-
1
-
-
85034470185
-
-
AREA, Washington, D.C.
-
American Railway Engineering Association (AREA). (1996). Manual for railway engineering. Vol. 1, AREA, Washington, D.C.
-
(1996)
Manual for Railway Engineering
, vol.1
-
-
-
2
-
-
0003946536
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Cedergren, H. (1989). Seepage, drainage, and flow nets, 3rd Ed., John Wiley & Sons, Inc., New York, N.Y.
-
(1989)
Seepage, Drainage, and Flow Nets, 3rd Ed.
-
-
Cedergren, H.1
-
3
-
-
84889227873
-
Hot mix asphalt underlayment test on Burlington Northern Railroad
-
Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
Chrismer, S. M., Terrill, V., and Read, D. (1996). "Hot mix asphalt underlayment test on Burlington Northern Railroad." Rep. No. R-892, Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
(1996)
Rep. No. R-892
-
-
Chrismer, S.M.1
Terrill, V.2
Read, D.3
-
4
-
-
0343367927
-
-
PhD dissertation, Department of Civil Engineering, University of Massachusetts, Amherst, Mass.
-
Ebersohn, W. (1995). "Substructure influence on track maintenance requirements," PhD dissertation, Department of Civil Engineering, University of Massachusetts, Amherst, Mass.
-
(1995)
Substructure Influence on Track Maintenance Requirements
-
-
Ebersohn, W.1
-
5
-
-
0141668645
-
-
PhD dissertation, Department of Civil Engineering, University of Massachusetts, Amherst, Mass.
-
Li, D. (1994). "Railway track granular layer thickness design based on subgrade performance under repeated loading," PhD dissertation, Department of Civil Engineering, University of Massachusetts, Amherst, Mass.
-
(1994)
Railway Track Granular Layer Thickness Design Based on Subgrade Performance under Repeated Loading
-
-
Li, D.1
-
6
-
-
84889184253
-
Investigation of BN track subgrade problems near Alps, NM
-
Amherst, Mass.
-
Li, D., and Selig, E. T. (1994a). "Investigation of BN track subgrade problems near Alps, NM." Internal Rep. to the Assoc. Am. Railroads and the Burlington Northern Railroad, Amherst, Mass.
-
(1994)
Internal Rep. to the Assoc. Am. Railroads and the Burlington Northern Railroad
-
-
Li, D.1
Selig, E.T.2
-
7
-
-
84889184253
-
Remediation of BN track subgrade problems near Alps, NM
-
Amherst, Mass.
-
Li, D., and Selig, E. T. (1994b). "Remediation of BN track subgrade problems near Alps, NM." Internal Rep. to the Assoc. of Am. Railroads and the Burlington Northern Railroad, Amherst, Mass.
-
(1994)
Internal Rep. to the Assoc. of Am. Railroads and the Burlington Northern Railroad
-
-
Li, D.1
Selig, E.T.2
-
8
-
-
84889185583
-
Investigation of AMTRAK track foundation problems in Edgewood and Aberdeen, MD
-
Amherst, Mass.
-
Li, D., and Selig, E. T. (1994c). "Investigation of AMTRAK track foundation problems in Edgewood and Aberdeen, MD." Internal Rep. to the Assoc. of Am. Railroads and Amtrak, Amherst, Mass.
-
(1994)
Internal Rep. to the Assoc. of Am. Railroads and Amtrak
-
-
Li, D.1
Selig, E.T.2
-
9
-
-
84889226154
-
Evaluation and remediation of potential railway subgrade problems under repeated heavy axle loads
-
Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
Li, D., and Selig, E. T. (1995). "Evaluation and remediation of potential railway subgrade problems under repeated heavy axle loads." Rep. No. R-884, Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
(1995)
Rep. No. R-884
-
-
Li, D.1
Selig, E.T.2
-
10
-
-
0030417922
-
Cumulative plastic deformation for fine-grained subgrade soils
-
ASCE
-
Li, D., and Selig, E. T. (1996). "Cumulative plastic deformation for fine-grained subgrade soils." J. Geotech. Engrg., ASCE, 122(12), 1006-1013.
-
(1996)
J. Geotech. Engrg.
, vol.122
, Issue.12
, pp. 1006-1013
-
-
Li, D.1
Selig, E.T.2
-
11
-
-
0032052054
-
Method for railroad track foundation design. I: Development
-
ASCE
-
Li, D., and Selig, E. T. (1998). "Method for railroad track foundation design. I: Development." J. Geotech. and Geoenvir. Engrg., ASCE, 124(4), 316-322.
-
(1998)
J. Geotech. and Geoenvir. Engrg.
, vol.124
, Issue.4
, pp. 316-322
-
-
Li, D.1
Selig, E.T.2
-
12
-
-
0004085768
-
Procedure for railway track granular layer thickness determination
-
Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
Li, D., Sussmann, T. R., and Selig, E. T. (1996). "Procedure for railway track granular layer thickness determination." Rep. No. R-898, Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
(1996)
Rep. No. R-898
-
-
Li, D.1
Sussmann, T.R.2
Selig, E.T.3
-
13
-
-
84889228365
-
Subballast considerations for heavy axle load trackage
-
Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
Read, D., and Li, D. (1995). "Subballast considerations for heavy axle load trackage." Tech. Dig. Rep. No. 95-028, Assoc. of Am. Railroads, Transp. Technol. Ctr., Pueblo, Colo.
-
(1995)
Tech. Dig. Rep. No. 95-028
-
-
Read, D.1
Li, D.2
|