메뉴 건너뛰기




Volumn 9, Issue 1, 1998, Pages 57-72

A review of current research in manufacturing shop design integration

Author keywords

Facility layout; Integrated shop design; Material flow network design; Material handling systems; Transporter routing

Indexed keywords

MATERIALS HANDLING; PLANT MANAGEMENT; PRODUCTION CONTROL;

EID: 0032003983     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1008899325164     Document Type: Review
Times cited : (19)

References (110)
  • 3
    • 0021388884 scopus 로고
    • A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation techniques
    • Ang, C. L. and Willey, P. T. (1984) A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation techniques. International Journal of Production Research, 22(2), 193-233.
    • (1984) International Journal of Production Research , vol.22 , Issue.2 , pp. 193-233
    • Ang, C.L.1    Willey, P.T.2
  • 4
    • 0023305780 scopus 로고
    • Innovations in facilities design and material handling systems
    • Apple, J. M. and McGinnis, L. F. (1987) Innovations in facilities design and material handling systems. Industrial Engineering, 13(3), 33-38.
    • (1987) Industrial Engineering , vol.13 , Issue.3 , pp. 33-38
    • Apple, J.M.1    McGinnis, L.F.2
  • 5
    • 0000970291 scopus 로고
    • A heuristic algorithm and simulation approach to the relative location of facilities
    • Armour, G. C. and Buffa, E. S. (1963) A heuristic algorithm and simulation approach to the relative location of facilities. Management Science, 9(1), 294-309.
    • (1963) Management Science , vol.9 , Issue.1 , pp. 294-309
    • Armour, G.C.1    Buffa, E.S.2
  • 7
    • 0020765382 scopus 로고
    • Column generation-based heuristic algorithm for multi-item scheduling
    • Bahl, H. C. (1983) Column generation-based heuristic algorithm for multi-item scheduling. IIE Transactions, 15(2), 136-141.
    • (1983) IIE Transactions , vol.15 , Issue.2 , pp. 136-141
    • Bahl, H.C.1
  • 8
    • 0024735314 scopus 로고
    • A dual-ascent procedure for large-scale uncapacitated network design
    • Balakrishnan, A., Magnanti, T. L. and Wong, R. T. (1989) A dual-ascent procedure for large-scale uncapacitated network design. Operations Research, 37(5), 716-740.
    • (1989) Operations Research , vol.37 , Issue.5 , pp. 716-740
    • Balakrishnan, A.1    Magnanti, T.L.2    Wong, R.T.3
  • 10
    • 0000213445 scopus 로고
    • Facilities layout design optimization with single loop material flow path configuration
    • Banerjee, P. and Zhou, Y. (1995) Facilities layout design optimization with single loop material flow path configuration. International Journal of Production Research, 33(1), 183-203.
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 183-203
    • Banerjee, P.1    Zhou, Y.2
  • 12
    • 0024621009 scopus 로고
    • Decentralized control of a fixed route automated guided vehicle system
    • Bartholdi, J. J. III and Platzmann, L. K. (1988) Decentralized control of a fixed route automated guided vehicle system. IIE Transactions, 21(1), 76-81.
    • (1988) IIE Transactions , vol.21 , Issue.1 , pp. 76-81
    • Bartholdi III, J.J.1    Platzmann, L.K.2
  • 13
    • 2342459399 scopus 로고
    • An advanced AGV control system: An example of integrated design and control
    • White, J. A. and Pence, I. W. (eds), Springer-Verlag
    • Bohlander, R. A., Holcombe, W. D. and Larsen, J. W. (1990) An advanced AGV control system: an example of integrated design and control, in Progress in Material Handling and Logistics., vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 471-487.
    • (1990) Progress in Material Handling and Logistics , vol.2 , pp. 471-487
    • Bohlander, R.A.1    Holcombe, W.D.2    Larsen, J.W.3
  • 14
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
    • Bozer, Y. A. and Srinivasan, M. M. (1991) Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops. IIE Transactions, 23(1), 23-27.
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 23-27
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 15
    • 0026966782 scopus 로고
    • Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
    • Bozer, Y. A. and Srinivasan, M. M. (1992) Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems. European Journal of Operational Research, 63(2), 173-191.
