1
-
-
0028698198
-
Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
-
Cetinkaya, F.C., "Lot streaming in a two-stage flow shop with set-up, processing and removal times separated," J. of Operational Research Society, Vol. 45, No. 12, pp. 1445-1455, 1994.
-
(1994)
J. of Operational Research Society
, vol.45
, Issue.12
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
2
-
-
0029426050
-
Future direction in manufacturing research
-
Nashville, Tennessee, U.S.A.
-
Egbelu, P.J., B.O. Nnaji, R. Sadowski, R. A. Wysk and K. B. Zandin, "Future direction in manufacturing research," Industrial Engineering Research Conference Proceedings, Nashville, Tennessee, U.S.A., pp. 10-18, 1995.
-
(1995)
Industrial Engineering Research Conference Proceedings
, pp. 10-18
-
-
Egbelu, P.J.1
Nnaji, B.O.2
Sadowski, R.3
Wysk, R.A.4
Zandin, K.B.5
-
3
-
-
38249040429
-
Overapping operations in material requirement planning
-
Graves, S.C. and M.M. Kostreva, "Overapping Operations in Material Requirement Planning," J. of Operations Management, Vol. 6, No. 3, pp. 283-294, 1986.
-
(1986)
J. of Operations Management
, vol.6
, Issue.3
, pp. 283-294
-
-
Graves, S.C.1
Kostreva, M.M.2
-
4
-
-
0041528088
-
An improved scheduling heuristic based on batch splitting method for the job shop scheduling problem
-
Jeong, H.I. and J.W. Park," An Improved Scheduling Heuristic Based on Batch Splitting Method for The Job Shop Scheduling Problem," Working paper SNU-IE-FAL-96-11, 1996.
-
(1996)
Working Paper SNU-IE-FAL-96-11
-
-
Jeong, H.I.1
Park, J.W.2
-
5
-
-
0001663057
-
Impact of family-based scheduling on transfer batches in a job shop manufacturing cell
-
Kannan, V.R. and S.B. Lyman, "Impact of family-based scheduling on transfer batches in a job shop manufacturing cell," Int. J. of Production Research, Vol. 32, No. 12, pp. 2777-2794, 1994.
-
(1994)
Int. J. of Production Research
, vol.32
, Issue.12
, pp. 2777-2794
-
-
Kannan, V.R.1
Lyman, S.B.2
-
6
-
-
0022128589
-
Lotsizing in multi-item multi-machine job shops
-
Karmarkar, U.S., S. Kekre and S. Kekre, "Lotsizing in multi-item multi-machine job shops," IIE Transactions, Vol. 17, No. 3, pp. 290-297, 1985.
-
(1985)
IIE Transactions
, vol.17
, Issue.3
, pp. 290-297
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
7
-
-
84985755271
-
Optimal and heuristic lot splitting in a flow shop
-
Kropp, D.H. and T.L. Smunt, "Optimal and heuristic lot splitting in a flow shop," Decision Science, Vol. 20, No. 4, pp. 691-709, 1990.
-
(1990)
Decision Science
, vol.20
, Issue.4
, pp. 691-709
-
-
Kropp, D.H.1
Smunt, T.L.2
-
8
-
-
0022516278
-
Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems
-
Moily, J.P., "Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems," Management Science, Vol. 32, No. 1, pp. 113-125, 1986.
-
(1986)
Management Science
, vol.32
, Issue.1
, pp. 113-125
-
-
Moily, J.P.1
-
9
-
-
0000358905
-
A simulation study on performance improvement of group technology cells
-
Sassni, F., "A simulation study on performance improvement of group technology cells," Int. J. of Production Research, Vol. 28, No. 2, pp. 293-300, 1990.
-
(1990)
Int. J. of Production Research
, vol.28
, Issue.2
, pp. 293-300
-
-
Sassni, F.1
-
10
-
-
0028526352
-
The impact of lot splitting on due date performance
-
Wagner, B.J. and G.L. Ragatz, "The impact of lot splitting on due date performance," J. of Operations Management, Vol. 12, pp. 13-25, 1994.
-
(1994)
J. of Operations Management
, vol.12
, pp. 13-25
-
-
Wagner, B.J.1
Ragatz, G.L.2
|