-
1
-
-
0001233812
-
-
Working paper, IBM Thomas J. Watson Research Center, Yorktown Heights, NY
-
Aggarwal, A., J. K. Park. 1990. Improved algorithms for economic lot-size problems. Working paper, IBM Thomas J. Watson Research Center, Yorktown Heights, NY.
-
(1990)
Improved Algorithms for Economic Lot-size Problems
-
-
Aggarwal, A.1
Park, J.K.2
-
2
-
-
0021482243
-
Conditions for the existence of planning horizons
-
Bean, J., R. L. Smith. 1984. Conditions for the existence of planning horizons. Math. Oper. Res. 9 391-401.
-
(1984)
Math. Oper. Res.
, vol.9
, pp. 391-401
-
-
Bean, J.1
Smith, R.L.2
-
3
-
-
0027576848
-
Conditions for the discovery of solution horizons
-
_, _. 1993. Conditions for the discovery of solution horizons. Math. Programming 59 215-229.
-
(1993)
Math. Programming
, vol.59
, pp. 215-229
-
-
-
5
-
-
0024016680
-
Concepts of forecast and decision horizons: Applications to dynamic stochastic optimization problems
-
Bès, C., S. Sethi. 1988. Concepts of forecast and decision horizons: Applications to dynamic stochastic optimization problems. Math. Oper. Res. 13 295-310.
-
(1988)
Math. Oper. Res.
, vol.13
, pp. 295-310
-
-
Bès, C.1
Sethi, S.2
-
6
-
-
0010308344
-
Planning horizons for the dynamic lot size model with backlogging
-
Blackburn, J, D., H. Kunreuther. 1974. Planning horizons for the dynamic lot size model with backlogging. Management Sci. 21 251-255.
-
(1974)
Management Sci.
, vol.21
, pp. 251-255
-
-
Blackburn, J.D.1
Kunreuther, H.2
-
7
-
-
0020200770
-
Lot sizing for products with finite demand horizon and periodic review policy
-
Chand, S. 1982. Lot sizing for products with finite demand horizon and periodic review policy. European J. Oper. Res. 11 145-148.
-
(1982)
European J. Oper. Res.
, vol.11
, pp. 145-148
-
-
Chand, S.1
-
8
-
-
0010354773
-
Minimal forecast horizon procedures for dynamic lot size models
-
_, T. E. Morton. 1986. Minimal forecast horizon procedures for dynamic lot size models. Naval Res. Logist. Quart. 33 111-122.
-
(1986)
Naval Res. Logist. Quart.
, vol.33
, pp. 111-122
-
-
Morton, T.E.1
-
9
-
-
0025488499
-
Existence of forecast horizons in undiscounted discrete-time lot size models
-
_, S. Sethi, J. M. Proth. 1990. Existence of forecast horizons in undiscounted discrete-time lot size models. Oper. Res. 38 884-892.
-
(1990)
Oper. Res.
, vol.38
, pp. 884-892
-
-
Sethi, S.1
Proth, J.M.2
-
12
-
-
0001343720
-
Extensions of the planning horizon theorem in the dynamic lot size model
-
Eppen, G. D., F. J. Gould, B. P. Pashigan. 1969. Extensions of the planning horizon theorem in the dynamic lot size model. Management Sci. 15 268-277.
-
(1969)
Management Sci.
, vol.15
, pp. 268-277
-
-
Eppen, G.D.1
Gould, F.J.2
Pashigan, B.P.3
-
13
-
-
0026208005
-
A simple forward algorithm to solve general dynamic lot sizing models with n periods
-
Federgruen, A., M. Tzur. 1991. A simple forward algorithm to solve general dynamic lot sizing models with n periods. Management Sci. 37 909-925.
-
(1991)
Management Sci.
, vol.37
, pp. 909-925
-
-
Federgruen, A.1
Tzur, M.2
-
15
-
-
0000356787
-
How many parts to make at once
-
Harris, F. W. 1913. How many parts to make at once. Factory: The Magazine of Management 10 135-136, 152. Reprint 1990, Oper. Res. 38 947-950.
-
(1913)
Factory: The Magazine of Management
, vol.10
, pp. 135-136
-
-
Harris, F.W.1
-
16
-
-
11344271383
-
-
Reprint
-
Harris, F. W. 1913. How many parts to make at once. Factory: The Magazine of Management 10 135-136, 152. Reprint 1990, Oper. Res. 38 947-950.
-
(1990)
Oper. Res.
, vol.38
, pp. 947-950
-
-
-
18
-
-
0010395597
-
Planning horizons for production smoothing with deterministic demands
-
Kunreuther, H. C., T. E. Morton. 1973. Planning horizons for production smoothing with deterministic demands. Management Sci. 20 110-125.
