-
1
-
-
0001972713
-
Time and motion regained
-
Adler, P. S. (1993) Time and motion regained. Harvard Business Review 71, 97-108.
-
(1993)
Harvard Business Review
, vol.71
, pp. 97-108
-
-
Adler, P.S.1
-
3
-
-
0026141525
-
A comparative study of US manufacturing firms at various stages of just-in-time implementation
-
Ahmed, N. V., Tunc, E. A. and Montagno, R. V. (1991) A comparative study of US manufacturing firms at various stages of just-in-time implementation. International Journal of Production Research 29, 787-802.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 787-802
-
-
Ahmed, N.V.1
Tunc, E.A.2
Montagno, R.V.3
-
5
-
-
0041553438
-
Unipartners
-
11 April
-
Anon. (1992) Unipartners. The Economist, 11 April (reprinted in APICS Victoria Chapter Magazine, August 1992, pp. 7, 10).
-
(1992)
The Economist
-
-
-
6
-
-
0041553436
-
-
reprinted August 1992
-
Anon. (1992) Unipartners. The Economist, 11 April (reprinted in APICS Victoria Chapter Magazine, August 1992, pp. 7, 10).
-
APICS Victoria Chapter Magazine
, pp. 7
-
-
-
7
-
-
0041553443
-
Identifying factors critical to success in implementing just-in-time technique
-
Ansari, A. (1986) Identifying factors critical to success in implementing just-in-time technique. Industrial Engineering 18, 44-52.
-
(1986)
Industrial Engineering
, vol.18
, pp. 44-52
-
-
Ansari, A.1
-
8
-
-
3543097362
-
Leading the way: A study of best manufacturing practices in Australia and New Zealand
-
Australian Manufacturing Council (1994) Leading the way: a study of best manufacturing practices in Australia and New Zealand. In: AMC Survey Data, 1994, 2nd edition.
-
(1994)
AMC Survey Data, 1994, 2nd Edition
-
-
-
11
-
-
0041895442
-
Misconceptions abound concerning just-in-time operating philosophy
-
September
-
Bockerstette, J.A. (1988) Misconceptions abound concerning just-in-time operating philosophy. Industrial Engineering (September), 54-58.
-
(1988)
Industrial Engineering
, pp. 54-58
-
-
Bockerstette, J.A.1
-
12
-
-
0001429020
-
A comparison of just-in-time and batch manufacturing: The role of performance obstacles
-
Brown, K. A. and Mitchell, T. R. (1991) A comparison of just-in-time and batch manufacturing: the role of performance obstacles. Academy of Management Journal 34, 906-917.
-
(1991)
Academy of Management Journal
, vol.34
, pp. 906-917
-
-
Brown, K.A.1
Mitchell, T.R.2
-
13
-
-
0041553441
-
Flexible work practices at the core of ICI success
-
August
-
Buxton, R. (1995) Flexible work practices at the core of ICI success. Benchmark 12 (August), 18-19.
-
(1995)
Benchmark
, vol.12
, pp. 18-19
-
-
Buxton, R.1
-
14
-
-
0002723736
-
An integrative model of Japanese manufacturing techniques
-
Chan, J. S., Samson, D. and Sohal, A. S. (1989) An integrative model of Japanese manufacturing techniques. International Journal of Operations and Production Management 10, 42.
-
(1989)
International Journal of Operations and Production Management
, vol.10
, pp. 42
-
-
Chan, J.S.1
Samson, D.2
Sohal, A.S.3
-
15
-
-
0042555574
-
Implementing JIT with employee involvement: What works?
-
Connell, G. W. (1990) Implementing JIT with employee involvement: what works? In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings), APICS Inc., pp. 59-62.
-
(1990)
CPIM Just-in-time Reprints
-
-
Connell, G.W.1
-
16
-
-
0042555575
-
-
reprinted APICS Inc.
-
Connell, G. W. (1990) Implementing JIT with employee involvement: what works? In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings), APICS Inc., pp. 59-62.
-
1990 APICS Conference Proceedings
, pp. 59-62
-
-
-
17
-
-
0038706152
-
Designing performance measurement systems for just-in-time operations
-
Crawford, K. M. and Cox, J. F. (1990) Designing performance measurement systems for just-in-time operations. International Journal of Production Research 28, 2025-2036.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2025-2036
-
-
Crawford, K.M.1
Cox, J.F.2
-
18
-
-
0026902788
-
A derivation of the underlying constructs of just-in-time management systems
-
Davy, J. A., White, R. E., Merritt, N. J. and Gritzmacher, K. (1992) A derivation of the underlying constructs of just-in-time management systems. Academy of Management Journal 35, 653-670.
-
(1992)
Academy of Management Journal
, vol.35
, pp. 653-670
-
-
Davy, J.A.1
White, R.E.2
Merritt, N.J.3
Gritzmacher, K.4
-
19
-
-
84950762252
-
Pushing back the frontiers: Management control and work intensification under JIT/TQM factory regimes
-
Delbridge, R., Turnbull, P. and Wilkinson, B. (1992) Pushing back the frontiers: management control and work intensification under JIT/TQM factory regimes. New Technology Work and Employment 7, 97-106.
-
(1992)
New Technology Work and Employment
, vol.7
, pp. 97-106
-
-
Delbridge, R.1
Turnbull, P.2
Wilkinson, B.3
-
20
-
-
0002108142
-
Integrated manufacturing: Redesign the organisation before implementing flexible technology
-
Duimering, R. P., Safayeni, F. and Purdy, L. (1993) Integrated manufacturing: redesign the organisation before implementing flexible technology. Sloan Management Review 34, 47-56.
