-
1
-
-
0023315289
-
Strategic Allocation of Inspection Effort in a Serial, Multi-Product Production System
-
Chakravarty, A. K. and A. Shtub, "Strategic Allocation of Inspection Effort in a Serial, Multi-Product Production System," IIE Trans., 3 (1987), 13-22.
-
(1987)
IIE Trans.
, vol.3
, pp. 13-22
-
-
Chakravarty, A.K.1
Shtub, A.2
-
2
-
-
0002395681
-
Chance-constrained Programming
-
Charnes, A. and W. W. Cooper, "Chance-constrained Programming," Management Sci., 5 (1959), 73-79.
-
(1959)
Management Sci.
, vol.5
, pp. 73-79
-
-
Charnes, A.1
Cooper, W.W.2
-
3
-
-
0022738841
-
The Two-inspector Problem
-
Drury, C. G., M. H. Karwan, and D. R. Vanderwarker, "The Two-inspector Problem," IIE Trans., 18 (1986), 174-181.
-
(1986)
IIE Trans.
, vol.18
, pp. 174-181
-
-
Drury, C.G.1
Karwan, M.H.2
Vanderwarker, D.R.3
-
5
-
-
0016048858
-
Optimal Location of Inspection Stations in a Multistage Production Process
-
Eppen, Gary D. and E. Gerald Hurst, Jr., "Optimal Location of Inspection Stations in a Multistage Production Process," Management Sci., 20 (1974), 1194-1200.
-
(1974)
Management Sci.
, vol.20
, pp. 1194-1200
-
-
Eppen, G.D.1
Hurst Jr., E.G.2
-
6
-
-
0002284861
-
Repetitive Testing in the Presence of Inspection Errors
-
Greenberg, Betsy S. and S. Lynne Stokes, "Repetitive Testing in the Presence of Inspection Errors," Technometrics, 37 (1995), 102-111.
-
(1995)
Technometrics
, vol.37
, pp. 102-111
-
-
Greenberg, B.S.1
Stokes, S.L.2
-
7
-
-
0004166442
-
-
Addison-Wesley, Reading, MA
-
Harry, Michael J. and J. Ronald Lawson, Six Sigma Producibility Analysis and Process Characterization, Addison-Wesley, Reading, MA, 1992.
-
(1992)
Six Sigma Producibility Analysis and Process Characterization
-
-
Harry, M.J.1
Lawson, J.R.2
-
8
-
-
0006602527
-
Multiple Inspections to Meet Desired Outgoing Quality
-
Jaraiedi, Majid, Dev S. Kochhar, and Suresh C. Jasingh, "Multiple Inspections to Meet Desired Outgoing Quality," J. Quality Technology, 19 (1987), 46-51.
-
(1987)
J. Quality Technology
, vol.19
, pp. 46-51
-
-
Jaraiedi, M.1
Kochhar, D.S.2
Jasingh, S.C.3
-
9
-
-
0001012373
-
Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
-
Lee, Hau, "Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework," Management Sci., 38 (1992), 1314-1328.
-
(1992)
Management Sci.
, vol.38
, pp. 1314-1328
-
-
Lee, H.1
-
11
-
-
84985801795
-
Location of Quality Inspection Stations: An Experimental Assessment of Five Normative Heuristics
-
Peters, Michael H. and William W. Williams, "Location of Quality Inspection Stations: An Experimental Assessment of Five Normative Heuristics," Decision Sciences, 15 (1984), 389-408.
-
(1984)
Decision Sciences
, vol.15
, pp. 389-408
-
-
Peters, M.H.1
Williams, W.W.2
-
12
-
-
0023313761
-
Economic Design of Quality Monitoring Efforts for Multi-stage Production Systems
-
_ and _, "Economic Design of Quality Monitoring Efforts for Multi-stage Production Systems," IIE Trans., 3 (1987), 81-87.
-
(1987)
IIE Trans.
, vol.3
, pp. 81-87
-
-
-
13
-
-
85034287679
-
Huh? Chipmakers Copying Steelmakers?
-
August 15
-
Port, Otis, "Huh? Chipmakers Copying Steelmakers?" Business Week, August 15, 1994, 97-98.
-
(1994)
Business Week
, pp. 97-98
-
-
Port, O.1
-
14
-
-
0020810766
-
A Cost-Minimization Model for Multicharacteristic Component Inspection
-
Raouf, A., J. K. Jain, and P. T. Sathe, "A Cost-Minimization Model for Multicharacteristic Component Inspection," IIE Trans., 15 (1983), 187-194.
-
(1983)
IIE Trans.
, vol.15
, pp. 187-194
-
-
Raouf, A.1
Jain, J.K.2
Sathe, P.T.3
-
15
-
-
0001650113
-
A Survey of Models for Allocation Inspection Effort in Multistage Production Systems
-
Raz, Tzvi, "A Survey of Models for Allocation Inspection Effort in Multistage Production Systems," J. Quality Technology, 18 (1986), 239-246.
-
(1986)
J. Quality Technology
, vol.18
, pp. 239-246
-
-
Raz, T.1
-
16
-
-
0023362431
-
Sequencing of Imperfect Inspection Operations Subject to Constraints on the Quality of Accepted and Rejected Units
-
_ and Dennis Bricker, "Sequencing of Imperfect Inspection Operations Subject to Constraints on the Quality of Accepted and Rejected Units," International J. Production Res., 25 (1987), 809-821.
-
(1987)
International J. Production Res.
, vol.25
, pp. 809-821
-
-
Bricker, D.1
-
17
-
-
0026205992
-
Location and Sequencing of Imperfect Inspection Operations in Serial Multi-stage Production Systems
-
_ and Moshe Kaspi, "Location and Sequencing of Imperfect Inspection Operations in Serial Multi-stage Production Systems," International J. Production Res., 29 (1991), 1645-1659.
-
(1991)
International J. Production Res.
, vol.29
, pp. 1645-1659
-
-
Kaspi, M.1
-
18
-
-
0020721960
-
A Method for Sequencing Inspection Activities Subject to Errors
-
_ and M. U. Thomas, "A Method for Sequencing Inspection Activities Subject to Errors," IIE Trans., 15 (1983), 12-18.
-
(1983)
IIE Trans.
, vol.15
, pp. 12-18
-
-
Thomas, M.U.1
-
21
-
-
0028465892
-
Design of Screening Procedures: A Review
-
Tang, Kwei and Jen Tang, "Design of Screening Procedures: A Review," J. Quality Technology, 26 (1994), 209-226.
-
(1994)
J. Quality Technology
, vol.26
, pp. 209-226
-
-
Tang, K.1
Tang, J.2
-
22
-
-
0019657928
-
The Optimal Allocation of Inspection Effort in a Class of Nonserial Production Systems
-
Yum, Bong J. and Edward D. McDowell, "The Optimal Allocation of Inspection Effort in a Class of Nonserial Production Systems," AIIE Trans., 13 (1981), 285-293.
-
(1981)
AIIE Trans.
, vol.13
, pp. 285-293
-
-
Yum, B.J.1
McDowell, E.D.2
|