    • (1992) European Journal of Operational Research , vol.63 , Issue.2 , pp. 173-191
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 16
    • 0028465790 scopus 로고
    • An improvement type layout algorithm for single and multiple-floor facilities
    • Bozer, Y. A., Meller, R. D. and Erlebacher, S. J. (1994) An improvement type layout algorithm for single and multiple-floor facilities. Management Science, 40(7), 918-932.
    • (1994) Management Science , vol.40 , Issue.7 , pp. 918-932
    • Bozer, Y.A.1    Meller, R.D.2    Erlebacher, S.J.3
  • 17
    • 0025699773 scopus 로고
    • Set partitioning and column generation heuristics for the capacitated dynamic lot sizing
    • Cattrysse, D., Maes, J. and Van Wassenhove, L. N. (1990) Set partitioning and column generation heuristics for the capacitated dynamic lot sizing. European Journal of Operational Research, 46(1), 38-47.
    • (1990) European Journal of Operational Research , vol.46 , Issue.1 , pp. 38-47
    • Cattrysse, D.1    Maes, J.2    Van Wassenhove, L.N.3
  • 19
    • 0028518280 scopus 로고
    • A column generation approach to job grouping for flexible manufacturing systems
    • Crama, Y. and Oerlemans, A. G. (1994) A column generation approach to job grouping for flexible manufacturing systems. European Journal of Operational Research, 78(1), 58-80.
    • (1994) European Journal of Operational Research , vol.78 , Issue.1 , pp. 58-80
    • Crama, Y.1    Oerlemans, A.G.2
  • 21
    • 0002814836 scopus 로고
    • A column generation approach to the urban transit crew scheduling problem
    • Desrochers, M. and Soumis, F. (1989) A column generation approach to the urban transit crew scheduling problem. Transportation Science, 23(1), 1-13.
    • (1989) Transportation Science , vol.23 , Issue.1 , pp. 1-13
    • Desrochers, M.1    Soumis, F.2
  • 22
    • 0002196657 scopus 로고
    • Time constrained routing and scheduling
    • Ball, M. E., Magnanti, T. L., Monma, C. and Nemhauser, G. L. (eds), volume on Networks. Konrad-Zuse-Zentrum für Informationstechnik, Berlin, Germany
    • Desrosiers, J., Dumas, Y., Solomon, M. M., and Soumis, F. (1994) Time constrained routing and scheduling, in Handbook in Operations Research and Management Science, Ball, M. E., Magnanti, T. L., Monma, C. and Nemhauser, G. L. (eds), volume on Networks. Konrad-Zuse-Zentrum für Informationstechnik, Berlin, Germany.
    • (1994) Handbook in Operations Research and Management Science
    • Desrosiers, J.1    Dumas, Y.2    Solomon, M.M.3    Soumis, F.4
  • 23
    • 0028452728 scopus 로고
    • A modeling approach to design of integrated facilities
    • Dowlatshahi, S. (1994) A modeling approach to design of integrated facilities. International Journal of Production Research, 32(6), 1313-1330.
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1313-1330
    • Dowlatshahi, S.1
  • 24
    • 0041535134 scopus 로고
    • Industrial Engineering Series, Marcel Dekker, New York-Basel
    • Eastman, R. M. (1987) Materials Handling, Industrial Engineering Series, vol. 15, Marcel Dekker, New York-Basel.
    • (1987) Materials Handling , vol.15
    • Eastman, R.M.1
  • 25
    • 0002894516 scopus 로고
    • The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
    • Egbelu, P. J. (1987) The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow, 4(1) 17-32.
    • (1987) Material Flow , vol.4 , Issue.1 , pp. 17-32
    • Egbelu, P.J.1
  • 26
    • 0041587607 scopus 로고
    • Technical Report 8204, Department of Industrial Engineering and Operations Research, Virginia Tech, Blacksburg, VA
    • Egbelu, P. J. and Tanchoco, J. M. A. (1982) AGV Sim User's manual. Technical Report 8204, Department of Industrial Engineering and Operations Research, Virginia Tech, Blacksburg, VA.
    • (1982) AGV Sim User's Manual
    • Egbelu, P.J.1    Tanchoco, J.M.A.2
  • 28
    • 0022785934 scopus 로고
    • Potentials for bidirectional guide path for automated guided vehicle based systems
    • Egbelu, P. J. and Tanchoco, J. M. A. (1986) Potentials for bidirectional guide path for automated guided vehicle based systems. International Journal of Production Research, 24(5), 1075-1097.
