-
1
-
-
0024144243
-
A pattern-recognition-based method for controlling a multi-loop production system
-
Adachi, T., Moodie, C. L., and Talavage, J. J., 1988, A pattern-recognition-based method for controlling a multi-loop production system. International Journal of Production Research, 26, 1943-1957.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1943-1957
-
-
Adachi, T.1
Moodie, C.L.2
Talavage, J.J.3
-
2
-
-
0027912254
-
Complexity of single machine, multi-criteria scheduling problems
-
Chen, C.-L., and Bulfin, R. L., 1993, Complexity of single machine, multi-criteria scheduling problems. European Journal of Operational Research, 70, 115-125.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 115-125
-
-
Chen, C.-L.1
Bulfin, R.L.2
-
3
-
-
0029404744
-
A learning-based methodology for dynamic scheduling in distributed manufacturing systems
-
Chiu, C., and Yih, Y., 1995, A learning-based methodology for dynamic scheduling in distributed manufacturing systems. International Journal of Production Research, 33, 3217-3232.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 3217-3232
-
-
Chiu, C.1
Yih, Y.2
-
4
-
-
0027576654
-
A robust adaptive scheduler for an intelligent workstation controller
-
Cho, H., and Wysk, R. A., 1993, A robust adaptive scheduler for an intelligent workstation controller. International Journal of Production Research, 31, 771-789.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 771-789
-
-
Cho, H.1
Wysk, R.A.2
-
6
-
-
0002218558
-
Bicriterion static scheduling research for a single machine
-
Dileepan, P., and Sen, T, 1988, Bicriterion static scheduling research for a single machine. OMEGA International Journal of Managment Science, 16, 53-59.
-
(1988)
OMEGA International Journal of Managment Science
, vol.16
, pp. 53-59
-
-
Dileepan, P.1
Sen, T.2
-
7
-
-
0017682606
-
Scheduling production on one machine with changeover costs
-
Driscoll, W., and Emmons, H., 1977, Scheduling production on one machine with changeover costs. AIIE Transactions, 9, 388-395.
-
(1977)
AIIE Transactions
, vol.9
, pp. 388-395
-
-
Driscoll, W.1
Emmons, H.2
-
8
-
-
0016552228
-
One machine sequencing to minimize mean flowtime with minimum number tardy
-
Emmons, H., 1975, One machine sequencing to minimize mean flowtime with minimum number tardy. Naval Research Logistics Quarterly, 22, 585-592.
-
(1975)
Naval Research Logistics Quarterly
, vol.22
, pp. 585-592
-
-
Emmons, H.1
-
9
-
-
0000855797
-
A framework for single machine multiple objective sequencing research
-
Fry, T. D., Armstrong, R. D., and Lewis, H., 1989, A framework for single machine multiple objective sequencing research. OMEGA International Journal of Management Science, 17, 596-607.
-
(1989)
OMEGA International Journal of Management Science
, vol.17
, pp. 596-607
-
-
Fry, T.D.1
Armstrong, R.D.2
Lewis, H.3
-
10
-
-
50749136055
-
A simulated annealing heuristic for scheduling in a flow shop with bicriteria
-
Gangadharan, R., and Rajendran, C., 1994, A simulated annealing heuristic for scheduling in a flow shop with bicriteria. Computers and Industrial Engineering, 27, 473-476.
-
(1994)
Computers and Industrial Engineering
, vol.27
, pp. 473-476
-
-
Gangadharan, R.1
Rajendran, C.2
-
12
-
-
0000949843
-
Minimum changeover scheduling of several products on one machine
-
Glassey, C. R., 1968, Minimum changeover scheduling of several products on one machine. Operational Research, 16, 342-352.
-
(1968)
Operational Research
, vol.16
, pp. 342-352
-
-
Glassey, C.R.1
-
13
-
-
0018012519
-
Interactive scheduling: Historical survey and state of the art
-
Godin, V. B., 1978, Interactive scheduling: historical survey and state of the art. AIIE Transactions 10, 331-337.
