메뉴 건너뛰기




Volumn 18, Issue 1, 1998, Pages 57-67

Some aspects of real-time production control in distributed flexible assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER AIDED DESIGN; DISTRIBUTED COMPUTER SYSTEMS; JUST IN TIME PRODUCTION; ROBOTIC ASSEMBLY; SCHEDULING;

EID: 0031681841     PISSN: 01445154     EISSN: None     Source Type: Journal    
DOI: 10.1108/01445159810201289     Document Type: Article
Times cited : (3)

References (30)
  • 2
    • 11544267357 scopus 로고
    • Real-time scheduling and SBM
    • MRPII, MCB University Press, UK
    • Barker, J.R. (1994), MRPII, "Real-time scheduling and SBM", Assembly Automation, Vol. 14 No. 2, MCB University Press, UK, pp. 22-8.
    • (1994) Assembly Automation , vol.14 , Issue.2 , pp. 22-28
    • Barker, J.R.1
  • 3
    • 8344258116 scopus 로고    scopus 로고
    • MRPII in reverse
    • Bartholomew, D. (1997), "MRPII in reverse", Industry Week, Vol. 246 No. 14, pp. 42-4.
    • (1997) Industry Week , vol.246 , Issue.14 , pp. 42-44
    • Bartholomew, D.1
  • 4
  • 5
    • 0018999316 scopus 로고
    • Asynchronous distributed simulation via a sequence of parallel computations
    • Chandi, K. and Mistra, J. (1981), "Asynchronous distributed simulation via a sequence of parallel computations", Communications of ACM, Vol. 24 No. 4, pp. 198-406.
    • (1981) Communications of ACM , vol.24 , Issue.4 , pp. 198-406
    • Chandi, K.1    Mistra, J.2
  • 6
    • 0012553518 scopus 로고    scopus 로고
    • Achieving maximum supply chain efficiency
    • Chen, J. (1997), "Achieving maximum supply chain efficiency", IEE Solutions, Vol. 29 No. 6, pp. 30-5.
    • (1997) IEE Solutions , vol.29 , Issue.6 , pp. 30-35
    • Chen, J.1
  • 8
    • 0031187363 scopus 로고    scopus 로고
    • Evaluation of just-in-time alternatives in the electric wireharness industry
    • Estrada, F., Villalobos, J.R. and Roderick, L. (1997), "Evaluation of just-in-time alternatives in the electric wireharness industry", International Journal of Production Research, Vol. 35 No. 7, pp. 1993-2008.
    • (1997) International Journal of Production Research , vol.35 , Issue.7 , pp. 1993-2008
    • Estrada, F.1    Villalobos, J.R.2    Roderick, L.3
  • 9
    • 0031191561 scopus 로고    scopus 로고
    • A decision-making perspective on hybrid manufacturing system control
    • Gong, D.C. (1997), "A decision-making perspective on hybrid manufacturing system control", International Journal of Production Research, Vol. 35 No. 7, pp. 1945-1959.
    • (1997) International Journal of Production Research , vol.35 , Issue.7 , pp. 1945-1959
    • Gong, D.C.1
  • 10
    • 11544323509 scopus 로고    scopus 로고
    • Efficiency considerations in electronics assembly
    • Hall, S. (1997), "Efficiency considerations in electronics assembly", Circuits Assembly, Vol. 8 No. 3, pp. 46-8, 50.
    • (1997) Circuits Assembly , vol.8 , Issue.3 , pp. 46-48
    • Hall, S.1
  • 11
    • 0031186491 scopus 로고    scopus 로고
    • Taking another look at continuous flow manufacturing
    • Hase, R. (1997), "Taking another look at continuous flow manufacturing", IIE Solutions, Vol. 29 No. 7, p. 30-3.
    • (1997) IIE Solutions , vol.29 , Issue.7 , pp. 30-33
    • Hase, R.1
  • 12
    • 0017996760 scopus 로고
    • Time. Clocks and the ordering of events in a distributed system
    • Lamport, L. (1981), "Time. Clocks and the ordering of events in a distributed system", Communications of ACM, Vol. 21 No. 7, pp. 558-65.
