메뉴 건너뛰기




Volumn 4, Issue , 1997, Pages 220-229

Interactive scheduling agent on the Internet

Author keywords

[No Author keywords available]

Indexed keywords

INTERACTIVE COMPUTER SYSTEMS; MANAGEMENT INFORMATION SYSTEMS; SCHEDULING; WIDE AREA NETWORKS;

EID: 0031385681     PISSN: 10603425     EISSN: None     Source Type: None    
DOI: 10.1109/HICSS.1997.663392     Document Type: Conference Paper
Times cited : (14)

References (24)
  • 1
    • 0026137120 scopus 로고
    • A survey of constraint based scheduling systems using an artificial intelligence approach
    • H. Atabakhsh A survey of constraint based scheduling systems using an artificial intelligence approach AI in Engineering 16 1991
    • (1991) AI in Engineering , vol.16
    • Atabakhsh, H.1
  • 2
    • 85176666515 scopus 로고
    • Operations research and artificial intelligence cooperation to solve scheduling problems: the OPAL and OSCAR systems
    • C. Badie G. Bel E. Basana G. Verfaillie Operations research and artificial intelligence cooperation to solve scheduling problems: the OPAL and OSCAR systems Proceedings of International Conference on Expert Planning Systems Proceedings of International Conference on Expert Planning Systems Brighton United Kindom 1990
    • (1990)
    • Badie, C.1    Bel, G.2    Basana, E.3    Verfaillie, G.4
  • 3
    • 0004048738 scopus 로고
    • Scheduling in Computer and Manufacturing Systems
    • Springer-Verlag Germany, Berlin, Heideberg
    • J. B Blazewicz K. H. Ecker G. Schmidt J. Weglarz Scheduling in Computer and Manufacturing Systems 1994 Springer-Verlag Germany, Berlin, Heideberg
    • (1994)
    • Blazewicz, J.B1    Ecker, K.H.2    Schmidt, G.3    Weglarz, J.4
  • 4
    • 84892234661 scopus 로고
    • The management of job-shop scheduling constraints in TOSCA
    • H. Beck The management of job-shop scheduling constraints in TOSCA Proceedings of NSF Workshop on Intelligent and Dynamic Scheduling for Manufacturing Systems 2 14 Proceedings of NSF Workshop on Intelligent and Dynamic Scheduling for Manufacturing Systems 1993
    • (1993) , pp. 2-14
    • Beck, H.1
  • 5
    • 0003434834 scopus 로고
    • Object-Oriented Analysis and Design with Application
    • 2nd Benjamin Cummings California, Redwood City
    • G. Booch Object-Oriented Analysis and Design with Application 2nd 1994 Benjamin Cummings California, Redwood City
    • (1994)
    • Booch, G.1
  • 6
    • 0003347730 scopus 로고
    • Intelligent Scheduling Systems
    • Kluwer Academic Massachusetts, Boston
    • R. E. Brown W. T. Scherer Intelligent Scheduling Systems 1995 Kluwer Academic Massachusetts, Boston
    • (1995)
    • Brown, R.E.1    Scherer, W.T.2
  • 8
    • 0003768868 scopus 로고
    • Intelligent Scheduling
    • DART: Applying knowledge based planning and scheduling to crisis action planning Morgan Kaufmann California, San Francisco
    • S. E. Cross E. Walker Intelligent Scheduling 1994 Morgan Kaufmann California, San Francisco DART: Applying knowledge based planning and scheduling to crisis action planning
    • (1994)
    • Cross, S.E.1    Walker, E.2
  • 9
    • 84982522109 scopus 로고
    • ISIS -- a knowledge-based system for factory scheduling
    • M. S. Fox S. F. Smith ISIS--a knowledge-based system for factory scheduling Expert Systems 1 25 49 1984
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 10
    • 0003768868 scopus 로고
    • Intelligent Scheduling
    • ReDS: A real time production scheduling system from conception to practice Morgan Kaufmann California, San Francisco
    • K. C. Hadavi Intelligent Scheduling 1994 Morgan Kaufmann California, San Francisco ReDS: A real time production scheduling system from conception to practice
    • (1994)
    • Hadavi, K.C.1
  • 12
    • 0003768868 scopus 로고
    • Intelligent Scheduling
    • SPIKE: Intelligent, scheduling of hubble space telescope observations Morgan Kaufmann California, San Francisco
