and inter-stage storage on the performance of production line systems
-
Hillier, S. F., and So, K C., 1991, The effect of machine breakdowns and inter-stage storage on the performance of production line systems. International Journal of Product Research, 30, 2043-2055.
-
(1991)
International Journal of Product Research
, vol.30
, pp. 2043-2055
-
-
Hillier, S.F.1
So, K.C.2
-
11
-
-
0017504870
-
-
Ignall, E., and Silver, A., 1977, The output of a two-stage system with unreliable machines and limited storage. a iie Transactions, 9, 183-194.
-
(1977)
The Output of a Two-Stage System with Unreliable Machines and Limited Storage. a Iie Transactions
, vol.9
, pp. 183-194
-
-
Ignall, E.1
Silver, A.2
-
12
-
-
0002975775
-
Scheduling duplicate serial stations in transfer lines
-
Inman, R. R., and Leon, M., 1994, Scheduling duplicate serial stations in transfer lines. International Journal of Product Research, 34, 2631-2664.
-
(1994)
International Journal of Product Research
, vol.34
, pp. 2631-2664
-
-
Inman, R.R.1
Leon, M.2
-
13
-
-
0022953553
-
Job-shop scheduling using automated reasoning: A case study for the car sequencing problem
-
Parello, B. D., and Kabat, W C., 1986, Job-shop scheduling using automated reasoning: a case study for the car sequencing problem. Journal of Automated Reasoning, 2, 1-42.
-
(1986)
Journal of Automated Reasoning
, vol.2
, pp. 1-42
-
-
Parello, B.D.1
Kabat, W.C.2
-
15
-
-
11544354537
-
Production line simulator evaluates performance of system design alternatives
-
Savsar, M, 1989, Production line simulator evaluates performance of system design alternatives. Industrial e ngineering, 5, 60-63.
-
(1989)
Industrial E Ngineering
, vol.5
, pp. 60-63
-
-
Savsar, M.1
-
16
-
-
0021427333
-
Two-stage production lines with a single repair crew
-
Savsar, M., and Biles, W. E., 1984, Two-stage production lines with a single repair crew. International Journal of Product Research, 22, 499-514.
-
(1984)
International Journal of Product Research
, vol.22
, pp. 499-514
-
-
Savsar, M.1
Biles, W.E.2
-
17
-
-
0010396807
-
-
Savsar, M., and Biles, W E., 1985, Simulation analysis of automated production flow lines. material Flow, 2, 191-201.
-
(1985)
Simulation Analysis of Automated Production Flow Lines. Material Flow
, vol.2
, pp. 191-201
-
-
Savsar, M.1
Biles, W.E.2
-
18
-
-
0024304458
-
Impact of parallel processing on job sequences in flexible assembly systems
-
Udomkesmalee, N., and Daganzo, C F., 1989, Impact of parallel processing on job sequences in flexible assembly systems. International Journal of Product Research, 27, 1210-1232.
-
(1989)
International Journal of Product Research
, vol.27
, pp. 1210-1232
-
-
Udomkesmalee, N.1
Daganzo, C.F.2
-
20
-
-
0023366797
-
A general model of a production line with intermediate buffer and station breakdown
-
Yeralan, S., and Muth, E. J., 1987, A general model of a production line with intermediate buffer and station breakdown. IIE Transactions, 19, 130-139.
-
(1987)
IIE Transactions
, vol.19
, pp. 130-139
-
-
Yeralan, S.1
Muth, E.J.2
|