메뉴 건너뛰기




Volumn 14, Issue 6, 1998, Pages 441-449

Performability-based fleet sizing in a material handling system

Author keywords

Fleet size; Material handling; Performability; Regression

Indexed keywords

FAILURE ANALYSIS; FLEET OPERATIONS; MATHEMATICAL MODELS; PERFORMANCE; REGRESSION ANALYSIS; RELIABILITY;

EID: 0031621492     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/BF01304623     Document Type: Article
Times cited : (20)

References (24)
  • 1
    • 0025417539 scopus 로고
    • An analytical method for configuring fixed-path, closed-loop material handling systems
    • Gunter P. Sharp and Fuh-Hwa Franklin Liu, "An analytical method for configuring fixed-path, closed-loop material handling systems", International Journal of Production Research, 28(4), pp. 757-783, 1990.
    • (1990) International Journal of Production Research , vol.28 , Issue.4 , pp. 757-783
    • Sharp, G.P.1    Liu, F.-H.F.2
  • 4
    • 0009351726 scopus 로고
    • Simulation model calculates how many automated guided vehicles are needed
    • February
    • Dave Newton, "Simulation model calculates how many automated guided vehicles are needed", Industrial Engineering, pp. 68-78, February 1985.
    • (1985) Industrial Engineering , pp. 68-78
    • Newton, D.1
  • 5
    • 0024065468 scopus 로고
    • A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system
    • Mufit Ozden, "A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system", International Journal of Production Research, 26(8), pp. 1353-1366, 1988.
    • (1988) International Journal of Production Research , vol.26 , Issue.8 , pp. 1353-1366
    • Ozden, M.1
  • 6
    • 0025417062 scopus 로고
    • Simulation study of an automated guided-vehicle system in a Yugoslav hospital
    • Vlatko Ceric, "Simulation study of an automated guided-vehicle system in a Yugoslav hospital", Journal of the Operational Research Society, 41(4), pp. 299-310, 1990.
    • (1990) Journal of the Operational Research Society , vol.41 , Issue.4 , pp. 299-310
    • Ceric, V.1
  • 7
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • W. L. Maxwell and J. A. Muckstadt, "Design of automatic guided vehicle systems", IIE Transactions, 14(2), pp. 114-124, 1982.
    • (1982) IIE Transactions , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 8
    • 0344638307 scopus 로고
    • How to estimate the number of AGVs you need
    • October
    • Kevin R. Fitzgerald, "How to estimate the number of AGVs you need", Modern Materials Handling, p. 79, October 1985.
    • (1985) Modern Materials Handling , pp. 79
    • Fitzgerald, K.R.1
  • 9
    • 0002894516 scopus 로고
    • The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
    • Pius J. Egbelu, "The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system", Material Flow, 4. pp. 17-32, 1987.
    • (1987) Material Flow , vol.4 , pp. 17-32
    • Egbelu, P.J.1
  • 10
    • 0025482436 scopus 로고
    • Design of an automated guided vehicle-based material handling system for a flexible manufacturing system
    • B. Mahadevan and T. T. Narendran, "Design of an automated guided vehicle-based material handling system for a flexible manufacturing system", International Journal of Production Research, 28(9), pp. 1611-1622, 1990.
    • (1990) International Journal of Production Research , vol.28 , Issue.9 , pp. 1611-1622
    • Mahadevan, B.1    Narendran, T.T.2
  • 13
    • 0026152540 scopus 로고
    • Mathematical modeling of the AGVs capacity requirements planning problem
    • R. G. Kasilingam, "Mathematical modeling of the AGVs capacity requirements planning problem", Engineering Cost and Production Economics, 21, pp. 171-175, 1991.
    • (1991) Engineering Cost and Production Economics , vol.21 , pp. 171-175
    • Kasilingam, R.G.1
  • 14
    • 0027663342 scopus 로고
    • Minimizing the fleet size with dependent time-window and single-track constraints
    • Lei Lei, Ronald Armstrong and Shanhong Gu, "Minimizing the fleet size with dependent time-window and single-track constraints", Operations Research Letters, 14, pp. 91-98, 1993.
    • (1993) Operations Research Letters , vol.14 , pp. 91-98
    • Lei, L.1    Armstrong, R.2    Gu, S.3
  • 15
    • 0027875444 scopus 로고
    • An analytic model for design of a multivehicle automated guided vehicle system
    • M. Eric Johnson and Margaret L. Brandeau, "An analytic model for design of a multivehicle automated guided vehicle system", Management Science, 39(12), pp. 1477-1489, 1993.
    • (1993) Management Science , vol.39 , Issue.12 , pp. 1477-1489
    • Eric Johnson, M.1    Brandeau, M.L.2
  • 16
    • 0031069708 scopus 로고    scopus 로고
    • Fleet sizing and empty equipment redistribution for center-terminal transportation networks
    • Yafeng Du and Randolph Hall, "Fleet sizing and empty equipment redistribution for center-terminal transportation networks", Management Science, 43(2), pp. 145-157, 1997.
    • (1997) Management Science , vol.43 , Issue.2 , pp. 145-157
    • Du, Y.1    Hall, R.2
  • 17
    • 0002554762 scopus 로고
    • Determination of the total number of vehicles in an AGV-based material transport system
    • J. M. A. Tanchoco, P. J. Egbelu and Fatanch Taghaboni, "Determination of the total number of vehicles in an AGV-based material transport system", Material Flow. 4, pp. 33-51, 1987.
    • (1987) Material Flow. , vol.4 , pp. 33-51
    • Tanchoco, J.M.A.1    Egbelu, P.J.2    Taghaboni, F.3
  • 18
    • 0011770911 scopus 로고
    • Use of spread sheet analysis for evaluating AGV systems
    • R. A. Wysk, Pius J. Egbelu, Chen Zhou and B. K. Ghosh, "Use of spread sheet analysis for evaluating AGV systems", Material Flow, 4, pp. 53-64, 1987.
    • (1987) Material Flow , vol.4 , pp. 53-64
    • Wysk, R.A.1    Egbelu, P.J.2    Zhou, C.3    Ghosh, B.K.4
  • 19
    • 0027543063 scopus 로고
    • Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system
    • Pius J. Egbelu, "Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system", International Journal of Production Economics, 29(1), pp. 49-64, 1993.
    • (1993) International Journal of Production Economics , vol.29 , Issue.1 , pp. 49-64
    • Egbelu, P.J.1
  • 20
    • 0027594172 scopus 로고
    • Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended timed Petri net-based approach
    • K. Ravi Raju and O. V. Krishnaiah Chetty, "Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed Petri net-based approach", International Journal of Production Research, 31(5), pp. 1069-1096, 1993.
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1069-1096
    • Ravi Raju, K.1    Krishnaiah Chetty, O.V.2
  • 21
    • 0003094781 scopus 로고
    • A hybrid modelling approach to the design of an AGV-based material handling system for an FMS
    • B. Mahadevan and T. T. Narendran. "A hybrid modelling approach to the design of an AGV-based material handling system for an FMS", International Journal of Production Research, 32(9), pp. 2015-2030, 1994.
    • (1994) International Journal of Production Research , vol.32 , Issue.9 , pp. 2015-2030
    • Mahadevan, B.1    Narendran, T.T.2
  • 23
    • 84946657020 scopus 로고
    • Some new three-level designs for the study of quantitative variables
    • G. E. P. Box and D. W. Behnken, "Some new three-level designs for the study of quantitative variables", Technometrics, 2, pp. 455-476, 1960.
    • (1960) Technometrics , vol.2 , pp. 455-476
    • Box, G.E.P.1    Behnken, D.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.