-
1
-
-
0004102424
-
-
Dow Jones-Irwin, Homewood, Illinois
-
Hall, R. W. Zero Inventories, 1983 (Dow Jones-Irwin, Homewood, Illinois).
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
3
-
-
0027347678
-
Uses and limits of total productive maintenance
-
Kelly, A. and Harris, M. J. Uses and limits of total productive maintenance. Prof. Engng, 1993, 6(1), 9-11.
-
(1993)
Prof. Engng
, vol.6
, Issue.1
, pp. 9-11
-
-
Kelly, A.1
Harris, M.J.2
-
5
-
-
0003463029
-
-
Rawson Associates, New York
-
Womack, J. P., Jones, D. T. and Roos, D. The Machine that Changed the World, 1990 (Rawson Associates, New York).
-
(1990)
The Machine That Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
-
6
-
-
33746990905
-
-
Productivity Press, Cambridge, Massachusetts
-
Shirose, K. TPM for Workshop Leaders, 1992 (Productivity Press, Cambridge, Massachusetts).
-
(1992)
TPM for Workshop Leaders
-
-
Shirose, K.1
-
7
-
-
0022677932
-
TPM - Challenge to the improvement of productivity by small group activities
-
Nakajima, S. TPM - challenge to the improvement of productivity by small group activities. Maintenance Manag. Int., 1971, 6(2), 73-83.
-
(1971)
Maintenance Manag. Int.
, vol.6
, Issue.2
, pp. 73-83
-
-
Nakajima, S.1
-
8
-
-
0027574153
-
A dose of TPM
-
Koelsch, J. R. A dose of TPM. Mfg Engng, 1993, 110(4), 63-66.
-
(1993)
Mfg Engng
, vol.110
, Issue.4
, pp. 63-66
-
-
Koelsch, J.R.1
-
10
-
-
0003410612
-
-
Productivity Press, Cambridge, Massachusetts
-
Nakajima, S. Introduction to TPM, 1988 (Productivity Press, Cambridge, Massachusetts).
-
(1988)
Introduction to TPM
-
-
Nakajima, S.1
-
14
-
-
33746959545
-
Rewriting the rules of the game
-
Thurow, L. Rewriting the rules of the game. Mfg Engng, 1994, 111(6), 176.
-
(1994)
Mfg Engng
, vol.111
, Issue.6
, pp. 176
-
-
Thurow, L.1
-
15
-
-
0003898058
-
-
Operations Management Association, Monograph 2
-
Swamidass, P. M. Manufacturing flexibility. Operations Management Association, Monograph 2, 1988.
-
(1988)
Manufacturing Flexibility
-
-
Swamidass, P.M.1
-
17
-
-
21144479287
-
Dealing with the uncertainties of manufacturing: Flexibility, buffers and integration
-
Newman, W., Hanna, M. and Maffei, M. Dealing with the uncertainties of manufacturing: flexibility, buffers and integration. Int. J. Ops and Prod. Manag., 1993, 13(1), 19-34.
-
(1993)
Int. J. Ops and Prod. Manag.
, vol.13
, Issue.1
, pp. 19-34
-
-
Newman, W.1
Hanna, M.2
Maffei, M.3
-
18
-
-
0002759108
-
Manufacturing systems flexibility - An assessment procedure
-
Slack, N. Manufacturing systems flexibility - an assessment procedure. Computer-Integrated Mfg Systems, 1988, 1(1), 25-31.
-
(1988)
Computer-Integrated Mfg Systems
, vol.1
, Issue.1
, pp. 25-31
-
-
Slack, N.1
-
20
-
-
0003020130
-
Flexibility - A manufacturing conundrum
-
Hill, T. and Chambers, S. Flexibility - a manufacturing conundrum. Int. J. Ops and Prod. Manag., 1991, 11(2), 5-13.
-
(1991)
Int. J. Ops and Prod. Manag.
