메뉴 건너뛰기




Volumn 10, Issue 2, 1998, Pages 129-138

Cyclic scheduling of operations for a part type in an FMS handled by a single robot: A parametric critical-path approach

Author keywords

Cyclic scheduling; Parametric CPM PERT networks; Parametric critical paths

Indexed keywords

ALGORITHMS; CRITICAL PATH ANALYSIS; INTELLIGENT CONTROL; MATERIALS HANDLING EQUIPMENT; PERT; PROBLEM SOLVING; PRODUCTION ENGINEERING; ROBOT APPLICATIONS; SCHEDULING; PROCESS CONTROL; PRODUCTION CONTROL; ROBOTICS;

EID: 0032045058     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1008045414118     Document Type: Article
Times cited : (17)

References (26)
  • 2
    • 0022026963 scopus 로고
    • A linear-system-theoretic review of discrete-event processes and its use for performance evaluation in manufacturing
    • Cohen, G., Dubois, D., Quadrat, J.P., and Viot, M., "A Linear-System-Theoretic Review of Discrete-Event Processes and Its Use for Performance Evaluation in Manufacturing," IEEE Transactions on Automatic Control, Vol. AC-30, No. 3, pp. 210-220 (1985).
    • (1985) IEEE Transactions on Automatic Control , vol.AC-30 , Issue.3 , pp. 210-220
    • Cohen, G.1    Dubois, D.2    Quadrat, J.P.3    Viot, M.4
  • 3
    • 0012219716 scopus 로고
    • Scheduling of flexible flow shops - II
    • Laboratory for Information and Decision Systems, Massachusets Institute of Technology, Cambridge, MA
    • Hitz, K.L., "Scheduling of Flexible Flow Shops - II," Technical Report No. LDS-R-1049, Laboratory for Information and Decision Systems, Massachusets Institute of Technology, Cambridge, MA (1980).
    • (1980) Technical Report No. LDS-R-1049 , vol.LDS-R-1049
    • Hitz, K.L.1
  • 5
    • 0001391363 scopus 로고
    • A characterization of the minimum cycle mean in a digraph
    • Karp, Richard M., "A Characterization of the Minimum Cycle Mean in a Digraph," Discrete Mathematics, Vol. 23, pp. 309-311 (1978).
    • (1978) Discrete Mathematics , vol.23 , pp. 309-311
    • Karp, R.M.1
  • 6
    • 0004785206 scopus 로고
    • Parametric shortest path algorithms with an application to cycle staffing
    • Karp, Richard M. and Orlin, James B., "Parametric Shortest Path Algorithms with an Application to Cycle Staffing," Discrete Applied Mathematics, No. 3, pp. 37-45 (1981).
    • (1981) Discrete Applied Mathematics , Issue.3 , pp. 37-45
    • Karp, R.M.1    Orlin, J.B.2
  • 7
    • 2442517409 scopus 로고
    • An exact optimal cyclic scheduling algorithm for multioperator service of a production line
    • Kats, Vladimir B., "An Exact Optimal Cyclic Scheduling Algorithm for Multioperator Service of a Production Line," Automation and Remote Control, Vol. 43, No. 4, pp. 53-542 (1982).
    • (1982) Automation and Remote Control , vol.43 , Issue.4 , pp. 53-542
    • Kats, V.B.1
  • 8
    • 2442622441 scopus 로고
    • A polynomial parametric algorithm for a robotic scheduling problem
    • Department of Computer Systems, Holon Center for Technological Education, Holon, Israel (November)
    • Kats, Vladimir and Levner, Eugene, "A Polynomial Parametric Algorithm for a Robotic Scheduling Problem," Technical Report No. 95-11, Department of Computer Systems, Holon Center for Technological Education, Holon, Israel (November 1995).
    • (1995) Technical Report No. 95-11 , vol.95 , Issue.11
    • Kats, V.1    Levner, E.2
  • 11
    • 0027684058 scopus 로고
    • Determining the optimal starting times in a cyclic schedule with a given route
