메뉴 건너뛰기




Volumn 109, Issue 3, 1998, Pages 571-586

Managing variances in manufacturing system design

Author keywords

Production line design; Resource allocation; Stochastic models; Variance management

Indexed keywords

COMPUTER SIMULATION; DECISION THEORY; HEURISTIC METHODS; INVENTORY CONTROL; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PROCESS ENGINEERING; PRODUCTION ENGINEERING; RANDOM PROCESSES; RESOURCE ALLOCATION;

EID: 0032168352     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00151-3     Document Type: Article
Times cited : (4)

References (15)
  • 2
    • 0024702612 scopus 로고
    • Tradeoff curves, targeting and balancing in manufacturing queuing networks
    • Bitran, G.R., Tirupati, D., 1989. Tradeoff curves, targeting and balancing in manufacturing queuing networks. Operations Research 37 (4), 547-564.
    • (1989) Operations Research , vol.37 , Issue.4 , pp. 547-564
    • Bitran, G.R.1    Tirupati, D.2
  • 5
    • 0000044386 scopus 로고
    • Brownian models of queuing networks with heterogeneous customer population
    • Fleming, W., Lions, P.L. (Eds.) Springer-Verlag, New York
    • Harrison, J.M., 1988. Brownian models of queuing networks with heterogeneous customer population. In: Fleming, W., Lions, P.L. (Eds.), Stochastic Differential Systems, Stochastic Control Theory and Applications, IMA vol. 10. Springer-Verlag, New York, pp. 147-186.
    • (1988) Stochastic Differential Systems, Stochastic Control Theory and Applications, IMA , vol.10 , pp. 147-186
    • Harrison, J.M.1
  • 6
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U.S., 1987. Lot sizes, lead times and in-process inventories. Management Science 33 (3), 409-418.
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 10
    • 0002816593 scopus 로고
    • A heavy traffic limit theorem for networks of queues with multiple customer types
    • Peterson, W.P., 1991. A heavy traffic limit theorem for networks of queues with multiple customer types. Mathematics of Operations Research 16 (1), 90-118.
    • (1991) Mathematics of Operations Research , vol.16 , Issue.1 , pp. 90-118
    • Peterson, W.P.1
  • 11
    • 0028399573 scopus 로고
    • The optimality of the 'cut across the board' rule applied to an inventory model
    • Rosenblatt, M.J., Rothblum, U.G., 1994. The optimality of the 'cut across the board' rule applied to an inventory model. IIE Transactions 26 (2), 102-108.
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 102-108
    • Rosenblatt, M.J.1    Rothblum, U.G.2
  • 13
    • 0025568624 scopus 로고
    • The impact of uncertainty on a production line
    • Tang, C.S., 1990. The impact of uncertainty on a production line. Management Science 36 (12), 1518-1531.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1518-1531
    • Tang, C.S.1
  • 14
    • 0024682229 scopus 로고
    • Capacity allocation in generalized Jackson networks
    • Wein, L.M., 1989. Capacity allocation in generalized Jackson networks. Operations Research Letters 8, 143-146.
    • (1989) Operations Research Letters , vol.8 , pp. 143-146
    • Wein, L.M.1
  • 15
    • 0001598811 scopus 로고
    • Dynamic scheduling of a multiclass make-to-stock queue
    • Wein, L.M., 1992. Dynamic scheduling of a multiclass make-to-stock queue. Operations Research 40 (4), 724-735.
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 724-735
    • Wein, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.