메뉴 건너뛰기




Volumn 17, Issue 11-12, 1997, Pages 649-666

An examination of the literature relating to issues affecting the human variable in just-in-time environments

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL MANAGEMENT; PERSONNEL; PERSONNEL TRAINING; SOCIETIES AND INSTITUTIONS; STRATEGIC PLANNING;

EID: 0031272489     PISSN: 01664972     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0166-4972(97)00071-0     Document Type: Article
Times cited : (15)

References (106)
  • 1
    • 0001972713 scopus 로고
    • Time and motion regained
    • Adler, P. S. (1993) Time and motion regained. Harvard Business Review 71, 97-108.
    • (1993) Harvard Business Review , vol.71 , pp. 97-108
    • Adler, P.S.1
  • 3
    • 0026141525 scopus 로고
    • A comparative study of US manufacturing firms at various stages of just-in-time implementation
    • Ahmed, N. V., Tunc, E. A. and Montagno, R. V. (1991) A comparative study of US manufacturing firms at various stages of just-in-time implementation. International Journal of Production Research 29, 787-802.
    • (1991) International Journal of Production Research , vol.29 , pp. 787-802
    • Ahmed, N.V.1    Tunc, E.A.2    Montagno, R.V.3
  • 5
    • 0041553438 scopus 로고
    • Unipartners
    • 11 April
    • Anon. (1992) Unipartners. The Economist, 11 April (reprinted in APICS Victoria Chapter Magazine, August 1992, pp. 7, 10).
    • (1992) The Economist
  • 6
    • 0041553436 scopus 로고    scopus 로고
    • reprinted August 1992
    • Anon. (1992) Unipartners. The Economist, 11 April (reprinted in APICS Victoria Chapter Magazine, August 1992, pp. 7, 10).
    • APICS Victoria Chapter Magazine , pp. 7
  • 7
    • 0041553443 scopus 로고
    • Identifying factors critical to success in implementing just-in-time technique
    • Ansari, A. (1986) Identifying factors critical to success in implementing just-in-time technique. Industrial Engineering 18, 44-52.
    • (1986) Industrial Engineering , vol.18 , pp. 44-52
    • Ansari, A.1
  • 8
    • 3543097362 scopus 로고
    • Leading the way: A study of best manufacturing practices in Australia and New Zealand
    • Australian Manufacturing Council (1994) Leading the way: a study of best manufacturing practices in Australia and New Zealand. In: AMC Survey Data, 1994, 2nd edition.
    • (1994) AMC Survey Data, 1994, 2nd Edition
  • 11
    • 0041895442 scopus 로고
    • Misconceptions abound concerning just-in-time operating philosophy
    • September
    • Bockerstette, J.A. (1988) Misconceptions abound concerning just-in-time operating philosophy. Industrial Engineering (September), 54-58.
    • (1988) Industrial Engineering , pp. 54-58
    • Bockerstette, J.A.1
  • 12
    • 0001429020 scopus 로고
    • A comparison of just-in-time and batch manufacturing: The role of performance obstacles
    • Brown, K. A. and Mitchell, T. R. (1991) A comparison of just-in-time and batch manufacturing: the role of performance obstacles. Academy of Management Journal 34, 906-917.
    • (1991) Academy of Management Journal , vol.34 , pp. 906-917
    • Brown, K.A.1    Mitchell, T.R.2
  • 13
    • 0041553441 scopus 로고
    • Flexible work practices at the core of ICI success
    • August
    • Buxton, R. (1995) Flexible work practices at the core of ICI success. Benchmark 12 (August), 18-19.
    • (1995) Benchmark , vol.12 , pp. 18-19
    • Buxton, R.1
  • 15
    • 0042555574 scopus 로고
    • Implementing JIT with employee involvement: What works?
    • Connell, G. W. (1990) Implementing JIT with employee involvement: what works? In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings), APICS Inc., pp. 59-62.
