-
1
-
-
0002159168
-
Recent advances in crew-pairing optimization at American Airlines
-
R. Anbil, E. Gelman, B. Patty and R. Tanga, Recent advances in crew-pairing optimization at American Airlines, Interfaces 21(1991)62-74.
-
(1991)
Interfaces
, vol.21
, pp. 62-74
-
-
Anbil, R.1
Gelman, E.2
Patty, B.3
Tanga, R.4
-
3
-
-
84896876201
-
Workforce allocation in cyclical scheduling problems: A survey
-
K.R. Baker, Workforce allocation in cyclical scheduling problems: A survey, Operations Research Quarterly 27(1976)155-167.
-
(1976)
Operations Research Quarterly
, vol.27
, pp. 155-167
-
-
Baker, K.R.1
-
4
-
-
0040068881
-
-
Technical Report COC-91-01, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332
-
C. Barnhart, E.L. Johnson, R. Anbil and L. Hatay, A column generation technique for the long-haul crew assignment problem, Technical Report COC-91-01, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332, 1991.
-
(1991)
A Column Generation Technique for the Long-haul Crew Assignment Problem
-
-
Barnhart, C.1
Johnson, E.L.2
Anbil, R.3
Hatay, L.4
-
5
-
-
84985773391
-
A comparative evaluation of labor tour scheduling methods
-
S.E. Bechtold, M.J. Brusco and M.J. Showalter, A comparative evaluation of labor tour scheduling methods, Decision Science 22(1991)683-699
-
(1991)
Decision Science
, vol.22
, pp. 683-699
-
-
Bechtold, S.E.1
Brusco, M.J.2
Showalter, M.J.3
-
6
-
-
0000223585
-
Improving personnel scheduling at airline stations
-
M.J. Brusco, L.W. Jacobs, R.J. Bongiorno, D.V. Loyns and B. Tang, Improving personnel scheduling at airline stations, Operations Research 43(1995)741-751.
-
(1995)
Operations Research
, vol.43
, pp. 741-751
-
-
Brusco, M.J.1
Jacobs, L.W.2
Bongiorno, R.J.3
Loyns, D.V.4
Tang, B.5
-
8
-
-
84872984910
-
-
Technical Report 13-7-92, The Preston Group 488, Victoria Street, Richmond, VIC 3121, Australia
-
D. Dowling, TMS simulated annealing explained, Technical Report 13-7-92, The Preston Group 488, Victoria Street, Richmond, VIC 3121, Australia, 1992.
-
(1992)
TMS Simulated Annealing Explained
-
-
Dowling, D.1
-
10
-
-
84873007095
-
-
Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia
-
A. Ernst, M. Krishnamoorthy and D. Dowling, Train driver rostering using simulated annealing, Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia, 1992.
-
(1992)
Train Driver Rostering Using Simulated Annealing
-
-
Ernst, A.1
Krishnamoorthy, M.2
Dowling, D.3
-
11
-
-
0023455954
-
The fixed job schedule problem with spread-time constraints
-
M. Fischetti, S. Martello and P. Toth, The fixed job schedule problem with spread-time constraints, Operations Research 35(1987)849-858.
-
(1987)
Operations Research
, vol.35
, pp. 849-858
-
-
Fischetti, M.1
Martello, S.2
Toth, P.3
-
12
-
-
0024663946
-
The fixed job schedule problem with working-time constraints
-
M. Fischetti, S. Martello and P. Toth, The fixed job schedule problem with working-time constraints, Operations Research 37(1989)395-403.
-
(1989)
Operations Research
, vol.37
, pp. 395-403
-
-
Fischetti, M.1
Martello, S.2
Toth, P.3
-
13
-
-
0012266595
-
Approximation algorithms for fixed job schedule problems
-
M. Fischetti, S. Martello and P. Toth, Approximation algorithms for fixed job schedule problems, Operations Research 40(1992)S96-S108.
-
(1992)
Operations Research
, vol.40
-
-
Fischetti, M.1
Martello, S.2
Toth, P.3
-
14
-
-
0003880013
-
-
Addison-Wesley, New York
-
E. Gamma, R. Helm, R. Johnson and J. Vlissides, Design Patterns: Elements of Reusable Object-Oriented Software, Addison-Wesley, New York, 1995.
