메뉴 건너뛰기




Volumn 15, Issue 1, 1998, Pages 5-38

Stability and Performance of List Scheduling with External Process Delays

Author keywords

General instability conditions; Multiprocessor anomalies; Non preemptive scheduling; Phantom tasks; Priority list scheduling; Scheduling stability

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; HEURISTIC METHODS; MATHEMATICAL TRANSFORMATIONS; MULTIPROCESSING SYSTEMS; SCHEDULING; SYSTEM STABILITY;

EID: 0032121795     PISSN: 09226443     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1008094006346     Document Type: Article
Times cited : (3)

References (28)
  • 3
    • 0000153639 scopus 로고
    • Scheduling algorithms for hard real-time systems - A brief survey
    • J. A. Stankovic and K. Ramamritham (eds.)
    • Cheng, S.-C., Stankovic, J. A., and Ramamritham, K. 1988. Scheduling algorithms for hard real-time systems - A brief survey. In IEEE Tutorial - Hard Real-Time Systems, J. A. Stankovic and K. Ramamritham (eds.), pp. 150-173.
    • (1988) IEEE Tutorial - Hard Real-Time Systems , pp. 150-173
    • Cheng, S.-C.1    Stankovic, J.A.2    Ramamritham, K.3
  • 4
    • 0022062012 scopus 로고
    • On the expected relative performance of list scheduling
    • Coffman, E. G., and Gilbert, E. N. 1985. On the expected relative performance of list scheduling. Operations Research 33(3): 548-561.
    • (1985) Operations Research , vol.33 , Issue.3 , pp. 548-561
    • Coffman, E.G.1    Gilbert, E.N.2
  • 5
    • 0026223941 scopus 로고
    • Guaranteeing task deadlines for fault-tolerant workloads with conditional branches
    • Hugue, M. C., and Stotts, P. D. 1991. Guaranteeing task deadlines for fault-tolerant workloads with conditional branches. Real-Time Systems 3(3): 275-305.
    • (1991) Real-Time Systems , vol.3 , Issue.3 , pp. 275-305
    • Hugue, M.C.1    Stotts, P.D.2
  • 6
    • 0024647955 scopus 로고
    • Scheduling precedence graphs in systems with interprocessor communication times
    • Hwang, J.-J., Chow, Y.-C., Anger, F. D., and Lee, C. Y. 1989. Scheduling precedence graphs in systems with interprocessor communication times. SIAM Journal of Computing 18(2): 244-257.
    • (1989) SIAM Journal of Computing , vol.18 , Issue.2 , pp. 244-257
    • Hwang, J.-J.1    Chow, Y.-C.2    Anger, F.D.3    Lee, C.Y.4
  • 9
    • 0021529549 scopus 로고
    • Practical multiprocessor scheduling algorithms for efficient parallel processing
    • Kasahara, H., and Narita, S. 1984. Practical multiprocessor scheduling algorithms for efficient parallel processing. IEEE Trans. on Computers C-33(11): 1023-1029.
    • (1984) IEEE Trans. on Computers , vol.C-33 , Issue.11 , pp. 1023-1029
    • Kasahara, H.1    Narita, S.2
  • 10
    • 0022074147 scopus 로고
    • Parallel processing of robot-arm control computation on a multimicroprocessor system
    • Kasahara, H., and Narita, S. 1985. Parallel processing of robot-arm control computation on a multimicroprocessor system. IEEE Journal of Robotics and Automation 1(2): 104-113.
    • (1985) IEEE Journal of Robotics and Automation , vol.1 , Issue.2 , pp. 104-113
    • Kasahara, H.1    Narita, S.2
  • 11
    • 2342535726 scopus 로고
    • Parallel processing of robot control and simulation
    • A. Fijany and A. Bejczy (eds.). World Scientific Publishing Co. Ltd.
    • Kasahara, H. 1992. Parallel processing of robot control and simulation. Parallel Computation Systems for Robotics, A. Fijany and A. Bejczy (eds.). World Scientific Publishing Co. Ltd., pp. 77-93.
    • (1992) Parallel Computation Systems for Robotics , pp. 77-93
    • Kasahara, H.1
  • 18
    • 0019912405 scopus 로고
    • On scheduling independent tasks with restricted execution times
    • Leung, J. Y.-T. 1982. On scheduling independent tasks with restricted execution times. Operations Research 30(1): 163-171.
    • (1982) Operations Research , vol.30 , Issue.1 , pp. 163-171
    • Leung, J.Y.-T.1
  • 20
    • 84918850769 scopus 로고
    • Production and stabilization of real-time task schedules
    • Manacher, G. K. 1967. Production and stabilization of real-time task schedules. JACM 14(3).
    • (1967) JACM , vol.14 , Issue.3
    • Manacher, G.K.1
  • 24
    • 0025441528 scopus 로고
    • A multiprocessor implementation of real-time control for a turbojet engine
    • Shaffer, P. L. 1990. A multiprocessor implementation of real-time control for a turbojet engine. IEEE Control Systems Magazine 10(4): 38-42.
    • (1990) IEEE Control Systems Magazine , vol.10 , Issue.4 , pp. 38-42
    • Shaffer, P.L.1
  • 26
    • 0025522107 scopus 로고
    • Analysis and evaluation of heuristic methods for static task scheduling
    • Academic Press
    • Shirazi, B., Wang, M., and Pathak, G. 1990. Analysis and evaluation of heuristic methods for static task scheduling. J. Parallel and Distributed Computing 10: 222-230, Academic Press.
    • (1990) J. Parallel and Distributed Computing , vol.10 , pp. 222-230
    • Shirazi, B.1    Wang, M.2    Pathak, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.