    • (1981) Communications of ACM , vol.21 , Issue.7 , pp. 558-565
    • Lamport, L.1
  • 14
    • 0346405828 scopus 로고
    • High level simulation of flexible card assembly lines
    • IBM Thomas J. Watson Research Center, Yorktown Heights, New York, NY, USA
    • Pasqueir, J. (1988), "High level simulation of flexible card assembly lines". Research ReportRC-10881, IBM Thomas J. Watson Research Center, Yorktown Heights, New York, NY, USA.
    • (1988) Research ReportRC-10881
    • Pasqueir, J.1
  • 17
    • 0022136530 scopus 로고
    • FMS in CIM (flexible manufacturing systems in computer integrated manufacturing)
    • Cambridge University Press, Cambridge
    • Ranky, P.G. (1985), "FMS in CIM (flexible manufacturing systems in computer integrated manufacturing)", Robotica, Cambridge University Press, Cambridge, Vol. 3, pp. 205-14.
    • (1985) Robotica , vol.3 , pp. 205-214
    • Ranky, P.G.1
  • 18
    • 0345774659 scopus 로고
    • End of arm tool management system for robotized assembly lines
    • SME, Long Beach, CA
    • Ranky, RG. (1986a), "End of arm tool management system for robotized assembly lines", Robots West Conference, SME, Long Beach, CA.
    • (1986) Robots West Conference
    • Ranky, R.G.1
  • 19
    • 0347035831 scopus 로고
    • A program prospectus for the simulation, design and implementation of flexible assembly and inspection cells
    • Ann Arbor, Ml
    • Ranky, P.G. (1986b), "A program prospectus for the simulation, design and implementation of flexible assembly and inspection cells", International FMS Conference at the University of Michigan, Ann Arbor, Ml.
    • (1986) International FMS Conference at the University of Michigan
    • Ranky, P.G.1
  • 24
    • 0347035832 scopus 로고
    • Design and solid model simulation of generic assembly cells and systems
    • Osaka, Japan
    • Ranky, P.G. and Francis, P.M. (1986), "Design and solid model simulation of generic assembly cells and systems", Japan-USA Symposium on Flexible Automation, Osaka, Japan.
    • (1986) Japan-USA Symposium on Flexible Automation
    • Ranky, P.G.1    Francis, P.M.2
  • 25
    • 0030651464 scopus 로고    scopus 로고
    • Manufacturing automation brings Hazelock productivity improvements and consistent quality
    • Rooks, B. (1997), "Manufacturing automation brings Hazelock productivity improvements and consistent quality", Industrial Robot, Vol. 24 No. 3, pp. 219-22.
    • (1997) Industrial Robot , vol.24 , Issue.3 , pp. 219-222
    • Rooks, B.1
  • 27
    • 0030649075 scopus 로고    scopus 로고
    • Adaptive simulation of a keyboard assembly cell
    • Spedding, T.A. (1997), "Adaptive simulation of a keyboard assembly cell", Integrated Manufaduring Systems, Vol. 8 No. 1, pp. 50-8.
    • (1997) Integrated Manufaduring Systems , vol.8 , Issue.1 , pp. 50-58
    • Spedding, T.A.1
  • 29
    • 0001955217 scopus 로고    scopus 로고
    • Virtual enterprise: Myth and reality
    • Walton, J. and Whicker, L. (1996), "Virtual enterprise: myth and reality", Control, Vol. 22 No. 8, pp. 22-5.
    • (1996) Control , vol.22 , Issue.8 , pp. 22-25
    • Walton, J.1    Whicker, L.2
  • 30
    • 0030648693 scopus 로고    scopus 로고
    • Manufacturing on demand in production networks
    • Westkampfer, E. (1997), "Manufacturing on demand in production networks", Annals of CIRP, Vol. 46 No. 1, pp. 329-34.
    • (1997) Annals of CIRP , vol.46 , Issue.1 , pp. 329-334
    • Westkampfer, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.