-
(1995)
Design Patterns: Elements of Reusable Object-Oriented Software
-
-
Gamma, E.1
Helm, R.2
Johnson, R.3
Vlissides, J.4
-
15
-
-
0000291432
-
Optimizing flight crew schedules
-
I. Gershkoff, Optimizing flight crew schedules, Interfaces 19(1989)29-43.
-
(1989)
Interfaces
, vol.19
, pp. 29-43
-
-
Gershkoff, I.1
-
16
-
-
0016985083
-
Heuristic methods for telephone operator shifting scheduling: An experimental analysis
-
W.B. Henderson and W.L. Berry, Heuristic methods for telephone operator shifting scheduling: An experimental analysis, Management Science 22(1976)1372-1380.
-
(1976)
Management Science
, vol.22
, pp. 1372-1380
-
-
Henderson, W.B.1
Berry, W.L.2
-
17
-
-
0027614308
-
Solving airline crew scheduling problems by branch-and-cut
-
K.L. Hoffman and M. Padberg, Solving airline crew scheduling problems by branch-and-cut, Management Science 39(1993)657-782.
-
(1993)
Management Science
, vol.39
, pp. 657-782
-
-
Hoffman, K.L.1
Padberg, M.2
-
18
-
-
0022519776
-
United Airlines station manpower planning system
-
T.J. Holloran and J.E. Byrn, United Airlines station manpower planning system, Interfaces 16 (1986)39-50.
-
(1986)
Interfaces
, vol.16
, pp. 39-50
-
-
Holloran, T.J.1
Byrn, J.E.2
-
19
-
-
84873011047
-
-
Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia
-
M. Krishnamoorthy, A. Ernst and J. E. Beasley, Formulations and algorithms for the personnel task scheduling problem, Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia, 1997.
-
(1997)
Formulations and Algorithms for the Personnel Task Scheduling Problem
-
-
Krishnamoorthy, M.1
Ernst, A.2
Beasley, J.E.3
-
20
-
-
0023089357
-
Operator workforce planning in the transit industry
-
H. Koutsopoulos and N. Wilson, Operator workforce planning in the transit industry, Transportation Research 21A(1987)127-138.
-
(1987)
Transportation Research
, vol.21 A
, pp. 127-138
-
-
Koutsopoulos, H.1
Wilson, N.2
-
21
-
-
0020797571
-
Simple approaches to shift, days-off and tour scheduling
-
J.G. Morris and M.J. Showalter, Simple approaches to shift, days-off and tour scheduling, Management Science 29(1983)942-950.
-
(1983)
Management Science
, vol.29
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
23
-
-
0024701459
-
On optimal column-generation-with-ranking algorithm for very large scale set partitioning problems in traffic assignment
-
C.C. Ribeiro, M. Minoux and M.C. Penna, On optimal column-generation-with-ranking algorithm for very large scale set partitioning problems in traffic assignment, European Journal of Operational Research 41(1989)232-239.
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 232-239
-
-
Ribeiro, C.C.1
Minoux, M.2
Penna, M.C.3
-
24
-
-
21144471416
-
Station staffing at Pan American World Airways
-
S. Schindler and T. Semmel, Station staffing at Pan American World Airways, Interfaces 23(1993) 91-98.
-
(1993)
Interfaces
, vol.23
, pp. 91-98
-
-
Schindler, S.1
Semmel, T.2
-
26
-
-
0019045447
-
Scheduling aircraft cleaning crews
-
H.I. Stern and M. Hersh, Scheduling aircraft cleaning crews, Transportation Science 14(1980)277-291.
-
(1980)
Transportation Science
, vol.14
, pp. 277-291
-
-
Stern, H.I.1
Hersh, M.2
-
27
-
-
0030122628
-
A graph colouring model for assigning a heterogenous workforce to a given schedule
-
V. Valls, A. Pérez and S. Quintanilla, A graph colouring model for assigning a heterogenous workforce to a given schedule, European Journal of Operational Research 90(1996)285-302.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 285-302
-
-
Valls, V.1
Pérez, A.2
Quintanilla, S.3
-
28
-
-
84872998050
-
-
Technical Report COC-94-07, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332
-
P.H. Vance, C. Barnhart, E.L. Johnson and G.L. Nemhauser, Airline crew scheduling, Technical Report COC-94-07, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332, 1994.
-
(1994)
Airline Crew Scheduling
-
-
Vance, P.H.1
Barnhart, C.2
Johnson, E.L.3
Nemhauser, G.L.4
|