, vol.11
, Issue.2
, pp. 5-13
-
-
Hill, T.1
Chambers, S.2
-
22
-
-
2742566136
-
An overall methodology for set-up reduction (SUR) within existing manufacturing systems
-
University of Bath
-
McIntosh, R., Culley, S. J., Gest, G. and Mileham, A. R. An overall methodology for set-up reduction (SUR) within existing manufacturing systems. Proceedings of Ninth NCMR Conference, University of Bath, 1993.
-
(1993)
Proceedings of Ninth NCMR Conference
-
-
McIntosh, R.1
Culley, S.J.2
Gest, G.3
Mileham, A.R.4
-
25
-
-
0023401969
-
Any machine setup time can be reduced by 75%
-
Hay, E. J. Any machine setup time can be reduced by 75%. Ind. Engng, 1987, 19(8), 62-67.
-
(1987)
Ind. Engng
, vol.19
, Issue.8
, pp. 62-67
-
-
Hay, E.J.1
-
27
-
-
0011764898
-
Reducing your changeover times
-
Birmingham
-
Mather, H. Reducing your changeover times. IMechE Seminar, Birmingham, 1992.
-
(1992)
IMechE Seminar
-
-
Mather, H.1
-
29
-
-
3543146682
-
Classifying and selecting set-up reduction techniques
-
University of Bath
-
Gest, G., Culley, S. J., McIntosh, R. and Mileham, A. R. Classifying and selecting set-up reduction techniques. Proceedings of Ninth NCMR Conference, University of Bath, 1993.
-
(1993)
Proceedings of Ninth NCMR Conference
-
-
Gest, G.1
Culley, S.J.2
McIntosh, R.3
Mileham, A.R.4
-
30
-
-
85033538098
-
-
Rover Group Limited, Triaxis Press (Promotional Publication), Swindon, 1991
-
Rover Group Limited, Triaxis Press (Promotional Publication), Swindon, 1991.
-
-
-
-
31
-
-
0012503965
-
Rule based approach to just-in-time manufacturing
-
Pegler, H. C. and Kochhar, A. K. Rule based approach to just-in-time manufacturing. Computer-Integrated Mfg Systems, 1990, 3(1), 11-18.
-
(1990)
Computer-Integrated Mfg Systems
, vol.3
, Issue.1
, pp. 11-18
-
-
Pegler, H.C.1
Kochhar, A.K.2
-
32
-
-
0025657214
-
Synchronised manufacturing as in OPT: From practice to theory
-
Ronen, B. and Starr, M. K. Synchronised manufacturing as in OPT: from practice to theory. Computers and Ind. Engng, 1990, 18(4), 585-600.
-
(1990)
Computers and Ind. Engng
, vol.18
, Issue.4
, pp. 585-600
-
-
Ronen, B.1
Starr, M.K.2
-
33
-
-
0009316105
-
Visualising improvement
-
Cullen, J. Visualising improvement. TQM Mag., 1993, 5(4), 33-38.
-
(1993)
TQM Mag.
, vol.5
, Issue.4
, pp. 33-38
-
-
Cullen, J.1
-
35
-
-
0000664204
-
Performance measuring systems and time-based manufacturing
-
Fry, T., Karwan, K. and Baker, W. Performance measuring systems and time-based manufacturing. Prod. Planning and Control, 1993, 2, 102-111.
-
(1993)
Prod. Planning and Control
, vol.2
, pp. 102-111
-
-
Fry, T.1
Karwan, K.2
Baker, W.3
-
36
-
-
0028409945
-
Manufacturing strategy, performance indicators and improvement programmes
-
Geiders, L., Mannaerts, P. and Maes, J. Manufacturing strategy, performance indicators and improvement programmes. Int. J. Prod. Res., 1994, 32(4), 797-805.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.4
, pp. 797-805
-
-
Geiders, L.1
Mannaerts, P.2
Maes, J.3
|