-
1
-
-
0042709102
-
-
Ph.D. Thesis, Faculty of Mechanical Engineering, University of Twente, Enschede, The Netherlands
-
Aanen, E. (1988), "Planning and scheduling in a flexible manufacturing system", Ph.D. Thesis, Faculty of Mechanical Engineering, University of Twente, Enschede, The Netherlands.
-
(1988)
Planning and Scheduling in a Flexible Manufacturing System
-
-
Aanen, E.1
-
2
-
-
0027675742
-
A scheduling approach for a flexible manufacturing system
-
Aanen, E., Gaalman, G.J.C., and Nawijn, W.M. (1993), "A scheduling approach for a flexible manufacturing system", International Journal of Production Research 31, 2369-2385.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2369-2385
-
-
Aanen, E.1
Gaalman, G.J.C.2
Nawijn, W.M.3
-
5
-
-
0041886268
-
-
Rapporto Inferno No. 93/20, Politecnico di Milano, Dipartimento di Elletronica e Informazione, Italy
-
Dell'Amico, M. (1993), "Shop problems with two machines and time lags", Rapporto Inferno No. 93/20, Politecnico di Milano, Dipartimento di Elletronica e Informazione, Italy.
-
(1993)
Shop Problems with Two Machines and Time Lags
-
-
Dell'amico, M.1
-
6
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R.L., Lawler, E.L., Lenstra, J.K., and Rinnooy Kan, A.H.G. (1979), "Optimization and approximation in deterministic sequencing and scheduling: A survey", Annals of Discrete Mathematics 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
7
-
-
0000410538
-
Scheduling of re-entrant flow shops
-
Graves, S.C., Meal, H.C., Stefek, D., and Zeghmi, A.H. (1983), "Scheduling of re-entrant flow shops", Journal of Operations Management 3, 197-207.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 197-207
-
-
Graves, S.C.1
Meal, H.C.2
Stefek, D.3
Zeghmi, A.H.4
-
8
-
-
0015403480
-
Optimal scheduling in a multistage flowshop
-
Gupta, J.N.D. (1972), "Optimal scheduling in a multistage flowshop", AIIE Transactions 4, 238-243.
-
(1972)
AIIE Transactions
, vol.4
, pp. 238-243
-
-
Gupta, J.N.D.1
-
9
-
-
0003075019
-
Optimal two-and three-stage production schedules with set-up times included
-
Johnson, S.M. (1954), "Optimal two-and three-stage production schedules with set-up times included", Naval Research Logistics Quarterly 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
10
-
-
85033900772
-
-
Working Paper, University of Twente, Enschede, The Netherlands
-
Kem, W., and Nawijn, W.M. (1991), "Scheduling multi-operation jobs with time lags on a single machine", Working Paper, University of Twente, Enschede, The Netherlands.
-
(1991)
Scheduling Multi-operation Jobs with Time Lags on a Single Machine
-
-
Kem, W.1
Nawijn, W.M.2
-
11
-
-
0021503946
-
V-shop scheduling
-
Lev, V., and Adiri, I. (1984), "V-shop scheduling", European Journal of Operational Research 18, 51-56.
-
(1984)
European Journal of Operational Research
, vol.18
, pp. 51-56
-
-
Lev, V.1
Adiri, I.2
-
12
-
-
0001551888
-
Sequencing n jobs on two machines with arbitrary time lags
-
Mitten, L.G. (1958), "Sequencing n jobs on two machines with arbitrary time lags", Management Science 5, 293-298.
-
(1958)
Management Science
, vol.5
, pp. 293-298
-
-
Mitten, L.G.1
-
13
-
-
0009681798
-
Flow shop scheduling with multiple operations and time lags
-
Riezebos, J., Gaalman, G.J.C., and Gupta, J.N.D. (1995), "Flow shop scheduling with multiple operations and time lags", Journal of Intelligent Manufacturing 6, 105-115.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, pp. 105-115
-
-
Riezebos, J.1
Gaalman, G.J.C.2
Gupta, J.N.D.3
-
15
-
-
0020736891
-
Flow shop problems with time lags
-
Szwarc, W. (1983), "Flow shop problems with time lags", Management Science 29, 477-481.
-
(1983)
Management Science
, vol.29
, pp. 477-481
-
-
Szwarc, W.1
|