메뉴 건너뛰기




Volumn 33, Issue 3-4, 1997, Pages 781-784

A batch splitting heuristic for dynamic job shop scheduling problem

Author keywords

Batch splitting; Dynamic events

Indexed keywords

ALGORITHMS; FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC METHODS; PRODUCTION CONTROL;

EID: 0031380485     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(97)00252-0     Document Type: Article
Times cited : (11)

References (10)
  • 1
    • 0028698198 scopus 로고
    • Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
    • Cetinkaya, F.C., "Lot streaming in a two-stage flow shop with set-up, processing and removal times separated," J. of Operational Research Society, Vol. 45, No. 12, pp. 1445-1455, 1994.
    • (1994) J. of Operational Research Society , vol.45 , Issue.12 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 3
    • 38249040429 scopus 로고
    • Overapping operations in material requirement planning
    • Graves, S.C. and M.M. Kostreva, "Overapping Operations in Material Requirement Planning," J. of Operations Management, Vol. 6, No. 3, pp. 283-294, 1986.
    • (1986) J. of Operations Management , vol.6 , Issue.3 , pp. 283-294
    • Graves, S.C.1    Kostreva, M.M.2
  • 4
    • 0041528088 scopus 로고    scopus 로고
    • An improved scheduling heuristic based on batch splitting method for the job shop scheduling problem
    • Jeong, H.I. and J.W. Park," An Improved Scheduling Heuristic Based on Batch Splitting Method for The Job Shop Scheduling Problem," Working paper SNU-IE-FAL-96-11, 1996.
    • (1996) Working Paper SNU-IE-FAL-96-11
    • Jeong, H.I.1    Park, J.W.2
  • 5
    • 0001663057 scopus 로고
    • Impact of family-based scheduling on transfer batches in a job shop manufacturing cell
    • Kannan, V.R. and S.B. Lyman, "Impact of family-based scheduling on transfer batches in a job shop manufacturing cell," Int. J. of Production Research, Vol. 32, No. 12, pp. 2777-2794, 1994.
    • (1994) Int. J. of Production Research , vol.32 , Issue.12 , pp. 2777-2794
    • Kannan, V.R.1    Lyman, S.B.2
  • 6
    • 0022128589 scopus 로고
    • Lotsizing in multi-item multi-machine job shops
    • Karmarkar, U.S., S. Kekre and S. Kekre, "Lotsizing in multi-item multi-machine job shops," IIE Transactions, Vol. 17, No. 3, pp. 290-297, 1985.
    • (1985) IIE Transactions , vol.17 , Issue.3 , pp. 290-297
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3
  • 7
    • 84985755271 scopus 로고
    • Optimal and heuristic lot splitting in a flow shop
    • Kropp, D.H. and T.L. Smunt, "Optimal and heuristic lot splitting in a flow shop," Decision Science, Vol. 20, No. 4, pp. 691-709, 1990.
    • (1990) Decision Science , vol.20 , Issue.4 , pp. 691-709
    • Kropp, D.H.1    Smunt, T.L.2
  • 8
    • 0022516278 scopus 로고
    • Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems
    • Moily, J.P., "Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems," Management Science, Vol. 32, No. 1, pp. 113-125, 1986.
    • (1986) Management Science , vol.32 , Issue.1 , pp. 113-125
    • Moily, J.P.1
  • 9
    • 0000358905 scopus 로고
    • A simulation study on performance improvement of group technology cells
    • Sassni, F., "A simulation study on performance improvement of group technology cells," Int. J. of Production Research, Vol. 28, No. 2, pp. 293-300, 1990.
    • (1990) Int. J. of Production Research , vol.28 , Issue.2 , pp. 293-300
    • Sassni, F.1
  • 10
    • 0028526352 scopus 로고
    • The impact of lot splitting on due date performance
    • Wagner, B.J. and G.L. Ragatz, "The impact of lot splitting on due date performance," J. of Operations Management, Vol. 12, pp. 13-25, 1994.
    • (1994) J. of Operations Management , vol.12 , pp. 13-25
    • Wagner, B.J.1    Ragatz, G.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.