    • M. S. Johnston G. E. Miller Intelligent Scheduling 1994 Morgan Kaufmann California, San Francisco SPIKE: Intelligent, scheduling of hubble space telescope observations
    • (1994)
    • Johnston, M.S.1    Miller, G.E.2
  • 13
    • 0024108771 scopus 로고
    • The three-dimensional Gantt chart
    • C. V. Jones The three-dimensional Gantt chart Operations Research 36 6 891 903 1988
    • (1988) Operations Research , vol.36 , Issue.6 , pp. 891-903
    • Jones, C.V.1
  • 14
    • 85176689900 scopus 로고
    • Management
    • Heuristic Scheduling Systems: with Application to Production Systems and Project Wiley New York, New York
    • T. E. Morton D. W. Pentico Management 1993 Wiley New York, New York Heuristic Scheduling Systems: with Application to Production Systems and Project
    • (1993)
    • Morton, T.E.1    Pentico, D.W.2
  • 15
    • 85176682441 scopus 로고    scopus 로고
    • Annals of Operations Research, Special Volume on Scheduling: Theory and Application
    • On the Development of Object-Oriented Scheduling Systems
    • M. Pinedo B. P. Yen Annals of Operations Research, Special Volume on Scheduling: Theory and Application 1996 On the Development of Object-Oriented Scheduling Systems
    • (1996)
    • Pinedo, M.1    Yen, B.P.2
  • 16
    • 0003438602 scopus 로고
    • Scheduling: Theory, Algorithms and Systems
    • Prentice-Hall New Jersey, Englewood Cliffs
    • M. Pinedo Scheduling: Theory, Algorithms and Systems 1995 Prentice-Hall New Jersey, Englewood Cliffs
    • (1995)
    • Pinedo, M.1
  • 17
    • 0042155737 scopus 로고
    • Control and Dynamic Systems
    • Design issues with regard to scheduling in manufacturing Academic Press California, San Diego
    • M. Pinedo R. Samroengraja B. P.-C. Yen Control and Dynamic Systems 60 203 238 1994 Academic Press California, San Diego Design issues with regard to scheduling in manufacturing
    • (1994) , vol.60 , pp. 203-238
    • Pinedo, M.1    Samroengraja, R.2    Yen, B.P.-C.3
  • 19
    • 0003486463 scopus 로고
    • Design the User Interface: Strategies for Effective Human Computer Interaction
    • 2nd Addison-Wesley Massachusetts, Reading
    • B. Shneiderman Design the User Interface: Strategies for Effective Human Computer Interaction 2nd 1992 Addison-Wesley Massachusetts, Reading
    • (1992)
    • Shneiderman, B.1
  • 20
    • 0003768868 scopus 로고
    • Intelligent Scheduling
    • OPIS: A methodology and architecture for reactive scheduling Morgan Kaufmann California, San Francisco
    • S. Smith Intelligent Scheduling 1994 Morgan Kaufmann California, San Francisco OPIS: A methodology and architecture for reactive scheduling
    • (1994)
    • Smith, S.1
  • 21
    • 0026936702 scopus 로고
    • Knowledge-based production management: Approaches, results and prospects
    • S. F. Smith Knowledge-based production management: Approaches, results and prospects Production Planning and Control 3 350 380 1992
    • (1992) Production Planning and Control , vol.3 , pp. 350-380
    • Smith, S.F.1
  • 22
    • 84892284716 scopus 로고
    • Knowledge-Based Reactive Scheduling
    • Configurable systems for reactive production management Elsevier Science B.V. NorthHolland
    • S. F. Smith O. Lassila Knowledge-Based Reactive Scheduling 93 106 1994 Elsevier Science B.V. NorthHolland Configurable systems for reactive production management
    • (1994) , pp. 93-106
    • Smith, S.F.1    Lassila, O.2
  • 23
    • 84892195235 scopus 로고
    • Hypertext-based design of a user interface for scheduling
    • I. W. Woerner E. Biefeld Hypertext-based design of a user interface for scheduling Proceedings of the AIAA Computing in Aerospace 9 Proceedings of the AIAA Computing in Aerospace 1994
    • (1994) , vol.9
    • Woerner, I.W.1    Biefeld, E.2
  • 24
    • 85176686165 scopus 로고    scopus 로고


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.