|
Volumn 171, Issue 1-3, 1997, Pages 125-136
|
Planned and implemented remedial measures to prevent IGSCC and to ensure safe plant operation with BWR piping systems made of stabilized austenitic steels
a b c d e f g h
a
SIEMENS AG
(Germany)
c
KK Krümmel
(Germany)
d
EON Bayern AG
(Germany)
g
TÜV Südwest
(Germany)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ACCIDENT PREVENTION;
AUSTENITE;
BOILING WATER REACTORS;
NUCLEAR POWER PLANTS;
STAINLESS STEEL;
STRESS CORROSION CRACKING;
INTERGRANULAR STRESS CORROSION CRACKING (IGSCC);
PIPING SYSTEMS;
|
EID: 0031549056
PISSN: 00295493
EISSN: None
Source Type: Journal
DOI: 10.1016/s0029-5493(96)01311-8 Document Type: Article |
Times cited : (7)
|
References (8)
|