메뉴 건너뛰기




Volumn 32, Issue 3, 1998, Pages 295-301

Freight handling personnel scheduling at air cargo terminals

Author keywords

[No Author keywords available]

Indexed keywords

CARGO HANDLING; FREIGHT TRANSPORTATION; MATHEMATICAL MODELS; WORK-REST SCHEDULES;

EID: 0032136353     PISSN: 00411655     EISSN: None     Source Type: Journal    
DOI: 10.1287/trsc.32.3.295     Document Type: Article
Times cited : (42)

References (19)
  • 1
    • 0019541161 scopus 로고
    • A Multiple Objective Nurse Scheduling Model
    • ARTHUR, J. L. AND A. RAVINDRAN, "A Multiple Objective Nurse Scheduling Model," AIIE Trans. 13, 55-60 (1981).
    • (1981) AIIE Trans. , vol.13 , pp. 55-60
    • Arthur, J.L.1    Ravindran, A.2
  • 2
    • 0021694201 scopus 로고
    • Integrated Days-Off and Shift Personnel Scheduling
    • BAILEY, J., "Integrated Days-Off and Shift Personnel Scheduling," Comput. Ind. Eng. 9, 395-404 (1985).
    • (1985) Comput. Ind. Eng. , vol.9 , pp. 395-404
    • Bailey, J.1
  • 3
    • 0028518189 scopus 로고
    • Optimal Resource Leveling Using Non-Serial Dynamic Programming
    • BANDELLONI, M., M. TUCCI, AND R. RINALDI, "Optimal Resource Leveling Using Non-Serial Dynamic Programming," Eur. J. Oper. Res. 78, 162-177 (1994).
    • (1994) Eur. J. Oper. Res. , vol.78 , pp. 162-177
    • Bandelloni, M.1    Tucci, M.2    Rinaldi, R.3
  • 4
    • 84947651214 scopus 로고
    • A Methodology for Labor Scheduling in a Service Operating System
    • BECHTOLD, S. E. AND M. J. SHOWALTER, "A Methodology for Labor Scheduling in a Service Operating System," Decision Sci. 18, 89-107 (1987).
    • (1987) Decision Sci. , vol.18 , pp. 89-107
    • Bechtold, S.E.1    Showalter, M.J.2
  • 5
    • 84985773391 scopus 로고
    • A Comparative Evaluation of Labor Tour Scheduling Methods
    • BECHTOLD, S. E., M. BEUSCO, AND M. J. SHOWALTEE, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci. 22, 683-699 (1991).
    • (1991) Decision Sci. , vol.22 , pp. 683-699
    • Bechtold, S.E.1    Beusco, M.2    Showaltee, M.J.3
  • 6
    • 85029893805 scopus 로고
    • Analysis and Control of Demand Peaks at Transportation Facilities
    • San Francisco
    • BROWNE, J. J. AND R. NANDA, "Analysis and Control of Demand Peaks at Transportation Facilities," Proc. AIIE Spring Conference, San Francisco, 339-406 (1987).
    • (1987) Proc. AIIE Spring Conference , pp. 339-406
    • Browne, J.J.1    Nanda, R.2
  • 8
    • 0015658401 scopus 로고
    • Scheduling of Toll Collectors
    • BYRNE, J. T. AND R. B. POTTS, "Scheduling of Toll Collectors," Trans. Sci. 7, 224-245 (1973).
    • (1973) Trans. Sci. , vol.7 , pp. 224-245
    • Byrne, J.T.1    Potts, R.B.2
  • 9
    • 0002526047 scopus 로고
    • Joint Determination of Machine Requirements and Shift Scheduling in Banking Operations
    • DAVIS, S. G. AND E. T. REUTZEL, "Joint Determination of Machine Requirements and Shift Scheduling in Banking Operations," Interfaces 11, 41-49 (1981).
    • (1981) Interfaces , vol.11 , pp. 41-49
    • Davis, S.G.1    Reutzel, E.T.2
  • 11
    • 84985773418 scopus 로고
    • Equivalent Alternate Solutions for the Tour Scheduling Problem
    • EASTON, F. F. AND D. F. ROSSIN, "Equivalent Alternate Solutions for the Tour Scheduling Problem," Decision Sci. 22, 985-1001 (1991).
    • (1991) Decision Sci. , vol.22 , pp. 985-1001
    • Easton, F.F.1    Rossin, D.F.2
  • 12
  • 13
    • 0002267839 scopus 로고
    • Telephone Sales Manpower Planning at Quanta
    • GABALLA, A. AND W. PEACE, "Telephone Sales Manpower Planning at Quanta," Interfaces 9, 1-9 (1979).
    • (1979) Interfaces , vol.9 , pp. 1-9
    • Gaballa, A.1    Peace, W.2
  • 16
    • 84985788591 scopus 로고
    • An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost
    • LI, C., E. P. ROBINSON, AND V. A. MABERT, "An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost," Decision Sci. 22, 700-718 (1991).
    • (1991) Decision Sci. , vol.22 , pp. 700-718
    • Li, C.1    Robinson, E.P.2    Mabert, V.A.3
  • 17
    • 0020094037 scopus 로고
    • A Customer Selectivity Approach to Operations at CN Express
    • ROY, J. AND M. RAVACLEY, "A Customer Selectivity Approach to Operations at CN Express," INFOR 20(1), 28-39 (1982).
    • (1982) INFOR , vol.20 , Issue.1 , pp. 28-39
    • Roy, J.1    Ravacley, M.2
  • 18
    • 0016079835 scopus 로고
    • The Operator Scheduling Problem: A Network Flow Approach
    • SEGAL, M., "The Operator Scheduling Problem: A Network Flow Approach," Oper. Res. 22, 808-823 (1974).
    • (1974) Oper. Res. , vol.22 , pp. 808-823
    • Segal, M.1
  • 19
    • 84974872765 scopus 로고
    • A Quick Heuristic for Some Cyclic Staffing Problem with Breaks
    • VOHRA, R. V., "A Quick Heuristic for Some Cyclic Staffing Problem with Breaks," J. Oper. Res. Soc. 39, 1057-1061 (1988).
    • (1988) J. Oper. Res. Soc. , vol.39 , pp. 1057-1061
    • Vohra, R.V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.