    • (1990) CPIM Just-in-time Reprints
    • Connell, G.W.1
  • 16
    • 0042555575 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Connell, G. W. (1990) Implementing JIT with employee involvement: what works? In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings), APICS Inc., pp. 59-62.
    • 1990 APICS Conference Proceedings , pp. 59-62
  • 17
    • 0038706152 scopus 로고
    • Designing performance measurement systems for just-in-time operations
    • Crawford, K. M. and Cox, J. F. (1990) Designing performance measurement systems for just-in-time operations. International Journal of Production Research 28, 2025-2036.
    • (1990) International Journal of Production Research , vol.28 , pp. 2025-2036
    • Crawford, K.M.1    Cox, J.F.2
  • 19
    • 84950762252 scopus 로고
    • Pushing back the frontiers: Management control and work intensification under JIT/TQM factory regimes
    • Delbridge, R., Turnbull, P. and Wilkinson, B. (1992) Pushing back the frontiers: management control and work intensification under JIT/TQM factory regimes. New Technology Work and Employment 7, 97-106.
    • (1992) New Technology Work and Employment , vol.7 , pp. 97-106
    • Delbridge, R.1    Turnbull, P.2    Wilkinson, B.3
  • 20
    • 0002108142 scopus 로고
    • Integrated manufacturing: Redesign the organisation before implementing flexible technology
    • Duimering, R. P., Safayeni, F. and Purdy, L. (1993) Integrated manufacturing: redesign the organisation before implementing flexible technology. Sloan Management Review 34, 47-56.
    • (1993) Sloan Management Review , vol.34 , pp. 47-56
    • Duimering, R.P.1    Safayeni, F.2    Purdy, L.3
  • 21
    • 0042054760 scopus 로고
    • The rewards of linking best practice to enterprise bargaining
    • August
    • Ferguson M. (1995) The rewards of linking best practice to enterprise bargaining. Benchmark 1 (August) 12-13.
    • (1995) Benchmark , vol.1 , pp. 12-13
    • Ferguson, M.1
  • 24
    • 0030558641 scopus 로고    scopus 로고
    • Work organisation in lean production and traditional plants: What are the differences?
    • Forza, C. (1996) Work organisation in lean production and traditional plants: what are the differences?. International Journal of Operations and Production Management 16, 42-62.
    • (1996) International Journal of Operations and Production Management , vol.16 , pp. 42-62
    • Forza, C.1
  • 26
    • 84877701632 scopus 로고
    • The state of JIT implementation and development in the USA
    • Gilbert, J. P. (1990) The state of JIT implementation and development in the USA. International Journal of Production Research 28, 1099-1109.
    • (1990) International Journal of Production Research , vol.28 , pp. 1099-1109
    • Gilbert, J.P.1
  • 32
    • 38249016089 scopus 로고
    • Just-in-time manufacturing: Implications for the management of human resources
    • Hiltrop, J. M. (1992) Just-in-time manufacturing: implications for the management of human resources. European Management Journal 10, 49-55.
    • (1992) European Management Journal , vol.10 , pp. 49-55
    • Hiltrop, J.M.1
  • 33
    • 0041553419 scopus 로고
    • Communication - The key to worker participation
    • Holland, P. (1995) Communication - The key to worker participation. Benchmark 12, 14.
    • (1995) Benchmark , vol.12 , pp. 14
    • Holland, P.1
  • 34
    • 0024628357 scopus 로고
    • An integrated model of management and employee influences on just-in-time implementation
    • Spring
    • Hopkins, S.A. (1989) An integrated model of management and employee influences on just-in-time implementation. SAM Advanced Management Journal (Spring), 15-20.
    • (1989) SAM Advanced Management Journal , pp. 15-20
    • Hopkins, S.A.1
  • 36
    • 0028431816 scopus 로고
    • How to unlock the benefits of MRPII and just-in-time
    • Jacobi, M. A. (1994) How to unlock the benefits of MRPII and just-in-time. Hospital Material Management Quarterly 15, 12-22.
