메뉴 건너뛰기




Volumn 55, Issue 2, 1998, Pages 177-189

Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases

Author keywords

Conveyor systems; Generalized CSPS; Probabilistic arrival service times; Simulation optimization; Simultaneous design of cycle time and buffers

Indexed keywords

MARKOV PROCESSES; MATHEMATICAL MODELS; PROBABILITY; TIME AND MOTION STUDY;

EID: 0032119557     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(98)00058-9     Document Type: Article
Times cited : (15)

References (22)
  • 1
    • 0013156989 scopus 로고
    • A study of the dynamic characteristic of an assembly system
    • in Japanese
    • R. Muramatsu, H. Kasugai, M. Kuroda, A study of the dynamic characteristic of an assembly system, Industrial Engineering 5 (6) (1963) 539-548 (in Japanese).
    • (1963) Industrial Engineering , vol.5 , Issue.6 , pp. 539-548
    • Muramatsu, R.1    Kasugai, H.2    Kuroda, M.3
  • 3
    • 0018690914 scopus 로고
    • Conveyor theory: A survey
    • E.J. Muth, J.A. White, Conveyor theory: a survey, AIIE Transactions 11 (4) (1979) 270-277.
    • (1979) AIIE Transactions , vol.11 , Issue.4 , pp. 270-277
    • Muth, E.J.1    White, J.A.2
  • 5
    • 0009351328 scopus 로고
    • A discrete-time queueing analysis of conveyor-serviced production stations
    • C.S. Beightler, R.M. Crisp Jr., A discrete-time queueing analysis of conveyor-serviced production stations, Operations Research 16 (5) (1968) 986-1001.
    • (1968) Operations Research , vol.16 , Issue.5 , pp. 986-1001
    • Beightler, C.S.1    Crisp R.M., Jr.2
  • 7
    • 0017944424 scopus 로고
    • A queueing analysis of conveyor-serviced production station and the optimal range strategy
    • M. Matsui, T. Shingu, A queueing analysis of conveyor-serviced production station and the optimal range strategy, AIIE Transactions 10 (1) (1978) 89-99.
    • (1978) AIIE Transactions , vol.10 , Issue.1 , pp. 89-99
    • Matsui, M.1    Shingu, T.2
  • 8
    • 0006501488 scopus 로고
    • A comparative consideration of operating policies for conveyor-serviced production station
    • in Japanese
    • M. Matsui, T. Shingu, H. Makabe, A comparative consideration of operating policies for conveyor-serviced production station, Journal of Japan Industrial Management Association 31 (3) (1980) 342-348 (in Japanese).
    • (1980) Journal of Japan Industrial Management Association , vol.31 , Issue.3 , pp. 342-348
    • Matsui, M.1    Shingu, T.2    Makabe, H.3
  • 10
    • 0001884814 scopus 로고
    • A generalized model of conveyor-serviced production station (CSPS)
    • in Japanese
    • M. Matsui, A generalized model of conveyor-serviced production station (CSPS), Journal of Japan Industrial Management Association 44 (1) (1993) 25-32 (in Japanese).
    • (1993) Journal of Japan Industrial Management Association , vol.44 , Issue.1 , pp. 25-32
    • Matsui, M.1
  • 11
    • 0022060567 scopus 로고
    • The optimal look-ahead policy for admission to a single server system
    • W.M. Nawijn, The optimal look-ahead policy for admission to a single server system, Operations Research 33 (3) (1985) 626-643.
    • (1985) Operations Research , vol.33 , Issue.3 , pp. 626-643
    • Nawijn, W.M.1
  • 12
    • 0042455255 scopus 로고
    • Optimal buffer design of a generalized conveyor-serviced production station
    • in Japanese
    • T. Minematsu, M. Matsui, Optimal buffer design of a generalized conveyor-serviced production station, Journal Japan Industrial Management Association 45 (6) (1995) 546-554 (in Japanese).
    • (1995) Journal Japan Industrial Management Association , vol.45 , Issue.6 , pp. 546-554
    • Minematsu, T.1    Matsui, M.2
  • 13
    • 0042956279 scopus 로고
    • Optimal arrival schedule to a generalized conveyor-serviced production station
    • in Japanese
    • K. Itai, M. Matsui, Optimal arrival schedule to a generalized conveyor-serviced production station, Journal of Japan Industrial Management Association 46 (3) (1995) 194-203 (in Japanese).
    • (1995) Journal of Japan Industrial Management Association , vol.46 , Issue.3 , pp. 194-203
    • Itai, K.1    Matsui, M.2
  • 15
    • 0042455252 scopus 로고
    • An analysis of conveyor-serviced production station by queueing theory
    • in Japanese
    • M. Matsui, T. Shingu, H. Makabe, An analysis of conveyor-serviced production station by queueing theory, Journal of Japan Industrial Management Association 28 (4) (1978) 375-386 (in Japanese).
    • (1978) Journal of Japan Industrial Management Association , vol.28 , Issue.4 , pp. 375-386
    • Matsui, M.1    Shingu, T.2    Makabe, H.3
  • 20
    • 0042956278 scopus 로고
    • Optimization of the nonlinear programming problems using penalty functions and complex method
    • M.M. Abdul, T. Sunaga, E. Kondo, Optimization of the nonlinear programming problems using penalty functions and complex method, Journal of Operations Research Society of Japan 30 (4) (1987).
    • (1987) Journal of Operations Research Society of Japan , vol.30 , Issue.4
    • Abdul, M.M.1    Sunaga, T.2    Kondo, E.3
  • 21
    • 0002606725 scopus 로고
    • A new method of constrained optimization and a comparison with other methods
    • M.J. Box, A new method of constrained optimization and a comparison with other methods, The Computer Journal 8 (1) (1965) 42-52.
    • (1965) The Computer Journal , vol.8 , Issue.1 , pp. 42-52
    • Box, M.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.