    • (1986) International Journal of Production Research , vol.24 , Issue.5 , pp. 1075-1097
    • Egbelu, P.J.1    Tanchoco, J.M.A.2
  • 29
    • 0005316688 scopus 로고
    • A modular algorithm for presimulation design of automatic guided vehicle systems
    • White, J. A. and Pence, I. W. (eds), Springer-Verlag
    • Evans, G. W., Wilhelm, M. R. and Usher, J. S. (1990) A modular algorithm for presimulation design of automatic guided vehicle systems, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 501-513.
    • (1990) Progress in Material Handling and Logistics , vol.2 , pp. 501-513
    • Evans, G.W.1    Wilhelm, M.R.2    Usher, J.S.3
  • 30
    • 0020909854 scopus 로고
    • Techniques for facilities layout: Deciding which pairs of activities should be adjacent
    • Foulds, L. R. (1983) Techniques for facilities layout: deciding which pairs of activities should be adjacent. Management Science, 29(12), 1414-1426.
    • (1983) Management Science , vol.29 , Issue.12 , pp. 1414-1426
    • Foulds, L.R.1
  • 34
    • 0025431933 scopus 로고
    • Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system
    • Goetz, W. J. Jr and Egbelu, P. J. (1990) Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system. International Journal of Production Research, 28(5), 927-941.
    • (1990) International Journal of Production Research , vol.28 , Issue.5 , pp. 927-941
    • Goetz Jr., W.J.1    Egbelu, P.J.2
  • 36
    • 0015317027 scopus 로고
    • A review of the placement and quadratic assignment problems
    • Hanan, M. and Kurtzberg, J. M. (1972) A review of the placement and quadratic assignment problems. SIAM Review, 14(2), 324-341.
    • (1972) SIAM Review , vol.14 , Issue.2 , pp. 324-341
    • Hanan, M.1    Kurtzberg, J.M.2
  • 37
    • 84885648809 scopus 로고
    • Machine layout problem in modern manufacturing facilities
    • Hassan, M. M. D. (1994) Machine layout problem in modern manufacturing facilities. International Journal of Production Research, 32(11), 2559-2584.
    • (1994) International Journal of Production Research , vol.32 , Issue.11 , pp. 2559-2584
    • Hassan, M.M.D.1
  • 38
    • 0026829547 scopus 로고
    • Recent models and techniques for solving the layout problem
    • Heragu, S. S. (1992) Recent models and techniques for solving the layout problem. European Journal of Operational Research, 57(2), 136-144.
    • (1992) European Journal of Operational Research , vol.57 , Issue.2 , pp. 136-144
    • Heragu, S.S.1
  • 39
    • 0023978605 scopus 로고
    • Machine layout problem in flexible manufacturing systems
    • Heragu, S. S. and Kusiak, A. (1988) Machine layout problem in flexible manufacturing systems. Operations Research, 36(2), 258-268.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 258-268
    • Heragu, S.S.1    Kusiak, A.2
  • 44
    • 1542346635 scopus 로고
    • Ph.D. Dissertation, Ph.D-07, Institute for Systems Research, University of Maryland, College Park, MD
    • Ioannou, G. (1995) Integrated manufacturing facility design. Ph.D. Dissertation, Ph.D-07, Institute for Systems Research, University of Maryland, College Park, MD.
    • (1995) Integrated Manufacturing Facility Design
    • Ioannou, G.1
  • 45
    • 2342651145 scopus 로고    scopus 로고
    • Integrating shop layout and material handling system design decisions, in Progress in Material handling decisions
    • Graves, R.J., McGinnis, L.F., Medeiros, D.J., Ward, R.E. and Wilhelm, M.R., (eds.) Braun-Brumfield, Inc., Ann Arbor, MI
    • Ioannou, G. (1996) Integrating shop layout and material handling system design decisions, in Progress in Material handling decisions, in Progress in Material Handling Research, Graves, R.J., McGinnis, L.F., Medeiros, D.J., Ward, R.E. and Wilhelm, M.R., (eds.) Braun-Brumfield, Inc., Ann Arbor, MI, pp. 227-244.
    • (1996) Progress in Material Handling Research , pp. 227-244
    • Ioannou, G.1
  • 46
    • 2342581843 scopus 로고
    • Technical report TR 95-106, Institute for Systems Research, University of Maryland, College Park, MD
    • Ioannou, G. and Minis, I. (1995) An integrated model for manufacturing shop design, Technical report TR 95-106, Institute for Systems Research, University of Maryland, College Park, MD.
