|
Volumn 77, Issue 2, 1998, Pages 70-73
|
Too-flexible factory
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
DECISION MAKING;
INFORMATION MANAGEMENT;
INVENTORY CONTROL;
PROBLEM SOLVING;
PROCESS CONTROL;
PRODUCTION CONTROL;
QUALITY ASSURANCE;
RESOURCE ALLOCATION;
SCADA SYSTEMS;
SCHEDULING;
STRATEGIC PLANNING;
VALUE ENGINEERING;
CELL BASED SCHEDULING;
SHOP FLOOR PRODUCTION PARAMETERS;
FLEXIBLE MANUFACTURING SYSTEMS;
|
EID: 0032048612
PISSN: 09569944
EISSN: None
Source Type: Journal
DOI: 10.1049/me:19980216 Document Type: Article |
Times cited : (1)
|
References (4)
|