메뉴 건너뛰기




Volumn 36, Issue 5, 1998, Pages 1305-1324

Simultaneous lot sizing and loading of product families on parallel facilities of different classes

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; DECISION MAKING; HEURISTIC METHODS; HIERARCHICAL SYSTEMS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING; PROCESS CONTROL; SCHEDULING; SIMULATED ANNEALING; STATISTICAL METHODS; STRATEGIC PLANNING;

EID: 0032071782     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498193336     Document Type: Article
Times cited : (13)

References (33)
  • 1
    • 0021494719 scopus 로고
    • Aggregation and disaggregation in hierarchical production planning
    • Axsater, S., and Jonsson, H., 1984, Aggregation and disaggregation in hierarchical production planning. European Journal of Operational Research, 17, 338-350.
    • (1984) European Journal of Operational Research , vol.17 , pp. 338-350
    • Axsater, S.1    Jonsson, H.2
  • 2
    • 0019590377 scopus 로고
    • Hierarchical production planning: A single stage system
    • Bitran, G. R., Haas, E. A., and Hax, A. C., 1981, Hierarchical production planning: a single stage system. Operations Research, 29, 717-743.
    • (1981) Operations Research , vol.29 , pp. 717-743
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 3
    • 84925931867 scopus 로고
    • Disaggregation and resource allocation using convex knapsack problems with bounded variables
    • Bitran, G. R., and Hax, A. C., 1981, Disaggregation and resource allocation using convex knapsack problems with bounded variables. Management Science, 27, 431-441.
    • (1981) Management Science , vol.27 , pp. 431-441
    • Bitran, G.R.1    Hax, A.C.2
  • 4
    • 0000143979 scopus 로고
    • Hierarchical production planning
    • S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds), (Amsterdam: North-Holland
    • Bitran, G. R., and Tirupati, D., 1993, Hierarchical production planning. In Logistics of Production and Inventory, S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds), (Amsterdam: North-Holland).
    • (1993) Logistics of Production and Inventory
    • Bitran, G.R.1    Tirupati, D.2
  • 5
    • 84985824397 scopus 로고
    • A hierarchical production planning and scheduling model
    • Bowers, M. R., and Jarvis, J. P., 1992. A hierarchical production planning and scheduling model. Decision Sciences, 23, 144-159.
    • (1992) Decision Sciences , vol.23 , pp. 144-159
    • Bowers, M.R.1    Jarvis, J.P.2
  • 6
    • 0001563910 scopus 로고
    • Hierarchical production planning in a make-to-order company: A case study
    • Caravilla, M. A., and de Sousa, J. P., 1995, Hierarchical production planning in a make-to-order company: a case study. European Journal of Operational Research, 86, 43-56.
    • (1995) European Journal of Operational Research , vol.86 , pp. 43-56
    • Caravilla, M.A.1    De Sousa, J.P.2
  • 7
    • 0028424147 scopus 로고
    • Dynamic production scheduling for a process industry
    • De Matta, R., and Guignard, M., 1994, Dynamic production scheduling for a process industry. Operations Research, 42, 492-503.
    • (1994) Operations Research , vol.42 , pp. 492-503
    • De Matta, R.1    Guignard, M.2
  • 8
    • 0001626728 scopus 로고
    • Batching to minimize flow times on parallel heterogeneous machines
    • Dobson, G., Karmarkar, U., and Rummel, J. L., 1989, Batching to minimize flow times on parallel heterogeneous machines, Management Sciences, 35, 607-613.
    • (1989) Management Sciences , vol.35 , pp. 607-613
    • Dobson, G.1    Karmarkar, U.2    Rummel, J.L.3
  • 9
    • 0027642328 scopus 로고
    • Some experiments with simulated annealing techniques for packing problems
    • Dowsland, K. A., 1993, Some experiments with simulated annealing techniques for packing problems. European Journal of Operational Research, 68, 389-399.
    • (1993) European Journal of Operational Research , vol.68 , pp. 389-399
    • Dowsland, K.A.1
  • 10
    • 0022708058 scopus 로고
    • Consistency of the disaggegation process in hierarchical planning
    • Erschler, J., Fontan, G., and Merce, C., 1986, Consistency of the disaggegation process in hierarchical planning. Operations Research, 34, 464-469.
    • (1986) Operations Research , vol.34 , pp. 464-469