    • (1995) An Integrated Model for Manufacturing Shop Design
    • Ioannou, G.1    Minis, I.2
  • 48
    • 0022851257 scopus 로고
    • A heuristic algorithm for the multi-vehicle advance-request dial-a-ride problem with time windows
    • Jaw, J., Odoni, A., Psaraftis, H. N. and Watson, N. (1986) A heuristic algorithm for the multi-vehicle advance-request dial-a-ride problem with time windows. Transportation Science, 20(5), 243-257.
    • (1986) Transportation Science , vol.20 , Issue.5 , pp. 243-257
    • Jaw, J.1    Odoni, A.2    Psaraftis, H.N.3    Watson, N.4
  • 55
    • 2342627669 scopus 로고
    • Reachability in material flow path design
    • Tanchoco, J. M. A. (ed.), Chapman & Hall, London
    • Kim, H. K. and Tanchoco, J. M. A. (1994) Reachability in material flow path design, in Material Flow Systems in Manufacturing, Tanchoco, J. M. A. (ed.), Chapman & Hall, London, pp. 159-176.
    • (1994) Material Flow Systems in Manufacturing , pp. 159-176
    • Kim, H.K.1    Tanchoco, J.M.A.2
  • 56
    • 0026856868 scopus 로고
    • Unidirectional loop network layout problem in automated manufacturing systems
    • Kouvelis, P. and Kim, M. W. (1992) Unidirectional loop network layout problem in automated manufacturing systems. Operations Research, 40(3), 533-550.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 533-550
    • Kouvelis, P.1    Kim, M.W.2
  • 57
    • 0026883177 scopus 로고
    • Heuristic unidirectional flow path design approaches for automated guided vehicle systems
    • Kouvelis, P., Gutierrez, G. J. and Chiang, W. C. (1992) Heuristic unidirectional flow path design approaches for automated guided vehicle systems. International Journal of Production Research, 30(6), 1327-1351.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1327-1351
    • Kouvelis, P.1    Gutierrez, G.J.2    Chiang, W.C.3
  • 59
    • 2342562168 scopus 로고
    • Integrating material flow into a concurrent engineering framework
    • Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI
    • Lacksonen, T. (1995) Integrating material flow into a concurrent engineering framework, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 263-276.
    • (1995) Progress in Material Handling Research , pp. 263-276
    • Lacksonen, T.1
  • 61
    • 0026874435 scopus 로고
    • The vehicle routing problem: An overview of exact and approximate algorithms
    • Laporte, G. (1992) The vehicle routing problem: an overview of exact and approximate algorithms, European Journal of Operational Research, 59(2), 345-358.
    • (1992) European Journal of Operational Research , vol.59 , Issue.2 , pp. 345-358
    • Laporte, G.1
  • 62
    • 0010774133 scopus 로고
    • On the distance constrained vehicle routing problem
    • Li, C-L., Simchi-Levi, D. and Desrochers, M. (1992) On the distance constrained vehicle routing problem. Operations Research, 40(2), 790-799.
    • (1992) Operations Research , vol.40 , Issue.2 , pp. 790-799
    • Li, C.-L.1    Simchi-Levi, D.2    Desrochers, M.3
  • 63
    • 0039235644 scopus 로고
    • Shortest paths, single origin-destination network design, and associated polyhedra
    • Magnanti, T. L. and Mirchandani, P. (1993) Shortest paths, single origin-destination network design, and associated polyhedra. Networks, 23(1), 103-121.
    • (1993) Networks , vol.23 , Issue.1 , pp. 103-121
    • Magnanti, T.L.1    Mirchandani, P.2
  • 64
    • 0021376457 scopus 로고
    • Network design and transportation planning: Models and algorithms
    • Magnanti, T. L. and Wong, R. T. (1984) Network design and transportation planning: models and algorithms. Transportation Science, 18(1), 1-55.
    • (1984) Transportation Science , vol.18 , Issue.1 , pp. 1-55
    • Magnanti, T.L.1    Wong, R.T.2
  • 65
    • 0000687077 scopus 로고
    • A model for the design of zone control automated guided vehicle systems
    • Malmborg, C. J. (1990) A model for the design of zone control automated guided vehicle systems. International Journal of Production Research, 28(10), 1741-1758.