    • Lei, Lei, "Determining the Optimal Starting Times in a Cyclic Schedule with a Given Route," Computers and Operations Research, Vol. 20, No. 8, pp. 807-816 (1993).
    • (1993) Computers and Operations Research , vol.20 , Issue.8 , pp. 807-816
    • Lei, L.1
  • 12
    • 0038699095 scopus 로고
    • A proof: The cyclic hoist scheduling problem is NP-complete
    • Rutgers University
    • Lei, Lei and Wang, T.J., "A Proof: The Cyclic Hoist Scheduling Problem is NP-Complete," Working Paper WP 89-0016, Rutgers University (1989).
    • (1989) Working Paper , vol.WP 89-0016
    • Lei, L.1    Wang, T.J.2
  • 13
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • Lei, Lei and Wang, T.J., "Determining Optimal Cyclic Hoist Schedules in a Single-Hoist Electroplating Line," IIE Transactions, Vol. 26, No. 2, pp. 25-33 (1994).
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.J.2
  • 15
    • 0024667335 scopus 로고
    • The construction of cyclic schedules for fuzzy duration of operations
    • Levner, Eugene and Ptuskin, Alexander, "The Construction of Cyclic Schedules for Fuzzy Duration of Operations," Soviet Journal of Computer and Systems Science, No. 3, pp. 10-14 (1988).
    • (1988) Soviet Journal of Computer and Systems Science , Issue.3 , pp. 10-14
    • Levner, E.1    Ptuskin, A.2
  • 16
    • 0019665082 scopus 로고
    • Crane scheduling problems
    • Lieberman, R.W. and Turksen, I.B., "Crane Scheduling Problems, " AIIE Transactions, Vol. 13, No. 4, pp. 304-311 (1981).
    • (1981) AIIE Transactions , vol.13 , Issue.4 , pp. 304-311
    • Lieberman, R.W.1    Turksen, I.B.2
  • 18
    • 0000197379 scopus 로고
    • A crane scheduling problem in a computer-integrated manufacturing environment
    • Matsuo, H., Shang, J.S., and Sullivan, R.S., "A Crane Scheduling Problem in a Computer-Integrated Manufacturing Environment," Management Science, Vol. 37, No. 5, pp. 587-606 (1991).
    • (1991) Management Science , vol.37 , Issue.5 , pp. 587-606
    • Matsuo, H.1    Shang, J.S.2    Sullivan, R.S.3
  • 19
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling problem
    • Phillips, L.W. and Unger, P.S., "Mathematical Programming Solution of a Hoist Scheduling Problem," AIIE Transactions, No. 2, pp. 219-225 (1976).
    • (1976) AIIE Transactions , Issue.2 , pp. 219-225
    • Phillips, L.W.1    Unger, P.S.2
  • 22
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • Serafini, P. and Ukovich, W., "A Mathematical Model for Periodic Scheduling Problems," SIAM Journal of Discrete Mathematics, Vol. 2, No. 4, pp. 550-581 (1989).
    • (1989) SIAM Journal of Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 24
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • Shapiro, G.W. and Nuttle, H.W., "Hoist Scheduling for a PCB Electroplating Facility," IIE Transactions, Vol. 20, No. 2, pp. 157-167 (1988).
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.W.2
  • 25
    • 84877343203 scopus 로고
    • An algorithm for scheduling a chemical processing tank line
    • Song, W., Zabinsky, Zelda B., and Storch, Richard L., "An Algorithm for Scheduling a Chemical Processing Tank Line," Production Planning and Control, Vol. 4, No. 4, pp. 323-332 (1993).
    • (1993) Production Planning and Control , vol.4 , Issue.4 , pp. 323-332
    • Song, W.1    Zabinsky, Z.B.2    Storch, R.L.3
  • 26
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • March
    • Stecke, Kathryn E., "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, Vol. 29, No. 3, pp. 273-288 (March 1983).
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.