|
Volumn , Issue , 1997, Pages 739-743
|
Simulation of a new product workcell
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ELECTRIC SWITCHGEAR;
MANUFACTURE;
OPTIMIZATION;
PLANT LAYOUT;
PRODUCTION ENGINEERING;
PRODUCT WORKCELLS;
THROUGHPUT TARGETS;
COMPUTER SIMULATION;
|
EID: 0031359634
PISSN: 02750708
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1145/268437.268617 Document Type: Conference Paper |
Times cited : (8)
|
References (3)
|