    • (1990) International Journal of Production Research , vol.28 , Issue.10 , pp. 1741-1758
    • Malmborg, C.J.1
  • 66
    • 0020140765 scopus 로고
    • Design of automated guided vehicle systems
    • Maxwell, W. L. and Muckstadt, J. A. (1982) Design of automated guided vehicle systems. IIE Transactions, 14(2), 114-124.
    • (1982) IIE Transactions , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 67
    • 0019546338 scopus 로고
    • Dynamic network flow modeling of fixed path material handling systems
    • Maxwell, W. L. and Wilson, R. C. (1981) Dynamic network flow modeling of fixed path material handling systems. AIIE Transactions, 13(1), 12-21.
    • (1981) AIIE Transactions , vol.13 , Issue.1 , pp. 12-21
    • Maxwell, W.L.1    Wilson, R.C.2
  • 68
    • 2342502927 scopus 로고
    • Computer-aided facilities design revisited: A prototype design workstation for AGV systems
    • White, J. A. and Pence, I. W., Springer-Verlag
    • McGinnis, L. F. (1990) Computer-aided facilities design revisited: a prototype design workstation for AGV systems, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W., Springer-Verlag, pp. 67-93.
    • (1990) Progress in Material Handling and Logistics , vol.2 , pp. 67-93
    • McGinnis, L.F.1
  • 69
    • 33749834100 scopus 로고    scopus 로고
    • The facility layout problem: Recent and emerging trends and perspectives
    • Meller, R. D. and Gau, K.-Y. (1996) The facility layout problem: recent and emerging trends and perspectives. Journal of Manufacturing Systems, 15(5), 351-366.
    • (1996) Journal of Manufacturing Systems , vol.15 , Issue.5 , pp. 351-366
    • Meller, R.D.1    Gau, K.-Y.2
  • 70
    • 0005275842 scopus 로고
    • A modeling framework for integrating layout design and flow network design
    • White, J. A. and Pence, I. W. (eds), Springer-Verlag
    • Montreuil, B. (1990) A modeling framework for integrating layout design and flow network design, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 95-115.
    • (1990) Progress in Material Handling and Logistics , vol.2 , pp. 95-115
    • Montreuil, B.1
  • 71
    • 0024683973 scopus 로고
    • Utilizing cut trees as design skeletons for facility layout
    • Montreuil, B. and Ratliff, H. D. (1989) Utilizing cut trees as design skeletons for facility layout. IIE Transactions, 21(2), 136-143.
    • (1989) IIE Transactions , vol.21 , Issue.2 , pp. 136-143
    • Montreuil, B.1    Ratliff, H.D.2
  • 74
    • 0009351726 scopus 로고
    • Simulation model calculates how many automated guided vehicles are needed
    • Newton, D. (1985) Simulation model calculates how many automated guided vehicles are needed. Industrial Engineering, 17(2), 69-78.
    • (1985) Industrial Engineering , vol.17 , Issue.2 , pp. 69-78
    • Newton, D.1
  • 75
    • 0005275843 scopus 로고    scopus 로고
    • Facility layout and material handling system design integration in manufacturing systems
    • Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI
    • Peters, B. A. and Yang, T. (1996) Facility layout and material handling system design integration in manufacturing systems, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 467-482.
    • (1996) Progress in Material Handling Research , pp. 467-482
    • Peters, B.A.1    Yang, T.2
  • 77
    • 0019016763 scopus 로고
    • A dynamic programming solution to the single vehicle many-to-many immediate request dial a ride problem
    • Psaraftis, H. N. (1980) A dynamic programming solution to the single vehicle many-to-many immediate request dial a ride problem. Transportation Science, 14(2), 130-154.
    • (1980) Transportation Science , vol.14 , Issue.2 , pp. 130-154
    • Psaraftis, H.N.1
  • 80
    • 0009401509 scopus 로고
    • An integrated framework for the design of material flow systems
    • Tanchoco, J. M. A. (ed.), Chapman & Hall, London
    • Rembold, B. F. and Tanchoco, J. M. A. (1994a) An integrated framework for the design of material flow systems, in Material Flow Systems in Manufacturing, Tanchoco, J. M. A. (ed.), Chapman & Hall, London, pp. 3-53.
