|
Volumn , Issue , 1997, Pages 186-191
|
Parallel machine scheduling for minimizing the makespan and the average flow-time
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPUTATIONAL COMPLEXITY;
COMPUTER SIMULATION;
DECISION MAKING;
HEURISTIC METHODS;
OPTIMIZATION;
PROBLEM SOLVING;
PROCESS CONTROL;
RANDOM PROCESSES;
SCHEDULING;
AVERAGE FLOW TIME;
MULTICRITERIA IDENTICAL PARALLEL MACHINE PROBLEM;
PSEUDO RANDOM SCHEDULE GENERATOR;
PRODUCTION CONTROL;
|
EID: 0031368174
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (1)
|
References (8)
|