    • (1994) Hospital Material Management Quarterly , vol.15 , pp. 12-22
    • Jacobi, M.A.1
  • 37
    • 84965567029 scopus 로고
    • Just-in-time, 'regimes' and reductionism
    • Jenkins, A. (1994) Just-in-time, 'regimes' and reductionism. Sociology 28, 21-30.
    • (1994) Sociology , vol.28 , pp. 21-30
    • Jenkins, A.1
  • 38
    • 3543125265 scopus 로고
    • How to create 'frontline teamwork' and the sequenced plant
    • Joy, W.J. and Joy, A.J. (1993) How to create 'frontline teamwork' and the sequenced plant. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 67-70.
    • (1993) CPIM Just-in-time Reprints
    • Joy, W.J.1    Joy, A.J.2
  • 39
    • 0043056510 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Joy, W.J. and Joy, A.J. (1993) How to create 'frontline teamwork' and the sequenced plant. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 67-70.
    • 1993 APICS International Conference Proceedings , pp. 67-70
  • 41
    • 0001777961 scopus 로고
    • Yesterday's accounting undermines production
    • Kaplan, R. S. (1984) Yesterday's accounting undermines production. Harvard Business Review 62, 95-101.
    • (1984) Harvard Business Review , vol.62 , pp. 95-101
    • Kaplan, R.S.1
  • 42
    • 84968082676 scopus 로고
    • Accounting lag: The obsolescence of cost accounting systems
    • Kaplan, R. S. (1986) Accounting lag: the obsolescence of cost accounting systems. California Management Review 28, 174-199.
    • (1986) California Management Review , vol.28 , pp. 174-199
    • Kaplan, R.S.1
  • 45
    • 0041553439 scopus 로고
    • Just-in-time and quality at the source: Implementing a performance advantage
    • Kinsey, J.W. (1990) Just-in-time and quality at the source: implementing a performance advantage. In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings). APICS Inc., pp. 37-41.
    • (1990) CPIM Just-in-time Reprints
    • Kinsey, J.W.1
  • 46
    • 0042555572 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Kinsey, J.W. (1990) Just-in-time and quality at the source: implementing a performance advantage. In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings). APICS Inc., pp. 37-41.
    • 1990 APICS Conference Proceedings , pp. 37-41
  • 47
    • 0002506422 scopus 로고
    • The human cost of manufacturing reform
    • March-April
    • Klein, J. (1989) The human cost of manufacturing reform. Harvard Business Review (March-April), 60-66.
    • (1989) Harvard Business Review , pp. 60-66
    • Klein, J.1
  • 48
    • 84973744334 scopus 로고
    • A re-examination of autonomy in the light of new manufacturing practices
    • Klein, J. (1991) A re-examination of autonomy in the light of new manufacturing practices. Human Relations 44, 21-38.
    • (1991) Human Relations , vol.44 , pp. 21-38
    • Klein, J.1
  • 49
    • 0002324201 scopus 로고
    • Leading change: Why transformation efforts fail
    • March-April
    • Kotter, J.P. (1995) Leading change: why transformation efforts fail. Harvard Business Review (March-April), 59-67.
    • (1995) Harvard Business Review , pp. 59-67
    • Kotter, J.P.1
  • 50
    • 0041553420 scopus 로고
    • Behavioural barriers to the effective implementation of the just-in-time approach in American manufacturing organisations: A case study
    • Kumar, K. and Nonis, S.A. (1990) Behavioural barriers to the effective implementation of the just-in-time approach in American manufacturing organisations: a case study. Academy of Management Proceedings, 195-198.
    • (1990) Academy of Management Proceedings , pp. 195-198
    • Kumar, K.1    Nonis, S.A.2
  • 51
    • 0042054769 scopus 로고
    • Classification of JIT techniques and their implications
    • Kuphany, L. (1995) Classification of JIT techniques and their implications. Industrial Engineering 27, 62-67.
    • (1995) Industrial Engineering , vol.27 , pp. 62-67
    • Kuphany, L.1
  • 53
    • 0041553434 scopus 로고
    • Department of Human Geography, Australian National University, Canberra, 20 pp.