    • (1994) Material Flow Systems in Manufacturing , pp. 3-53
    • Rembold, B.F.1    Tanchoco, J.M.A.2
  • 83
    • 0021502727 scopus 로고
    • Just-in-time production systems: Replacing complexity with simplicity in manufacturing management
    • Schonberger, R. J. (1984) Just-in-time production systems: replacing complexity with simplicity in manufacturing management. Industrial Engineering, 16(10), 52-63.
    • (1984) Industrial Engineering , vol.16 , Issue.10 , pp. 52-63
    • Schonberger, R.J.1
  • 84
    • 0042088701 scopus 로고
    • Flexible guide path design for automated guided vehicle systems
    • Seo, Y. and Egbelu, P. J. (1995) Flexible guide path design for automated guided vehicle systems. International Journal of Production Research, 33(4), 1135-1156.
    • (1995) International Journal of Production Research , vol.33 , Issue.4 , pp. 1135-1156
    • Seo, Y.1    Egbelu, P.J.2
  • 85
    • 0025417539 scopus 로고
    • An analytical method for configuring fixed-path, closed-loop material handling systems
    • Sharp, G. P. and Liu, F. F. (1990) An analytical method for configuring fixed-path, closed-loop material handling systems. International Journal of Production Research, 28(4), 757-783.
    • (1990) International Journal of Production Research , vol.28 , Issue.4 , pp. 757-783
    • Sharp, G.P.1    Liu, F.F.2
  • 86
    • 0041002507 scopus 로고
    • Planning and Managing Industrial Logistics Systems
    • Elsevier
    • Sims, E. R. (1991) Planning and Managing Industrial Logistics Systems, Advances in Industrial Engineering, vol. 12, Elsevier.
    • (1991) Advances in Industrial Engineering , vol.12
    • Sims, E.R.1
  • 87
    • 0027663979 scopus 로고
    • Design of cellular manufacturing systems: An invited overview
    • Singh, N. (1993) Design of cellular manufacturing systems: an invited overview. European Journal of Operational Research, 69(3), 284-291.
    • (1993) European Journal of Operational Research , vol.69 , Issue.3 , pp. 284-291
    • Singh, N.1
  • 88
    • 0029206206 scopus 로고
    • Network design models for discrete material flow systems: A literature review
    • Sinriech, D. (1995) Network design models for discrete material flow systems: a literature review. International Journal of Advanced Manufacturing Technology, 10(4), 277-291.
    • (1995) International Journal of Advanced Manufacturing Technology , vol.10 , Issue.4 , pp. 277-291
    • Sinriech, D.1
  • 91
    • 0026938781 scopus 로고
    • Impact of unloaded vehicle flow on performance of single loop AGV systems
    • Sinriech, D. and Tanchoco, J. M. A. (1992b) Impact of unloaded vehicle flow on performance of single loop AGV systems. International Journal of Production Research, 30(10), 2237-2252.
    • (1992) International Journal of Production Research , vol.30 , Issue.10 , pp. 2237-2252
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 92
    • 0027558925 scopus 로고
    • Solution methods for the mathematical models of single loop AGV systems
    • Sinriech, D. and Tanchoco, J. M. A. (1993) Solution methods for the mathematical models of single loop AGV systems. International Journal of Production Research, 31(3), 705-725.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 705-725
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 93
    • 0001334378 scopus 로고
    • An introduction to the segmented flow approach for discrete material flow systems
    • Sinriech, D. and Tanchoco, J. M. A. (1995) An introduction to the segmented flow approach for discrete material flow systems. International Journal of Production Research, 33(12), 3381-3410.
    • (1995) International Journal of Production Research , vol.33 , Issue.12 , pp. 3381-3410
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 94
    • 17744415925 scopus 로고    scopus 로고
    • Using CAD for space planning and asset management
    • Sly, D. (1996) Using CAD for space planning and asset management. IIE Solutions, 28(5), 36-45.
    • (1996) IIE Solutions , vol.28 , Issue.5 , pp. 36-45
    • Sly, D.1
  • 95
    • 0030194231 scopus 로고    scopus 로고
    • Layout design and analysis software
    • Sly, D. P., Grajo, E. and Montreuil, B. (1996) Layout design and analysis software. IIE Solutions, 28(7), 18-25.
    • (1996) IIE Solutions , vol.28 , Issue.7 , pp. 18-25
    • Sly, D.P.1    Grajo, E.2    Montreuil, B.3
  • 96
    • 34250111322 scopus 로고
    • Design, planning, scheduling and control problems of flexible manufacturing systems
    • Stecke, K. E. (1985) Design, planning, scheduling and control problems of flexible manufacturing systems. Annals of Operations Research, 3, 3-12.