-
(1978)
AIIE Transactions
, vol.10
, pp. 331-337
-
-
Godin, V.B.1
-
15
-
-
0001670330
-
An investigation of the advantages of using man-computer interactive scheduling methodology for a job shop
-
Haider, S. W., Moodie, C. L., and Buck, J. R., 1981, An investigation of the advantages of using man-computer interactive scheduling methodology for a job shop. International Journal of Production Research, 19, 381-392.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 381-392
-
-
Haider, S.W.1
Moodie, C.L.2
Buck, J.R.3
-
16
-
-
84947155066
-
An interactive scheduler for production activity control
-
Jackson, S., and Browne, J., 1989, An interactive scheduler for production activity control. International Journal of Computer Integrated Manufacturing, 2, 2-14.
-
(1989)
International Journal of Computer Integrated Manufacturing
, vol.2
, pp. 2-14
-
-
Jackson, S.1
Browne, J.2
-
17
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
Kim, M. H., and Kim, Y.-D., 1994, Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.-D.2
-
18
-
-
0004311083
-
Preliminary design and development of a corporate-level production planning system for the semiconductor industry
-
Engineering Systems Research Center, University of California, Berkeley
-
Leachman, R. C., 1986, Preliminary design and development of a corporate-level production planning system for the semiconductor industry. ORC report 86-11, Engineering Systems Research Center, University of California, Berkeley.
-
(1986)
ORC report 86-11
-
-
Leachman, R.C.1
-
19
-
-
0001632220
-
Using unsupervised learning technologies to induce scheduling knowledge for FMSs
-
Li, D.-C., and She, I.-S., 1994, Using unsupervised learning technologies to induce scheduling knowledge for FMSs. International Journal of Production Research, 32, 2187-2199.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2187-2199
-
-
Li, D.-C.1
She, I.-S.2
-
20
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
MacCarthy, B. L., and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31, 59-79.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 59-79
-
-
Maccarthy, B.L.1
Liu, J.2
-
21
-
-
0023995707
-
An experimental study of human decision-making in computer-based scheduling of flexible manufacturing system
-
Nakamura, N., and Salvendy, G., 1988, An experimental study of human decision-making in computer-based scheduling of flexible manufacturing system. International Journal of Production Research, 26, 567-583.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 567-583
-
-
Nakamura, N.1
Salvendy, G.2
-
22
-
-
0026819312
-
Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool
-
Nakasuka, S., and Yoshida, T., 1992, Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool. International Journal of Production Research, 30, 411-431.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 411-431
-
-
Nakasuka, S.1
Yoshida, T.2
-
23
-
-
0028585426
-
Exploiting shop floor status information to schedule complex job shops
-
Ovacik, I. M., and Uzsoy, R., 1994a, Exploiting shop floor status information to schedule complex job shops. Journal of Manufacturing Systems, 13, 73-84.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 73-84
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
24
-
-
0028452709
-
Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
-
Ovacik, I. M., and Ozsoy, R., 1994b, Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32, 1243-1263.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1243-1263
-
-
Ovacik, I.M.1
Ozsoy, R.2
-
25
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
-
Ovacik, I. M., and Uzsoy, R., 1995, Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. International Journal of Production Research, 33, 3173-3192.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 3173-3192
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
26
-
-
0022905665
-
An integer goal programming formulation of a flow shop scheduling problem
-
Selen, W. J., and Hott, D. D., 1986, An integer goal programming formulation of a flow shop scheduling problem. Journal of the Operational Research Society, 37, 1121-1128.
-
(1986)
Journal of the Operational Research Society
, vol.37
, pp. 1121-1128
-
-
Selen, W.J.1
Hott, D.D.2
-
27
-
-
0020717649
-
A branch and bound procedure to solve a bicriterion scheduling problem
-
Sen, T., and Gupta, S. K., 1983, A branch and bound procedure to solve a bicriterion scheduling problem. IIE Transactions, 15, 84-88.
