메뉴 건너뛰기




Volumn 23, Issue 3-5, 1998, Pages 109-111

Minimizing variation in stochastic flow shop

Author keywords

Flow shop; Scheduling; Stochastic order

Indexed keywords

OPTIMIZATION; PROCESS CONTROL; RANDOM PROCESSES; SCHEDULING;

EID: 0032178123     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0167-6377(98)00039-x     Document Type: Article
Times cited : (10)

References (3)
  • 1
    • 0000797681 scopus 로고
    • Rearrangement, majorization and stochastic scheduling
    • C.-S. Chang, D.D. Yao, Rearrangement, majorization and stochastic scheduling, Math. Oper. Res. 18 (1993) 658-684.
    • (1993) Math. Oper. Res. , vol.18 , pp. 658-684
    • Chang, C.-S.1    Yao, D.D.2
  • 2
    • 0021581326 scopus 로고
    • Minimizing the expected flow time in stochastic flow shops
    • R.D. Foley, S. Suresh, Minimizing the expected flow time in stochastic flow shops, IIE Trans. 16 (1984) 391-395.
    • (1984) IIE Trans. , vol.16 , pp. 391-395
    • Foley, R.D.1    Suresh, S.2
  • 3
    • 0019899745 scopus 로고
    • Minimizing the expected makespan in stochastic flow shops
    • M. Pinedo, Minimizing the expected makespan in stochastic flow shops, Oper. Res. 30 (1982) 148-162.
    • (1982) Oper. Res. , vol.30 , pp. 148-162
    • Pinedo, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.