-
1
-
-
0021494719
-
Aggregation and disaggregation in hierarchical production planning
-
Axsater, S., and Jonsson, H., 1984, Aggregation and disaggregation in hierarchical production planning. European Journal of Operational Research, 17, 338-350.
-
(1984)
European Journal of Operational Research
, vol.17
, pp. 338-350
-
-
Axsater, S.1
Jonsson, H.2
-
2
-
-
0019590377
-
Hierarchical production planning: A single stage system
-
Bitran, G. R., Haas, E. A., and Hax, A. C., 1981, Hierarchical production planning: a single stage system. Operations Research, 29, 717-743.
-
(1981)
Operations Research
, vol.29
, pp. 717-743
-
-
Bitran, G.R.1
Haas, E.A.2
Hax, A.C.3
-
3
-
-
84925931867
-
Disaggregation and resource allocation using convex knapsack problems with bounded variables
-
Bitran, G. R., and Hax, A. C., 1981, Disaggregation and resource allocation using convex knapsack problems with bounded variables. Management Science, 27, 431-441.
-
(1981)
Management Science
, vol.27
, pp. 431-441
-
-
Bitran, G.R.1
Hax, A.C.2
-
4
-
-
0000143979
-
Hierarchical production planning
-
S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds), (Amsterdam: North-Holland
-
Bitran, G. R., and Tirupati, D., 1993, Hierarchical production planning. In Logistics of Production and Inventory, S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds), (Amsterdam: North-Holland).
-
(1993)
Logistics of Production and Inventory
-
-
Bitran, G.R.1
Tirupati, D.2
-
5
-
-
84985824397
-
A hierarchical production planning and scheduling model
-
Bowers, M. R., and Jarvis, J. P., 1992. A hierarchical production planning and scheduling model. Decision Sciences, 23, 144-159.
-
(1992)
Decision Sciences
, vol.23
, pp. 144-159
-
-
Bowers, M.R.1
Jarvis, J.P.2
-
6
-
-
0001563910
-
Hierarchical production planning in a make-to-order company: A case study
-
Caravilla, M. A., and de Sousa, J. P., 1995, Hierarchical production planning in a make-to-order company: a case study. European Journal of Operational Research, 86, 43-56.
-
(1995)
European Journal of Operational Research
, vol.86
, pp. 43-56
-
-
Caravilla, M.A.1
De Sousa, J.P.2
-
7
-
-
0028424147
-
Dynamic production scheduling for a process industry
-
De Matta, R., and Guignard, M., 1994, Dynamic production scheduling for a process industry. Operations Research, 42, 492-503.
-
(1994)
Operations Research
, vol.42
, pp. 492-503
-
-
De Matta, R.1
Guignard, M.2
-
8
-
-
0001626728
-
Batching to minimize flow times on parallel heterogeneous machines
-
Dobson, G., Karmarkar, U., and Rummel, J. L., 1989, Batching to minimize flow times on parallel heterogeneous machines, Management Sciences, 35, 607-613.
-
(1989)
Management Sciences
, vol.35
, pp. 607-613
-
-
Dobson, G.1
Karmarkar, U.2
Rummel, J.L.3
-
9
-
-
0027642328
-
Some experiments with simulated annealing techniques for packing problems
-
Dowsland, K. A., 1993, Some experiments with simulated annealing techniques for packing problems. European Journal of Operational Research, 68, 389-399.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 389-399
-
-
Dowsland, K.A.1
-
10
-
-
0022708058
-
Consistency of the disaggegation process in hierarchical planning
-
Erschler, J., Fontan, G., and Merce, C., 1986, Consistency of the disaggegation process in hierarchical planning. Operations Research, 34, 464-469.
-
(1986)
Operations Research
, vol.34
, pp. 464-469
-
-
Erschler, J.1
Fontan, G.2
Merce, C.3
-
11
-
-
0027005303
-
A genetic algorithm for bin packing and line balancing
-
France
-
Falkenauer, E., and Delchambre, A., 1992, A genetic algorithm for bin packing and line balancing. Proceedings of the 1992 IEEE International Conference on Robotics and Automation, France, pp. 1186-1192.
-
(1992)
Proceedings of the 1992 IEEE International Conference on Robotics and Automation
, pp. 1186-1192
-
-
Falkenauer, E.1
Delchambre, A.2
-
12
-
-
0043219140
-
-
Technical report no. 120, Operations Research Center, MIT, USA
-
Gabbay, H., 1975, A hierarchical approach to production planning. Technical report no. 120, Operations Research Center, MIT, USA.
-
(1975)
A Hierarchical Approach to Production Planning.
-
-
Gabbay, H.1
-
13
-
-
0018996720
-
Design and implementation of a planning system in a rolling mill: A case study
-
Gelders, L. F., and Steelendt, F. V., 1980, Design and implementation of a planning system in a rolling mill: a case study. IIE Transactions, 22, 54-58.
-
(1980)
IIE Transactions
, vol.22
, pp. 54-58
-
-
Gelders, L.F.1
Steelendt, F.V.2
-
16
-
-
0042137803
-
Bin-packing problems in one dimension: Heuristic solutions and confidence intervals
-
Hall, N. G., Ghosh, S., Kankey, R., Narasinhan, S., and Rhee, W., 1988, Bin-packing problems in one dimension: heuristic solutions and confidence intervals. Computers and Operations Research, 15, 1711-177.
