-
1
-
-
0028727415
-
Practical Production Scheduling with Capacity Constraints and Dynamic Demand: Family Planning and Disaggregation
-
Allen, S. J., and E. W. Schuster. "Practical Production Scheduling with Capacity Constraints and Dynamic Demand: Family Planning and Disaggregation." Production and Inventory Management Journal 35, no. 4 (1994): 15-21.
-
(1994)
Production and Inventory Management Journal
, vol.35
, Issue.4
, pp. 15-21
-
-
Allen, S.J.1
Schuster, E.W.2
-
2
-
-
33749286452
-
A Heuristic Solution Procedure for the Multi-Item, Single-Level, Limited Capacity, Lot-Sizing Problem
-
October
-
Dixon, P. S., and E. A. Silver. "A Heuristic Solution Procedure for the Multi-Item, Single-Level, Limited Capacity, Lot-Sizing Problem." Journal of Operations Management 2, no. 1 (October 1981): 23-39.
-
(1981)
Journal of Operations Management
, vol.2
, Issue.1
, pp. 23-39
-
-
Dixon, P.S.1
Silver, E.A.2
-
3
-
-
0022697657
-
A Simple Heuristic for the Multi-Item Single-Level Capacitated Lot-Sizing Problem
-
April
-
Maes, J., and L. N. Van Wassenhove. "A Simple Heuristic for the Multi-Item Single-Level Capacitated Lot-Sizing Problem." Operational Research Letters 4, no. 6 (April 1986): 265-273.
-
(1986)
Operational Research Letters
, vol.4
, Issue.6
, pp. 265-273
-
-
Maes, J.1
Van Wassenhove, L.N.2
-
4
-
-
84974870384
-
Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review
-
_. "Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review." Journal of Operational Research Society 39, no. 11 (1988): 991-1004.
-
(1988)
Journal of Operational Research Society
, vol.39
, Issue.11
, pp. 991-1004
-
-
-
5
-
-
0002657699
-
A Heuristic for Selecting Lot-Size Quantities for the Case of a Deterministic Time-Varying Demand Rate and Discrete Opportunities for Replenishment
-
Silver, E. A., and H. Meal. "A Heuristic for Selecting Lot-Size Quantities for the Case of a Deterministic Time-Varying Demand Rate and Discrete Opportunities for Replenishment." Production and Inventory Management Journal 12, no. 2 (1973): 64-74.
-
(1973)
Production and Inventory Management Journal
, vol.12
, Issue.2
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.2
-
6
-
-
0025246522
-
A Deterministic Spreadsheet Simulation Model for Production Scheduling in a Lumpy Demand Environment
-
Schuster, E. W., and B. J. Finch. "A Deterministic Spreadsheet Simulation Model for Production Scheduling in a Lumpy Demand Environment." Production and Inventory Management Journal 31, no. 1 (1990): 39-42.
-
(1990)
Production and Inventory Management Journal
, vol.31
, Issue.1
, pp. 39-42
-
-
Schuster, E.W.1
Finch, B.J.2
-
7
-
-
0000555407
-
Capacitated Lot Sizing with Setup Times
-
March
-
Trigiero, W. M., L. J. Thomas, and J. O. McClain. "Capacitated Lot Sizing with Setup Times." Management Science 35, no. 3 (March 1989): 353-366.
-
(1989)
Management Science
, vol.35
, Issue.3
, pp. 353-366
-
-
Trigiero, W.M.1
Thomas, L.J.2
McClain, J.O.3
|