-
1
-
-
0004829780
-
Part selection problems in flexible manufacturing systems
-
Ann Arbor, Elsevier, Amsterdam
-
Hwang, S.S. (1986), "Part selection problems in flexible manufacturing systems", Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Ann Arbor, Elsevier, Amsterdam, pp. 297-309.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 297-309
-
-
Hwang, S.S.1
-
2
-
-
0024715676
-
Modelling and solving an FMS part selection problem
-
Hwang, S.S. and Shogan, A.W. (1987), "Modelling and solving an FMS part selection problem", International Journal of Production Research, Vol. 27 No. 8, pp. 1349-66.
-
(1987)
International Journal of Production Research
, vol.27
, Issue.8
, pp. 1349-1366
-
-
Hwang, S.S.1
Shogan, A.W.2
-
3
-
-
0002115242
-
Goal oriented heuristic for the FMS loading (and part type selection) problems
-
Elsevier, Amsterdam
-
Moreno, A.A. and Ding, EY. (1989), "Goal oriented heuristic for the FMS loading (and part type selection) problems", Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier, Amsterdam, pp. 105-10.
-
(1989)
Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 105-110
-
-
Moreno, A.A.1
Ding, E.Y.2
-
4
-
-
0002874558
-
Formulation and heuristic solution for parts grouping and tool handling in flexible manufacturing systems
-
Elsevier, Ann Arbor, Amsterdam
-
Rajagopalan, S. (1986), "Formulation and heuristic solution for parts grouping and tool handling in flexible manufacturing systems", Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier, Ann Arbor, Amsterdam, pp. 311-20.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 311-320
-
-
Rajagopalan, S.1
-
5
-
-
11544282956
-
Heuristic part selection procedures for flexible manufacturing systems
-
Mitai (Ed.), Elsevier, Amsterdam
-
Raturi, A.S., Meredith, J. and Vineyard, M. (1988), "Heuristic part selection procedures for flexible manufacturing systems", in Mitai (Ed.), Recent Developments in Production Research, Elsevier, Amsterdam.
-
(1988)
Recent Developments in Production Research
-
-
Raturi, A.S.1
Meredith, J.2
Vineyard, M.3
-
6
-
-
0002225228
-
Characteristics of US flexible manufacturing systems - A survey
-
Elsevier, Ann Arbor, Amsterdam
-
Smith, M.L., Ramesh, R., Dudek, R.A. and Blair, E.L. (1986), "Characteristics of US flexible manufacturing systems - a survey", Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier, Ann Arbor, Amsterdam, pp. 477-86.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 477-486
-
-
Smith, M.L.1
Ramesh, R.2
Dudek, R.A.3
Blair, E.L.4
-
7
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
-
Stecke, K.E. (1983), "Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems", Management Science, Vol. 29 No. 3, pp. 273-88.
-
(1983)
Management Science
, vol.29
, Issue.3
, pp. 273-288
-
-
Stecke, K.E.1
-
8
-
-
34250111322
-
Design, planning, scheduling, and control problems for flexible manufacturing systems
-
Stecke, K.E. (1985), "Design, planning, scheduling, and control problems for flexible manufacturing systems", Annals of Operations Research, Vol. 3, pp. 3-12.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 3-12
-
-
Stecke, K.E.1
-
9
-
-
0003019633
-
A study of FMS part type selection approach for short-term production planning
-
Stecke, K.E. and Kim, I. (1986), "A study of FMS part type selection approach for short-term production planning", International Journal of Flexible Manufacturing Systems, Vol. 1 No. 1, pp. 7-29.
-
(1986)
International Journal of Flexible Manufacturing Systems
, vol.1
, Issue.1
, pp. 7-29
-
-
Stecke, K.E.1
Kim, I.2
-
10
-
-
0011782635
-
Sequential decision procedure for batching and balancing in FMSs
-
Elsevier, Ann Arbor, Amsterdam
-
Whitney, C.K. and Gaul, T.S. (1984), "Sequential decision procedure for batching and balancing in FMSs", Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier, Ann Arbor, Amsterdam, pp. 243-8.
-
(1984)
Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 243-248
-
-
Whitney, C.K.1
Gaul, T.S.2
|