    • (1985) Annals of Operations Research , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 98
    • 0002554762 scopus 로고
    • Determination of the total number of vehicles in an AGV-based material transport system
    • Tanchoco, J. M. A., Egbelu, P. J. and Taghaboni, F. (1987) Determination of the total number of vehicles in an AGV-based material transport system. Material Flow, 4, 33-51.
    • (1987) Material Flow , vol.4 , pp. 33-51
    • Tanchoco, J.M.A.1    Egbelu, P.J.2    Taghaboni, F.3
  • 100
    • 2342522356 scopus 로고
    • Computerized facilities design
    • Tompkins, J. A. and Moore, J. M. (eds), AIIE, Norcross, GA
    • Tompkins, J. A. and Reed, R. J. (1978) Computerized facilities design, in Computer Aided Layout - a User's Guide, Tompkins, J. A. and Moore, J. M. (eds), AIIE, Norcross, GA, pp. 15-28.
    • (1978) Computer Aided Layout - A User's Guide , pp. 15-28
    • Tompkins, J.A.1    Reed, R.J.2
  • 102
    • 84989743934 scopus 로고
    • A branch-and-bound algorithm for flow-path design of automated guided vehicle systems
    • Venkataramanan, M. A. and Wilson, K. A. (1991) A branch-and-bound algorithm for flow-path design of automated guided vehicle systems. Naval Research Logistics, 38, 431-445.
    • (1991) Naval Research Logistics , vol.38 , pp. 431-445
    • Venkataramanan, M.A.1    Wilson, K.A.2
  • 105
    • 0020100448 scopus 로고
    • Long-range view, better systems integration needed in designs for material handling
    • White, J. A. and Apple, J. M. Jr (1982) Long-range view, better systems integration needed in designs for material handling. Industrial Engineering, 14(3), 50-58.
    • (1982) Industrial Engineering , vol.14 , Issue.3 , pp. 50-58
    • White, J.A.1    Apple Jr., J.M.2
  • 106
    • 2342575986 scopus 로고
    • State-of-the-art modeling techniques for AGV systems design and operation
    • Material Handling Research Center, Georgia Institute of Technology, Atlanta, GA 30332
    • Wilhelm, M. R. and Evans, G. W. (1987) State-of-the-art modeling techniques for AGV systems design and operation, in Material Handling Focus '87, Material Handling Research Center, Georgia Institute of Technology, Atlanta, GA 30332.
    • (1987) Material Handling Focus '87
    • Wilhelm, M.R.1    Evans, G.W.2
  • 107
    • 0023315023 scopus 로고
    • Solving quadratic assignment problems by 'simulated annealing'
    • Wilhelm, M. R. and Ward, T. L. (1987) Solving quadratic assignment problems by 'simulated annealing'. IIE Transactions, 19(2), 107-119.
    • (1987) IIE Transactions , vol.19 , Issue.2 , pp. 107-119
    • Wilhelm, M.R.1    Ward, T.L.2
  • 108
    • 0024682879 scopus 로고
    • Submodularity and valid inequalities in capacitated fixed charge networks
    • Wolsey, L. A., (1989) Submodularity and valid inequalities in capacitated fixed charge networks. Operations Research Letters, 8(2), 119-124.
    • (1989) Operations Research Letters , vol.8 , Issue.2 , pp. 119-124
    • Wolsey, L.A.1
  • 109
    • 0005343132 scopus 로고
    • Concurrent design of shop layout and material handling
    • Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI
    • Wu, C. T. and Egbelu, P. J. (1995) Concurrent design of shop layout and material handling, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 147-168.
    • (1995) Progress in Material Handling Research , pp. 147-168
    • Wu, C.T.1    Egbelu, P.J.2
  • 110
    • 0011770911 scopus 로고
    • Use of spread sheet analysis for evaluating AGV systems
    • Wysk, R. A., Egbelu, P. J., Zhou, C. and Ghosh, B. K. (1987) Use of spread sheet analysis for evaluating AGV systems. Material Flow, 4(1), 53-64.
    • (1987) Material Flow , vol.4 , Issue.1 , pp. 53-64
    • Wysk, R.A.1    Egbelu, P.J.2    Zhou, C.3    Ghosh, B.K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.