|
Volumn 123, Issue 1-4, 1997, Pages 69-72
|
Status and plans for the PRIME lab AMS facility
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ENGINEERING FACILITIES;
ENGINEERING RESEARCH;
PARTICLE ACCELERATORS;
RADIOISOTOPES;
ACCELERATOR MASS SPECTROMETRY (AMS);
INJECTOR SYSTEMS;
PURDUE RARE ISOTOPE MEASUREMENT (PRIME) LABORATORY;
TERMINAL STRIPPER SYSTEMS;
MASS SPECTROMETRY;
|
EID: 0031546994
PISSN: 0168583X
EISSN: None
Source Type: Journal
DOI: 10.1016/S0168-583X(96)00621-0 Document Type: Article |
Times cited : (33)
|
References (8)
|