-
(1973)
Management Sci.
, vol.20
, pp. 110-125
-
-
Kunreuther, H.C.1
Morton, T.E.2
-
19
-
-
0016035795
-
General planning horizons for production smoothing with deterministic demands
-
_, _. 1974. General planning horizons for production smoothing with deterministic demands. Management Sci. 20 1037-1046.
-
(1974)
Management Sci.
, vol.20
, pp. 1037-1046
-
-
-
20
-
-
0017428173
-
Further results on planning horizons in the production smoothing problem
-
Lee, D. R., D. Orr. 1977. Further results on planning horizons in the production smoothing problem. Management Sci. 23 490-498.
-
(1977)
Management Sci.
, vol.23
, pp. 490-498
-
-
Lee, D.R.1
Orr, D.2
-
21
-
-
0001396613
-
Planning horizons for the dynamic lot size model: Zabel vs. protective procedures and computational results
-
Lundin, R. A., T. E. Morton. 1975. Planning horizons for the dynamic lot size model: Zabel vs. protective procedures and computational results. Oper. Res. 23 711-734.
-
(1975)
Oper. Res.
, vol.23
, pp. 711-734
-
-
Lundin, R.A.1
Morton, T.E.2
-
22
-
-
0002494252
-
Production planning over time and the nature of the expectation and planning horizon
-
Modigliani, F., F. E. Hohn. 1955. Production planning over time and the nature of the expectation and planning horizon. Econometrica 23 46-66.
-
(1955)
Econometrica
, vol.23
, pp. 46-66
-
-
Modigliani, F.1
Hohn, F.E.2
-
23
-
-
0018020221
-
The nonstationary infinite horizon inventory problem
-
Morton, T. 1978a. The nonstationary infinite horizon inventory problem. Management Sci. 24 1474-1482.
-
(1978)
Management Sci.
, vol.24
, pp. 1474-1482
-
-
Morton, T.1
-
24
-
-
0018031691
-
Universal planning horizons for generalized convex production scheduling
-
_. 1978b. Universal planning horizons for generalized convex production scheduling. Oper. Res. 26 1046-1058.
-
(1978)
Oper. Res.
, vol.26
, pp. 1046-1058
-
-
-
26
-
-
0026836044
-
Finite dimensional approximation in infinite dimensional mathematical programming
-
_, _. 1992. Finite dimensional approximation in infinite dimensional mathematical programming. Math. Programming 54 307-333.
-
(1992)
Math. Programming
, vol.54
, pp. 307-333
-
-
-
27
-
-
0001217172
-
Price-production decisions with deterministic demand
-
Thomas, L. J. 1970. Price-production decisions with deterministic demand. Management Sci. 16 747-750.
-
(1970)
Management Sci.
, vol.16
, pp. 747-750
-
-
Thomas, L.J.1
-
28
-
-
0018986841
-
Turnpike horizons for production planning
-
Thompson, G. L., S. P. Sethi. 1980. Turnpike horizons for production planning. Management Sci. 26 229-241.
-
(1980)
Management Sci.
, vol.26
, pp. 229-241
-
-
Thompson, G.L.1
Sethi, S.P.2
-
29
-
-
0001405159
-
Production planning with convex costs: A parametric study
-
Veinott, A. F., Jr. 1964. Production planning with convex costs: A parametric study. Management Sci. 10 441-460.
-
(1964)
Management Sci.
, vol.10
, pp. 441-460
-
-
Veinott Jr., A.F.1
-
30
-
-
11344284336
-
-
CORE discussion paper no. 8922. Université Catholique de Louvain, Louvain-la-Neuve, Belgium
-
Wagelmans, A., S. Van Hoesel, A. Kolen. 1989. Economic lot-sizing An O(n log n)-algorithm that runs in linear time in the Wagner Whitin case. CORE discussion paper no. 8922. Université Catholique de Louvain, Louvain-la-Neuve, Belgium.
-
(1989)
Economic Lot-sizing An O(n Log n)-algorithm That Runs in Linear Time in the Wagner Whitin Case
-
-
Wagelmans, A.1
Van Hoesel, S.2
Kolen, A.3
-
31
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner, H. M., T. M. Whitin. 1958. Dynamic version of the economic lot size model. Management Sci. 5 89-96.
-
(1958)
Management Sci.
, vol.5
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
32
-
-
0000365422
-
Some generalizations of the inventory planning horizon theorem
-
Zabel, E. 1964. Some generalizations of the inventory planning horizon theorem. Management Sci. 10 465-471.
-
(1964)
Management Sci.
, vol.10
, pp. 465-471
-
-
Zabel, E.1
|