-
(1988)
Computers and Operations Research
, vol.15
, pp. 1711-2177
-
-
Hall, N.G.1
Ghosh, S.2
Kankey, R.3
Narasinhan, S.4
Rhee, W.5
-
18
-
-
0002957476
-
Hierarchical integration of production planning and scheduling
-
M. Geisler (ed.) (New York: Elsevier
-
Hax, A. C., and Meal, H. C., 1975, Hierarchical integration of production planning and scheduling. In TIMS Studies in Management Science, vol. 1, Logistics, M. Geisler (ed.) (New York: Elsevier).
-
(1975)
TIMS Studies in Management Science
, vol.1
-
-
Hax, A.C.1
Meal, H.C.2
-
20
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, A., Gelatt, Jr., C. D., and Vechi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, A.1
Gelatt, C.D.2
Vechi, M.P.3
-
21
-
-
0026417177
-
On the computational complexity of the (Maximum) class scheduling
-
Kolen, A. W. J., and Kroon, L. G., 1991, On the computational complexity of the (maximum) class scheduling. European Journal of Operational Research, 54, 23-38.
-
(1991)
European Journal of Operational Research
, vol.54
, pp. 23-38
-
-
Kolen, A.W.J.1
Kroon, L.G.2
-
22
-
-
26444588112
-
-
Working paper, Centre for Mathematics and Computer Science, Amsterdam
-
Kolen, A. W. J., Lenstra, J. K., and Papadimitriou, C. H., 1986, Interval scheduling problems. Working paper, Centre for Mathematics and Computer Science, Amsterdam.
-
(1986)
Interval Scheduling Problems.
-
-
Kolen, A.W.J.1
Lenstra, J.K.2
Papadimitriou, C.H.3
-
23
-
-
0022101534
-
A hierarchical production planning system
-
Liberatore, J. M., and Miller, T., 1985, A hierarchical production planning system. Interfaces, 15, 1-11.
-
(1985)
Interfaces
, vol.15
, pp. 1-11
-
-
Liberatore, J.M.1
Miller, T.2
-
24
-
-
0024640574
-
Hierarchical production planning for a modern steel manufacturing system
-
Lin, C. W., and Moodie, C. L., 1989, Hierarchical production planning for a modern steel manufacturing system. International Journal of Production Research, 27 (4), 613-628.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 613-628
-
-
Lin, C.W.1
Moodie, C.L.2
-
25
-
-
0019038129
-
Computerized hierarchical production control in steel manufacture
-
Mackulak, G. T., Moodie, C. L., and Williams, T. J., 1980, Computerized hierarchical production control in steel manufacture. International Journal of Production Research, 18, 455-465.
-
(1980)
International Journal of Production Research
, vol.18
, pp. 455-465
-
-
Mackulak, G.T.1
Moodie, C.L.2
Williams, T.J.3
-
26
-
-
0022248476
-
A linear time bin-packing algorithm
-
Martel, C. U., 1985, A linear time bin-packing algorithm. Operations Research Letters, 4, 189-192.
-
(1985)
Operations Research Letters
, vol.4
, pp. 189-192
-
-
Martel, C.U.1
-
27
-
-
0030780638
-
A modified hierarchical production planning system integrated with MRP a case study
-
Ozdamar, L., Yetis, N., and Atli, A. O., 1997, A modified hierarchical production planning system integrated with MRP a case study. Production Planning and Control, 8, 72-87.
-
(1997)
Production Planning and Control
, vol.8
, pp. 72-87
-
-
Ozdamar, L.1
Yetis, N.2
Atli, A.O.3
-
28
-
-
0030243954
-
Heuristic family disaggregation techniques for hierarchical production planning systems
-
O zdamar, L., Atli, O., and Bozyel, M. A., 1997, Heuristic family disaggregation techniques for hierarchical production planning systems. International Journal of Production Research, 34, 2613-2628.
-
(1997)
International Journal of Production Research
, vol.34
, pp. 2613-2628
-
-
Ozdamar, L.1
Atli, O.2
Bozyel, M.A.3
-
29
-
-
0003039463
-
Hierarchical structures in organizations: A conceptual framework
-
Schneeweib, C., 1995, Hierarchical structures in organizations: a conceptual framework. European Journal of Operational Research, 86, 4-31.
-
(1995)
European Journal of Operational Research
, vol.86
, pp. 4-31
-
-
Schneeweib, C.1
-
30
-
-
0025699540
-
Drum-buffer-rope shop floor control
-
Schragenheim, E., and Ronen, B., 1990, Drum-buffer-rope shop floor control. Production and Inventory Management Journal, Q3, 18-22.
-
(1990)
Production and Inventory Management Journal
, vol.Q3
, pp. 18-22
-
-
Schragenheim, E.1
Ronen, B.2
-
31
-
-
0028445097
-
New worst-case results for the bin-packing problem
-
Simchi-Levi, D., 1994, New worst-case results for the bin-packing problem. Naval Research Logistics, 41, 579-585.
-
(1994)
Naval Research Logistics
, vol.41
, pp. 579-585
-
-
Simchi-Levi, D.1
-
32
-
-
38149144750
-
A hierarchical production planning system in the motor industry
-
Tsubone, H., and Sugawara, M., 1987, A hierarchical production planning system in the motor industry. OMEGA, 15, 113-120.
-
(1987)
OMEGA
, vol.15
, pp. 113-120
-
-
Tsubone, H.1
Sugawara, M.2
|