    • Linge, G.J.R. (1990) Just-in-time: More or less flexible? Department of Human Geography, Australian National University, Canberra, 20 pp.
    • (1990) Just-in-time: More or Less Flexible?
    • Linge, G.J.R.1
  • 55
    • 0003678739 scopus 로고
    • Jossey Bass, San Francisco (quoted in Brown and Mitchell, 1991)
    • Majchrzak, A. (1988) The Human Side of Factory Automation. Jossey Bass, San Francisco (quoted in Brown and Mitchell, 1991).
    • (1988) The Human Side of Factory Automation
    • Majchrzak, A.1
  • 57
    • 0043056496 scopus 로고
    • Building the innovative organisation
    • August
    • Mathews, J. (1995) Building the innovative organisation. Benchmark 12 (August), 8-9.
    • (1995) Benchmark , vol.12 , pp. 8-9
    • Mathews, J.1
  • 58
    • 84985841654 scopus 로고
    • Determining the critical elements of just-in-time implementation
    • Mehra, S. and Inman, R. A. (1992) Determining the critical elements of just-in-time implementation. Decision Sciences 23, 160-174.
    • (1992) Decision Sciences , vol.23 , pp. 160-174
    • Mehra, S.1    Inman, R.A.2
  • 60
    • 0003449926 scopus 로고
    • Institute of Industrial Engineers, Atlanta, Georgia
    • Monden, Y. (1983) Toyota Production System. Institute of Industrial Engineers, Atlanta, Georgia.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 61
  • 62
    • 0043056495 scopus 로고
    • Committee for Economic Development of Australia, Public Information Pamphlet No. 16, April
    • Mortensen, W. (1988) The just-in-time system - A survey. Committee for Economic Development of Australia, Public Information Pamphlet No. 16, April.
    • (1988) The Just-in-time System - A Survey
    • Mortensen, W.1
  • 67
    • 84980305277 scopus 로고
    • Adopting japanese-style manufacturing methods: A tale of two (UK) factories
    • September
    • Oliver, N. and Davies, A. (1990) Adopting Japanese-style manufacturing methods: a tale of two (UK) factories. Journal of Management Studies (September), 555-570.
    • (1990) Journal of Management Studies , pp. 555-570
    • Oliver, N.1    Davies, A.2
  • 68
    • 0027906723 scopus 로고
    • Acme manufacturing: A case study in JIT implementation
    • Payne, T. E. (1993) Acme manufacturing: a case study in JIT implementation. Production and Inventory Management Journal 34, 82-86.
    • (1993) Production and Inventory Management Journal , vol.34 , pp. 82-86
    • Payne, T.E.1
  • 69
    • 0041553418 scopus 로고
    • Just-in-time is just-a-people system
    • Perotin, S. (1987) Just-in-time is just-a-people system. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 75-78.
    • (1987) CPIM Just-in-time Reprints
    • Perotin, S.1
  • 70
    • 0041553403 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Perotin, S. (1987) Just-in-time is just-a-people system. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 75-78.
    • 1987 APICS Conference Proceedings , pp. 75-78
  • 71
    • 0027575298 scopus 로고
    • Human resource issues in manufacturing improvement initiatives; case study experiences in australia
    • Samson, D., Sohal, A. S. and Ramsay, E. (1993) Human resource issues in manufacturing improvement initiatives; case study experiences in Australia. International Journal of Human Factors in Manufacturing 3, 135-152.
    • (1993) International Journal of Human Factors in Manufacturing , vol.3 , pp. 135-152
    • Samson, D.1    Sohal, A.S.2    Ramsay, E.3
  • 74
    • 0002275726 scopus 로고
    • A behavioural case study of just-in-time implementation
    • Sefayeni, F. and Purdy, L. (1991) A behavioural case study of just-in-time implementation. Journal of Operations Management 10, 213-228.
