|
Volumn 22, Issue 2-3, 1998, Pages 63-68
|
Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps
a b c |
Author keywords
Convergence in probability; Parallel machines; Scheduling
|
Indexed keywords
ASYMPTOTIC STABILITY;
COMPUTATIONAL COMPLEXITY;
CONVERGENCE OF NUMERICAL METHODS;
HEURISTIC METHODS;
MATHEMATICAL MODELS;
PROBABILITY;
PROCESS CONTROL;
SCHEDULING;
ASYMPTOTIC OPTIMALITY;
PARALLEL MACHINES;
PRODUCTION CONTROL;
|
EID: 0032010271
PISSN: 01676377
EISSN: None
Source Type: Journal
DOI: 10.1016/s0167-6377(98)00007-8 Document Type: Article |
Times cited : (9)
|
References (7)
|