|
Volumn 4, Issue 5, 1997, Pages 51-54
|
Challenges in the design and construction of Jiangya dam
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ABUTMENTS (BRIDGE);
CONSTRUCTION;
FLOOD CONTROL;
FLOODS;
HYDRAULIC GATES;
SPILLWAY GATES;
FLOOD DISCHARGE FACILITIES;
JIANGYA DAM;
ARCH DAMS;
|
EID: 0031360737
PISSN: 13522523
EISSN: None
Source Type: Journal
DOI: None Document Type: Article |
Times cited : (1)
|
References (0)
|