메뉴 건너뛰기




Volumn 22, Issue 4-5, 1998, Pages 129-135

A simple approach to the product rate variation problem via axiomatics

Author keywords

Apportionment; Assembly systems; Just in time; Parametric methods; Production; Scheduling

Indexed keywords

COMPUTATIONAL METHODS; PROBLEM SOLVING; PROCESS CONTROL; SCHEDULING;

EID: 0032058055     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0167-6377(98)00008-x     Document Type: Article
Times cited : (19)

References (13)
  • 1
    • 0042768448 scopus 로고
    • The problem with apportionment
    • M. Balinski, The problem with apportionment, J. Oper. Res. Soc. Japan 36 (1993) 134-148.
    • (1993) J. Oper. Res. Soc. Japan , vol.36 , pp. 134-148
    • Balinski, M.1
  • 2
    • 0012988534 scopus 로고    scopus 로고
    • Rounding proportions: Methods of rounding
    • M.L. Balinski, S.T. Rachev, Rounding proportions: methods of rounding, Math. Sci. 22 (1997) 1-26.
    • (1997) Math. Sci. , vol.22 , pp. 1-26
    • Balinski, M.L.1    Rachev, S.T.2
  • 3
    • 22244478275 scopus 로고    scopus 로고
    • Parametric methods of apportionment, rounding, and production
    • Cahier du Laboratoire d'Économétrie No. 471, October, To appear
    • M. Balinski, V. Ramírez, Parametric methods of apportionment, rounding, and production, Cahier du Laboratoire d'Économétrie No. 471, October, 1997. To appear in Math. Soc. Sci.
    • (1997) Math. Soc. Sci.
    • Balinski, M.1    Ramírez, V.2
  • 5
    • 0042849964 scopus 로고
    • On Huntington methods of apportionment
    • M.L. Balinski, H.P. Young, On Huntington methods of apportionment, SIAM J. Appl. Math. 33 (1977) 607-618.
    • (1977) SIAM J. Appl. Math. , vol.33 , pp. 607-618
    • Balinski, M.L.1    Young, H.P.2
  • 8
    • 0030290247 scopus 로고    scopus 로고
    • A note on the relation between the product rate variation (PRV) problem and the apportionment problem
    • J. Bautista, R. Companys and A. Corominas, A note on the relation between the product rate variation (PRV) problem and the apportionment problem, J. Oper. Res. Soc. 47 (1996) 1410-1414.
    • (1996) J. Oper. Res. Soc. , vol.47 , pp. 1410-1414
    • Bautista, J.1    Companys, R.2    Corominas, A.3
  • 9
    • 0027595182 scopus 로고
    • Minimizing variation or production rates in just-in-time systems: A survey
    • W. Kubiak, Minimizing variation or production rates in just-in-time systems: a survey, European J. Oper. Res. 66 (1993) 259-271.
    • (1993) European J. Oper. Res. , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 10
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • J. Miltenburg, Level schedules for mixed-model assembly lines in just-in-time production systems, Management Sci. 35 (1989) 192-207.
    • (1989) Management Sci. , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 11
    • 0042045155 scopus 로고
    • On a parametric divisor method for the apportionment problem
    • T. Oyama, On a parametric divisor method for the apportionment problem, J. Oper. Res. Soc. Japan 34 (1991) 187-221.
    • (1991) J. Oper. Res. Soc. Japan , vol.34 , pp. 187-221
    • Oyama, T.1
  • 12
    • 0027614669 scopus 로고
    • Level schedules for mixed-model, jsut-in-time processes
    • G. Steiner, S. Yeomans, Level schedules for mixed-model, jsut-in-time processes, Management Sci. 39 (1993) 728-735.
    • (1993) Management Sci. , vol.39 , pp. 728-735
    • Steiner, G.1    Yeomans, S.2
  • 13
    • 0005384259 scopus 로고
    • A class of new methods for congressional apportionment
    • J.W. Still, A class of new methods for congressional apportionment, SIAM J. Appl. Math. 37 (1979) 401-418.
    • (1979) SIAM J. Appl. Math. , vol.37 , pp. 401-418
    • Still, J.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.