Volumn 25, Issue 10, 1998, Pages 771-789

Nuclear fuel cycle cost analysis using a probabilistic simulation technique

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COST ACCOUNTING; MONTE CARLO METHODS; PROBABILITY; SENSITIVITY ANALYSIS; URANIUM;

EID: 0032095039     PISSN: 03064549     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0306-4549(97)00123-0     Document Type: Article
Times cited : (7)

References (15)
  • 3
    • 0020452810 scopus 로고
    • An approach to risk and uncertainty in benefit-cost analysis of water resources projects
    • A. Goicoechea, M.R. Krouse and L.G. Antle, (1982) An Approach to Risk and Uncertainty in Benefit-Cost Analysis of Water Resources Projects, Water Resources Research Vol. 18, No 4, Page 791-799
    • (1982) Water Resources Research , vol.18 , Issue.4 , pp. 791-799
    • Goicoechea, A.1    Krouse, M.R.2    Antle, L.G.3
  • 4
    • 0022266776 scopus 로고
    • An approximate method for the analysis of uncertainty in benefit-cost ratios
    • G.C. Dandy, (1985) An Approximate Method for the Analysis of Uncertainty in Benefit-Cost Ratios, Water Resources Research, Vol. 21, No. 3, pages 267-271
    • (1985) Water Resources Research , vol.21 , Issue.3 , pp. 267-271
    • Dandy, G.C.1
  • 5
    • 0019146715 scopus 로고
    • Allowing for uncertainties in the expected waste management costs
    • R. Lehtinen, P. Silvennonen and J. Vira, (1980) Allowing for Uncertainties in the Expected Waste Management Costs, Radioactive Waste Management Vol. 1(1) page 43-55
    • (1980) Radioactive Waste Management , vol.1 , Issue.1 , pp. 43-55
    • Lehtinen, R.1    Silvennonen, P.2    Vira, J.3
  • 6
    • 0042401924 scopus 로고
    • Uncertainty assessment in life cycle cost analysis
    • CERL-SR-P-85/12, Directorate of Engineering and Construction, Office of the Chief of Engineers, Washing D.C.
    • A.k. Mallik, (1985) Uncertainty Assessment in Life Cycle Cost Analysis, U.S. Army Corps of Engineers Construction Engineering Research Laboratory Special Report, CERL-SR-P-85/12, Directorate of Engineering and Construction, Office of the Chief of Engineers, Washing D.C.
    • (1985) U.S. Army Corps of Engineers Construction Engineering Research Laboratory Special Report
    • Mallik, A.K.1
  • 7
    • 0022906768 scopus 로고
    • Stochastic cost estimating in repository life-cycle cost analysis
    • June 22-25
    • S. Tzemos and D. Dippold, (1986) Stochastic Cost Estimating in repository Life-Cycle Cost Analysis, Nuclear Materials Management, June 22-25, page 279-290
    • (1986) Nuclear Materials Management , pp. 279-290
    • Tzemos, S.1    Dippold, D.2
  • 8
    • 0026822970 scopus 로고
    • Probability distribution for benefit/cost ratio and net benefit
    • Y.K. Tung, (1992) Probability Distribution for Benefit/Cost Ratio and Net Benefit, Journal of Water Resources Planing and Management, Vol. 118(2), page 133-150
    • (1992) Journal of Water Resources Planing and Management , vol.118 , Issue.2 , pp. 133-150
    • Tung, Y.K.1
  • 9
    • 0344433657 scopus 로고    scopus 로고
    • A probability approach to cost and duration uncertainties in environmental decisions
    • 1996 August 18-23, Seattle
    • D.M. Boak and L. Painton, (1996)A Probability Approach to Cost and Duration Uncertainties in Environmental Decisions, SPECTRUM '96, 1996 August 18-23, Seattle, page700-708
    • (1996) Spectrum '96 , pp. 700-708
    • Boak, D.M.1    Painton, L.2
  • 13
    • 0018468345 scopus 로고
    • A comparison of three methods for selecting values of input variable in the analysis of output from a computer code
    • M.D. McKay , W.J. Conover and D.A. Dahlgren, (1979) A Comparison of Three Methods for Selecting Values of Input Variable in the Analysis of Output from a Computer Code, Technometrics, 21, page 239-245
    • (1979) Technometrics , vol.21 , pp. 239-245
    • McKay, M.D.1    Conover, W.J.2    Dahlgren, D.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.