|
Volumn 34, Issue 2, 1997, Pages 239-245
|
Planning systems in the next century (II)
|
Author keywords
CIM; Distributed systems; Scheduling
|
Indexed keywords
COMPUTER INTEGRATED MANUFACTURING;
COMPUTER SIMULATION;
DISTRIBUTED PARAMETER CONTROL SYSTEMS;
HIERARCHICAL SYSTEMS;
INFORMATION TECHNOLOGY;
MAINTENANCE;
PLANNING;
PRODUCTION CONTROL;
REDUNDANCY;
SCHEDULING;
PLAN EXECUTION;
PLANNING SYSTEMS;
SHOP FLOOR CONTROL;
SYSTEMS ANALYSIS;
|
EID: 0031276629
PISSN: 01663615
EISSN: None
Source Type: Journal
DOI: 10.1016/s0166-3615(97)00059-6 Document Type: Article |
Times cited : (7)
|
References (8)
|