|
Volumn 10, Issue 2, 1998, Pages 36-49
|
High-pressure, high-temperature well construction
a a a a a a a
a
NONE
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPUTER SIMULATION;
CONSTRUCTION;
DRILLING FLUIDS;
HIGH PRESSURE EFFECTS;
HIGH TEMPERATURE EFFECTS;
OIL WELL CEMENTING;
OIL WELL COMPLETION;
OIL WELL DRILLING;
PHYSICAL PROPERTIES;
PRESSURE CONTROL;
RISK ASSESSMENT;
VISCOSITY OF LIQUIDS;
HIGH PRESSURE WELLS;
HIGH TEMPERATURE WELLS;
OIL WELLS;
|
EID: 0032083582
PISSN: 09231730
EISSN: None
Source Type: Journal
DOI: None Document Type: Article |
Times cited : (21)
|
References (9)
|