-
(1983)
IIE Transactions
, vol.15
, pp. 84-88
-
-
Sen, T.1
Gupta, S.K.2
-
28
-
-
0001360524
-
A branch-and-bound approach to the bicriterion scheduling problem involving total flowtime and range of lateness
-
Sen, T., Raiszadeh, F. M. E., and Dileepan, P., 1988, A branch-and-bound approach to the bicriterion scheduling problem involving total flowtime and range of lateness. Management Science, 34, 254-260.
-
(1988)
Management Science
, vol.34
, pp. 254-260
-
-
Sen, T.1
Raiszadeh, F.M.E.2
Dileepan, P.3
-
29
-
-
0242687748
-
A pattern-directed approach to flexible manufacturing: A framework for intelligent scheduling, learning and control
-
Shaw, M. J., 1989, A pattern-directed approach to flexible manufacturing: a framework for intelligent scheduling, learning and control. The International Journal of Flexible Manufacturing Systems, 2, 121-144.
-
(1989)
The International Journal of Flexible Manufacturing Systems
, vol.2
, pp. 121-144
-
-
Shaw, M.J.1
-
30
-
-
0000936343
-
Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
-
Shaw, M. J., Park, S., and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Transactions, 24, 156-168.
-
(1992)
IIE Transactions
, vol.24
, pp. 156-168
-
-
Shaw, M.J.1
Park, S.2
Raman, N.3
-
31
-
-
0003509651
-
-
2nd edn (Englewood Cliffs, NJ: Prentice Hall)
-
Sprague, Jr., P. H., and Watson, H. J., 1989, Decision support systems: putting theory into practice, 2nd edn (Englewood Cliffs, NJ: Prentice Hall).
-
(1989)
Decision Support Systems: Putting Theory into Practice
-
-
Sprague, P.H.1
Watson, H.J.2
-
32
-
-
0026253908
-
Production scheduling algorithms for a semiconductor testing facility
-
Uzsoy, R., Martin-Vega, L. A., Lee, C. Y., and Leonard, P. A., 1991, Production scheduling algorithms for a semiconductor testing facility. IEEE Transactions on Semiconductor Manufacturing, 4, 270-280.
-
(1991)
IEEE Transactions on Semiconductor Manufacturing
, vol.4
, pp. 270-280
-
-
Uzsoy, R.1
Martin-Vega, L.A.2
Lee, C.Y.3
Leonard, P.A.4
-
33
-
-
0026841915
-
Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine
-
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., 1992, Scheduling semiconductor test operations: minimizing maximum lateness and number of tardy jobs on a single machine. Naval Research Logistics, 39, 369-388.
-
(1992)
Naval Research Logistics
, vol.39
, pp. 369-388
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
34
-
-
0017465264
-
Sequence dependent set-up times and job sequencing
-
White, C. H., and Wilson, R. C., 1977, Sequence dependent set-up times and job sequencing. International Journal of Production Research, 15, 191-202.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 191-202
-
-
White, C.H.1
Wilson, R.C.2
-
35
-
-
0345403299
-
The influence of set-up time on job shop performance
-
Wilbrecht, J. K., and Prescott, C. Y., 1969, The influence of set-up time on job shop performance. Management Science, 16, B274-B280.
-
(1969)
Management Science
, vol.16
, pp. B274-B280
-
-
Wilbrecht, J.K.1
Prescott, C.Y.2
-
37
-
-
0024731596
-
An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
-
Wu, S.-Y. D., and Wysk, R. A., 1989, An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27, 1603-1623.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1603-1623
-
-
Wu, S.-Y.D.1
Wysk, R.A.2
-
38
-
-
0024899145
-
Scheduling in a manufacturing shop with sequence-dependent setups
-
Zhou, C., and Egbelu, P. J., 1989, Scheduling in a manufacturing shop with sequence-dependent setups. Robotics and Computer-Integrated Manufacturing, 5, 73-81.
-
(1989)
Robotics and Computer-Integrated Manufacturing
, vol.5
, pp. 73-81
-
-
Zhou, C.1
Egbelu, P.J.2
|