    • (1991) Journal of Operations Management , vol.10 , pp. 213-228
    • Sefayeni, F.1    Purdy, L.2
  • 75
    • 84965409764 scopus 로고
    • Someone to watch over me: Surveillance, discipline and the just-in-time labour process
    • Sewell, G. and Wilkinson, B. (1992) Someone to watch over me: surveillance, discipline and the just-in-time labour process. Sociology 26, 271-289.
    • (1992) Sociology , vol.26 , pp. 271-289
    • Sewell, G.1    Wilkinson, B.2
  • 76
    • 0027906712 scopus 로고
    • A line stop strategy for the just-in-time/total quality control production system
    • Shin, D. and Min, H. (1993) A line stop strategy for the just-in-time/total quality control production system. Production and Inventory Management Journal 34, 43-47.
    • (1993) Production and Inventory Management Journal , vol.34 , pp. 43-47
    • Shin, D.1    Min, H.2
  • 78
    • 0002269249 scopus 로고
    • Control in an age of empowerment
    • March-April
    • Simons, R. (1995) Control in an age of empowerment. Harvard Business Review (March-April), 80-88.
    • (1995) Harvard Business Review , pp. 80-88
    • Simons, R.1
  • 79
    • 0041553417 scopus 로고
    • Just-in-time: Victorian data
    • Sohal, A. S. (1991) Just-in-time: Victorian data.. Labour and Industry 4, 41-54.
    • (1991) Labour and Industry , vol.4 , pp. 41-54
    • Sohal, A.S.1
  • 81
    • 0002966098 scopus 로고
    • Integrating CNC technology and the JIT KANBAN system: A case study
    • Sohal, A.S., Lewis, D. and Samson, D. (1993a) Integrating CNC technology and the JIT KANBAN system: a case study. International Journal of Technology Management (Special Issue on 'Manufacturing technology: diffusion, implementation and management') 8(3-5), 422-431.
    • (1993) International Journal of Technology Management
    • Sohal, A.S.1    Lewis, D.2    Samson, D.3
  • 82
    • 0042555560 scopus 로고    scopus 로고
    • Special Issue
    • Sohal, A.S., Lewis, D. and Samson, D. (1993a) Integrating CNC technology and the JIT KANBAN system: a case study. International Journal of Technology Management (Special Issue on 'Manufacturing technology: diffusion, implementation and management') 8(3-5), 422-431.
    • Manufacturing Technology: Diffusion, Implementation and Management , vol.8 , Issue.3-5 , pp. 422-431
  • 84
    • 0043056487 scopus 로고
    • Assessing and developing team effectiveness
    • Stahl, R.A. and Andersen, S.L. (1993) Assessing and developing team effectiveness. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 79-82.
    • (1993) CPIM Just-in-time Reprints
    • Stahl, R.A.1    Andersen, S.L.2
  • 85
    • 0042054757 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Stahl, R.A. and Andersen, S.L. (1993) Assessing and developing team effectiveness. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 79-82.
    • 1993 APICS International Conference Proceedings , pp. 79-82
  • 86
    • 0042054759 scopus 로고
    • Real change requires more than 'feel good' management
    • Sutton, J. (1992) Real change requires more than 'feel good' management. Industrial Engineering (July) (reprinted in APICS Victorian Chapter Magazine, January 1993, p. 9).
    • (1992) Industrial Engineering
    • Sutton, J.1
  • 87
    • 0043056490 scopus 로고    scopus 로고
    • July reprinted January 1993
    • Sutton, J. (1992) Real change requires more than 'feel good' management. Industrial Engineering (July) (reprinted in APICS Victorian Chapter Magazine, January 1993, p. 9).
    • APICS Victorian Chapter Magazine , pp. 9
  • 90
    • 0010674284 scopus 로고
    • Milwaukee electric tool
    • Taninecz, G. (1995) Milwaukee Electric Tool. Industry Week 244, 44.
