-
3
-
-
0003904789
-
-
(Prentice Hall, Englewood Cliffs, NJ)
-
Cooper, R., and Kaplan, R., 1991, The Design of Cost management Systems (Prentice Hall, Englewood Cliffs, NJ).
-
(1991)
The Design of Cost Management Systems
-
-
Cooper, R.1
Kaplan, R.2
-
4
-
-
84889544317
-
Extending structured analysis modelling with A.I.: An application to MRPII profiles and SFC data communications requirements specifications
-
November 1989
-
Feller, A., and Rucker, R., 1989, Extending structured analysis modelling with A.I.: an application to MRPII profiles and SFC data communications requirements specifications. IfIPS Conference Paper, November 1989.
-
(1989)
Ifips Conference Paper
-
-
Feller, A.1
Rucker, R.2
-
5
-
-
0002657021
-
Implementing target costing
-
Summer
-
Fisher, J., 1995, Implementing target costing. Journal of Cost management, Summer, 50-59.
-
(1995)
Journal of Cost Management
, pp. 50-59
-
-
Fisher, J.1
-
6
-
-
0043025059
-
Gaining competitive advantage by using simultaneous engineering to integrate your engineering design, and manufacturing resources
-
October 1989
-
Foreman, J.W., 1989, Gaining competitive advantage by using simultaneous engineering to integrate your engineering design, and manufacturing resources. CASA/SME AUTOFACT’89 Conference, October 1989.
-
(1989)
CASA/SME AUTOFACT’89 Conference
-
-
Foreman, J.W.1
-
8
-
-
84889507915
-
Approche méthodique pour l’élaboration de modèles de simulation
-
Lenclud, T., and Tahon, C., 1995, Approche méthodique pour l’élaboration de modèles de simulation. Revue d’Automatique et de Productique Appliquées, 8, pp. 19-43.
-
(1995)
Revue d’Automatique Et De Productique Appliquées
, vol.8
, pp. 19-43
-
-
Lenclud, T.1
Tahon, C.2
-
11
-
-
0042524070
-
Lessons from the ABM battlefield: Developing the pilot
-
Summer
-
Player, R. S., and Keys, D. E., 1995, Lessons from the ABM battlefield: developing the pilot. Journal of Cost Management, Summer, 20-35.
-
(1995)
Journal of Cost Management
, pp. 20-35
-
-
Player, R.S.1
Keys, D.E.2
-
13
-
-
0041522283
-
A Japanese survey of factory automation and its impact on management control systems
-
(by Monden Yasuhiro and Sakurai Michiharu (Productivity Press, Cambridge, MA)
-
Sakurai, M., and Huang, P. Y., 1989, A Japanese survey of factory automation and its impact on management control systems. In Japanese Management Accounting edited by Monden Yasuhiro and Sakurai Michiharu (Productivity Press, Cambridge, MA).
-
(1989)
Japanese Management Accounting
-
-
Sakurai, M.1
Huang, P.Y.2
-
14
-
-
84889531335
-
Production costs identification using value engineering and simulation in a concurrent engineering process
-
Valenciennes, France, May 1994
-
Sénéchal, O., Lenclud, T., and Tahon, C., 1994, Production costs identification using value engineering and simulation in a concurrent engineering process. IF IP International Conference ‘Feature Modelling and Recognition in Advanced CAD /CAM Systems’, Valenciennes, France, May 1994.
-
(1994)
IF IP International Conference ‘Feature Modelling and Recognition in Advanced CAD /CAM Systems’
-
-
Sénéchal, O.1
Lenclud, T.2
Tahon, C.3
-
15
-
-
84889552604
-
Engineering tools integration and simulation for mastering design risks by concurrent engineering
-
Singapore, July 1995
-
Sénéchal, O., and TAHON, C., 1995, Engineering tools integration and simulation for mastering design risks by concurrent engineering. 3rd International Conference on Computer Integrated Manufacturing (ICCIM’95), Autofact Asia, Singapore, July 1995.
-
(1995)
3Rd International Conference on Computer Integrated Manufacturing (ICCIM’95), Autofact Asia
-
-
Sénéchal, O.1
Tahon, C.2
-
16
-
-
0010266162
-
A methodology for integrating economic criteria in design and production decisions
-
Innsbruck, Austria, February
-
Sénéchal, O., and TAHON, C., 1996, A methodology for integrating economic criteria in design and production decisions. Ninth International Working Seminar on Production Economics, Innsbruck, Austria, February, pp. 19-23.
-
(1996)
Ninth International Working Seminar on Production Economics
, pp. 19-23
-
-
Sénéchal, O.1
Tahon, C.2
-
17
-
-
85011133301
-
Proposition d’une methodologie pour l’aide à l’estimation des performances physico-économiques des systèmes de production dans une approche concourante
-
27 Février 1996
-
Sénéchal, O., 1996, Proposition d’une methodologie pour l’aide à l’estimation des performances physico-économiques des systèmes de production dans une approche concourante. Thèse de D octorat, LGIL, Université de Valenciennes, 27 Février 1996.
-
(1996)
Thèse De D Octorat, LGIL, Université De Valenciennes
-
-
Sénéchal, O.1
|