    • Erschler, J.1    Fontan, G.2    Merce, C.3
  • 13
    • 0018996720 scopus 로고
    • Design and implementation of a planning system in a rolling mill: A case study
    • Gelders, L. F., and Steelendt, F. V., 1980, Design and implementation of a planning system in a rolling mill: a case study. IIE Transactions, 22, 54-58.
    • (1980) IIE Transactions , vol.22 , pp. 54-58
    • Gelders, L.F.1    Steelendt, F.V.2
  • 16
  • 18
    • 0002957476 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • M. Geisler (ed.) (New York: Elsevier
    • Hax, A. C., and Meal, H. C., 1975, Hierarchical integration of production planning and scheduling. In TIMS Studies in Management Science, vol. 1, Logistics, M. Geisler (ed.) (New York: Elsevier).
    • (1975) TIMS Studies in Management Science , vol.1
    • Hax, A.C.1    Meal, H.C.2
  • 20
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, A., Gelatt, Jr., C. D., and Vechi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, A.1    Gelatt, C.D.2    Vechi, M.P.3
  • 21
    • 0026417177 scopus 로고
    • On the computational complexity of the (Maximum) class scheduling
    • Kolen, A. W. J., and Kroon, L. G., 1991, On the computational complexity of the (maximum) class scheduling. European Journal of Operational Research, 54, 23-38.
    • (1991) European Journal of Operational Research , vol.54 , pp. 23-38
    • Kolen, A.W.J.1    Kroon, L.G.2
  • 23
    • 0022101534 scopus 로고
    • A hierarchical production planning system
    • Liberatore, J. M., and Miller, T., 1985, A hierarchical production planning system. Interfaces, 15, 1-11.
    • (1985) Interfaces , vol.15 , pp. 1-11
    • Liberatore, J.M.1    Miller, T.2
  • 24
    • 0024640574 scopus 로고
    • Hierarchical production planning for a modern steel manufacturing system
    • Lin, C. W., and Moodie, C. L., 1989, Hierarchical production planning for a modern steel manufacturing system. International Journal of Production Research, 27 (4), 613-628.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 613-628
    • Lin, C.W.1    Moodie, C.L.2
  • 26
    • 0022248476 scopus 로고
    • A linear time bin-packing algorithm
    • Martel, C. U., 1985, A linear time bin-packing algorithm. Operations Research Letters, 4, 189-192.
    • (1985) Operations Research Letters , vol.4 , pp. 189-192
    • Martel, C.U.1
  • 27
    • 0030780638 scopus 로고    scopus 로고
    • A modified hierarchical production planning system integrated with MRP a case study
    • Ozdamar, L., Yetis, N., and Atli, A. O., 1997, A modified hierarchical production planning system integrated with MRP a case study. Production Planning and Control, 8, 72-87.
    • (1997) Production Planning and Control , vol.8 , pp. 72-87
    • Ozdamar, L.1    Yetis, N.2    Atli, A.O.3
  • 28
    • 0030243954 scopus 로고    scopus 로고
    • Heuristic family disaggregation techniques for hierarchical production planning systems
    • O zdamar, L., Atli, O., and Bozyel, M. A., 1997, Heuristic family disaggregation techniques for hierarchical production planning systems. International Journal of Production Research, 34, 2613-2628.
    • (1997) International Journal of Production Research , vol.34 , pp. 2613-2628
    • Ozdamar, L.1    Atli, O.2    Bozyel, M.A.3
  • 29
    • 0003039463 scopus 로고
    • Hierarchical structures in organizations: A conceptual framework
    • Schneeweib, C., 1995, Hierarchical structures in organizations: a conceptual framework. European Journal of Operational Research, 86, 4-31.
    • (1995) European Journal of Operational Research , vol.86 , pp. 4-31
    • Schneeweib, C.1
  • 31
    • 0028445097 scopus 로고
    • New worst-case results for the bin-packing problem
    • Simchi-Levi, D., 1994, New worst-case results for the bin-packing problem. Naval Research Logistics, 41, 579-585.
    • (1994) Naval Research Logistics , vol.41 , pp. 579-585
    • Simchi-Levi, D.1
  • 32
    • 38149144750 scopus 로고
    • A hierarchical production planning system in the motor industry
    • Tsubone, H., and Sugawara, M., 1987, A hierarchical production planning system in the motor industry. OMEGA, 15, 113-120.
    • (1987) OMEGA , vol.15 , pp. 113-120
    • Tsubone, H.1    Sugawara, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.