-
1
-
-
0019541161
-
A Multiple Objective Nurse Scheduling Model
-
ARTHUR, J. L. AND A. RAVINDRAN, "A Multiple Objective Nurse Scheduling Model," AIIE Trans. 13, 55-60 (1981).
-
(1981)
AIIE Trans.
, vol.13
, pp. 55-60
-
-
Arthur, J.L.1
Ravindran, A.2
-
2
-
-
0021694201
-
Integrated Days-Off and Shift Personnel Scheduling
-
BAILEY, J., "Integrated Days-Off and Shift Personnel Scheduling," Comput. Ind. Eng. 9, 395-404 (1985).
-
(1985)
Comput. Ind. Eng.
, vol.9
, pp. 395-404
-
-
Bailey, J.1
-
3
-
-
0028518189
-
Optimal Resource Leveling Using Non-Serial Dynamic Programming
-
BANDELLONI, M., M. TUCCI, AND R. RINALDI, "Optimal Resource Leveling Using Non-Serial Dynamic Programming," Eur. J. Oper. Res. 78, 162-177 (1994).
-
(1994)
Eur. J. Oper. Res.
, vol.78
, pp. 162-177
-
-
Bandelloni, M.1
Tucci, M.2
Rinaldi, R.3
-
4
-
-
84947651214
-
A Methodology for Labor Scheduling in a Service Operating System
-
BECHTOLD, S. E. AND M. J. SHOWALTER, "A Methodology for Labor Scheduling in a Service Operating System," Decision Sci. 18, 89-107 (1987).
-
(1987)
Decision Sci.
, vol.18
, pp. 89-107
-
-
Bechtold, S.E.1
Showalter, M.J.2
-
5
-
-
84985773391
-
A Comparative Evaluation of Labor Tour Scheduling Methods
-
BECHTOLD, S. E., M. BEUSCO, AND M. J. SHOWALTEE, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci. 22, 683-699 (1991).
-
(1991)
Decision Sci.
, vol.22
, pp. 683-699
-
-
Bechtold, S.E.1
Beusco, M.2
Showaltee, M.J.3
-
6
-
-
85029893805
-
Analysis and Control of Demand Peaks at Transportation Facilities
-
San Francisco
-
BROWNE, J. J. AND R. NANDA, "Analysis and Control of Demand Peaks at Transportation Facilities," Proc. AIIE Spring Conference, San Francisco, 339-406 (1987).
-
(1987)
Proc. AIIE Spring Conference
, pp. 339-406
-
-
Browne, J.J.1
Nanda, R.2
-
8
-
-
0015658401
-
Scheduling of Toll Collectors
-
BYRNE, J. T. AND R. B. POTTS, "Scheduling of Toll Collectors," Trans. Sci. 7, 224-245 (1973).
-
(1973)
Trans. Sci.
, vol.7
, pp. 224-245
-
-
Byrne, J.T.1
Potts, R.B.2
-
9
-
-
0002526047
-
Joint Determination of Machine Requirements and Shift Scheduling in Banking Operations
-
DAVIS, S. G. AND E. T. REUTZEL, "Joint Determination of Machine Requirements and Shift Scheduling in Banking Operations," Interfaces 11, 41-49 (1981).
-
(1981)
Interfaces
, vol.11
, pp. 41-49
-
-
Davis, S.G.1
Reutzel, E.T.2
-
10
-
-
0031104166
-
Crew Pairing at Air France
-
DESAULNIERS, G. J., DESROSIERS, Y. DUMAS, S. MARC, B. RIOUX, M. M. SOLOMON, AND F. SOUMIS, "Crew Pairing at Air France," Eur. J. Oper. Res. 97, 245-259 (1997).
-
(1997)
Eur. J. Oper. Res.
, vol.97
, pp. 245-259
-
-
Desaulniers, G.1
Desrosiers, J.2
Dumas, Y.3
Marc, S.4
Rioux, B.5
Solomon, M.M.6
Soumis, F.7
-
11
-
-
84985773418
-
Equivalent Alternate Solutions for the Tour Scheduling Problem
-
EASTON, F. F. AND D. F. ROSSIN, "Equivalent Alternate Solutions for the Tour Scheduling Problem," Decision Sci. 22, 985-1001 (1991).
-
(1991)
Decision Sci.
, vol.22
, pp. 985-1001
-
-
Easton, F.F.1
Rossin, D.F.2
-
13
-
-
0002267839
-
Telephone Sales Manpower Planning at Quanta
-
GABALLA, A. AND W. PEACE, "Telephone Sales Manpower Planning at Quanta," Interfaces 9, 1-9 (1979).
-
(1979)
Interfaces
, vol.9
, pp. 1-9
-
-
Gaballa, A.1
Peace, W.2
-
15
-
-
85029828629
-
-
Working Document, Air Canada, January
-
LEBEAU, L. AND B. PILON, "Cargo Manpower Planning System: A Situation Analysis," Working Document, Air Canada, January, 1990.
-
(1990)
Cargo Manpower Planning System: A Situation Analysis
-
-
Lebeau, L.1
Pilon, B.2
-
16
-
-
84985788591
-
An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost
-
LI, C., E. P. ROBINSON, AND V. A. MABERT, "An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost," Decision Sci. 22, 700-718 (1991).
-
(1991)
Decision Sci.
, vol.22
, pp. 700-718
-
-
Li, C.1
Robinson, E.P.2
Mabert, V.A.3
-
17
-
-
0020094037
-
A Customer Selectivity Approach to Operations at CN Express
-
ROY, J. AND M. RAVACLEY, "A Customer Selectivity Approach to Operations at CN Express," INFOR 20(1), 28-39 (1982).
-
(1982)
INFOR
, vol.20
, Issue.1
, pp. 28-39
-
-
Roy, J.1
Ravacley, M.2
-
18
-
-
0016079835
-
The Operator Scheduling Problem: A Network Flow Approach
-
SEGAL, M., "The Operator Scheduling Problem: A Network Flow Approach," Oper. Res. 22, 808-823 (1974).
-
(1974)
Oper. Res.
, vol.22
, pp. 808-823
-
-
Segal, M.1
-
19
-
-
84974872765
-
A Quick Heuristic for Some Cyclic Staffing Problem with Breaks
-
VOHRA, R. V., "A Quick Heuristic for Some Cyclic Staffing Problem with Breaks," J. Oper. Res. Soc. 39, 1057-1061 (1988).
-
(1988)
J. Oper. Res. Soc.
, vol.39
, pp. 1057-1061
-
-
Vohra, R.V.1
|