    • (1995) Industry Week , vol.244 , pp. 44
    • Taninecz, G.1
  • 91
    • 0042054758 scopus 로고
    • Kaizen leads to breakthroughs in responsiveness - And the shingo prize - At Critikon
    • Tanner, C. and Roncarti, R. (1994) Kaizen leads to breakthroughs in responsiveness - and the Shingo prize - at Critikon. National Productivity Review 13, 517-531.
    • (1994) National Productivity Review , vol.13 , pp. 517-531
    • Tanner, C.1    Roncarti, R.2
  • 92
    • 0041553411 scopus 로고
    • Victorian Government Department of Industry, Technology and Resources in conjunction with the Federal Government Department of Industry, Technology and Commerce, Australia
    • Technology Transfer Council (1987) The Victorian Just-In-Time Manufacturing Pilot Program (JITVIC). Victorian Government Department of Industry, Technology and Resources in conjunction with the Federal Government Department of Industry, Technology and Commerce, Australia.
    • (1987) The Victorian Just-in-time Manufacturing Pilot Program (JITVIC)
  • 94
  • 95
    • 84949394758 scopus 로고
    • Employee relations and just-in-time manufacturing techniques
    • Melbourne University
    • Tovey, T. (1986) Employee relations and just-in-time manufacturing techniques. MBA Research Report, Melbourne University.
    • (1986) MBA Research Report
    • Tovey, T.1
  • 96
    • 0012530047 scopus 로고
    • Key ingredients for successful implementation of just-in-time: A system for all business sizes
    • Tucker, M. and Davis, D. A. (1993) Key ingredients for successful implementation of just-in-time: a system for all business sizes. Business Horizons 36, 59-65.
    • (1993) Business Horizons , vol.36 , pp. 59-65
    • Tucker, M.1    Davis, D.A.2
  • 97
    • 0012247917 scopus 로고
    • Applying a theory of organisation change to adopting JIT
    • Vora, J. A. (1992) Applying a theory of organisation change to adopting JIT. International Journal of Management Science 20, 193-199.
    • (1992) International Journal of Management Science , vol.20 , pp. 193-199
    • Vora, J.A.1
  • 99
    • 0002825894 scopus 로고
    • What's your excuse for not using JIT?
    • Walleigh, R. C. (1986) What's your excuse for not using JIT?. Harvard Business Review 64, 38-54.
    • (1986) Harvard Business Review , vol.64 , pp. 38-54
    • Walleigh, R.C.1
  • 101
    • 0041553415 scopus 로고
    • Designing the support for the factory of tomorrow
    • Wells, G.N. (1987) Designing the support for the factory of tomorrow. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 83-87.
    • (1987) CPIM Just-in-time Reprints
    • Wells, G.N.1
  • 102
    • 0043056489 scopus 로고    scopus 로고
    • reprinted APICS Inc.
    • Wells, G.N. (1987) Designing the support for the factory of tomorrow. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 83-87.
    • 1987 APICS Conference Proceedings , pp. 83-87
  • 105
    • 0041553414 scopus 로고
    • The realities of empowerment: A factory case study
    • July
    • Williams, B.R. (1995) The realities of empowerment: a factory case study. APICS Victoria Chapter Magazine (July), 10-13.
    • (1995) APICS Victoria Chapter Magazine , pp. 10-13
    • Williams, B.R.1
  • 106
    • 21144465881 scopus 로고
    • A framework for successful adoption and performance of Japanese manufacturing practices in the United States
    • Young, S. M. (1992) A framework for successful adoption and performance of Japanese manufacturing practices in the United States. Academy of Management Review 17, 677-700. Damien Power is Manufacturing Manager at Schlumberger Measurement & Systems Australia. Previously he was Manufacturing Manager at NEC Australia in the Transmission Systems Division, and has held supervisory, production and manufacturing management positions in a range of industries from food to electronics over the past 20 years. He holds a Bachelor of Business degree in Manufacturing Management from Monash University and is currently studying for a Master of Business (Research) in Operations Management in the area of JIT implementation and operation.
    • (1992) Academy of Management Review , vol.17 , pp. 677-700
    • Young, S.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.