-
(1993)
Sloan Management Review
, vol.34
, pp. 47-56
-
-
Duimering, R.P.1
Safayeni, F.2
Purdy, L.3
-
21
-
-
0042054760
-
The rewards of linking best practice to enterprise bargaining
-
August
-
Ferguson M. (1995) The rewards of linking best practice to enterprise bargaining. Benchmark 1 (August) 12-13.
-
(1995)
Benchmark
, vol.1
, pp. 12-13
-
-
Ferguson, M.1
-
22
-
-
1842643804
-
Expert advice for JIT implementation
-
Fiedler, K., Gallety, J. E. and Bicheno, J. (1993) Expert advice for JIT implementation. International Journal of Operations and Production Management 13, 23-30.
-
(1993)
International Journal of Operations and Production Management
, vol.13
, pp. 23-30
-
-
Fiedler, K.1
Gallety, J.E.2
Bicheno, J.3
-
23
-
-
21844504189
-
Relationship between JIT and TQM: Practices and performance
-
Flynn, B. B., Sakakibara, S. and Schroeder, R. G. (1995) Relationship between JIT and TQM: practices and performance. Academy of Management Journal 38, 1325-1360.
-
(1995)
Academy of Management Journal
, vol.38
, pp. 1325-1360
-
-
Flynn, B.B.1
Sakakibara, S.2
Schroeder, R.G.3
-
24
-
-
0030558641
-
Work organisation in lean production and traditional plants: What are the differences?
-
Forza, C. (1996) Work organisation in lean production and traditional plants: what are the differences?. International Journal of Operations and Production Management 16, 42-62.
-
(1996)
International Journal of Operations and Production Management
, vol.16
, pp. 42-62
-
-
Forza, C.1
-
26
-
-
84877701632
-
The state of JIT implementation and development in the USA
-
Gilbert, J. P. (1990) The state of JIT implementation and development in the USA. International Journal of Production Research 28, 1099-1109.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1099-1109
-
-
Gilbert, J.P.1
-
31
-
-
0001782257
-
Just-in-time: The issue of implementation
-
Harber, D., Samson, D. A., Sohal, A. S. and Wirth, A. (1989) Just-in-time: the issue of implementation. International Journal of Operations and Production Management 9, 13-22.
-
(1989)
International Journal of Operations and Production Management
, vol.9
, pp. 13-22
-
-
Harber, D.1
Samson, D.A.2
Sohal, A.S.3
Wirth, A.4
-
32
-
-
38249016089
-
Just-in-time manufacturing: Implications for the management of human resources
-
Hiltrop, J. M. (1992) Just-in-time manufacturing: implications for the management of human resources. European Management Journal 10, 49-55.
-
(1992)
European Management Journal
, vol.10
, pp. 49-55
-
-
Hiltrop, J.M.1
-
33
-
-
0041553419
-
Communication - The key to worker participation
-
Holland, P. (1995) Communication - The key to worker participation. Benchmark 12, 14.
-
(1995)
Benchmark
, vol.12
, pp. 14
-
-
Holland, P.1
-
34
-
-
0024628357
-
An integrated model of management and employee influences on just-in-time implementation
-
Spring
-
Hopkins, S.A. (1989) An integrated model of management and employee influences on just-in-time implementation. SAM Advanced Management Journal (Spring), 15-20.
-
(1989)
SAM Advanced Management Journal
, pp. 15-20
-
-
Hopkins, S.A.1
-
35
-
-
0028404326
-
How do JIT systems affect human resource management?
-
Im, J. H., Hartman, S. J. and Bondi, P. J. (1994) How do JIT systems affect human resource management?. Production and Inventory Management Journal 35, 1-4.
-
(1994)
Production and Inventory Management Journal
, vol.35
, pp. 1-4
-
-
Im, J.H.1
Hartman, S.J.2
Bondi, P.J.3
-
36
-
-
0028431816
-
How to unlock the benefits of MRPII and just-in-time
-
Jacobi, M. A. (1994) How to unlock the benefits of MRPII and just-in-time. Hospital Material Management Quarterly 15, 12-22.
-
(1994)
Hospital Material Management Quarterly
, vol.15
, pp. 12-22
-
-
Jacobi, M.A.1
-
37
-
-
84965567029
-
Just-in-time, 'regimes' and reductionism
-
Jenkins, A. (1994) Just-in-time, 'regimes' and reductionism. Sociology 28, 21-30.
-
(1994)
Sociology
, vol.28
, pp. 21-30
-
-
Jenkins, A.1
-
38
-
-
3543125265
-
How to create 'frontline teamwork' and the sequenced plant
-
Joy, W.J. and Joy, A.J. (1993) How to create 'frontline teamwork' and the sequenced plant. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 67-70.
-
(1993)
CPIM Just-in-time Reprints
-
-
Joy, W.J.1
Joy, A.J.2
-
39
-
-
0043056510
-
-
reprinted APICS Inc.
-
Joy, W.J. and Joy, A.J. (1993) How to create 'frontline teamwork' and the sequenced plant. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 67-70.
-
1993 APICS International Conference Proceedings
, pp. 67-70
-
-
-
41
-
-
0001777961
-
Yesterday's accounting undermines production
-
Kaplan, R. S. (1984) Yesterday's accounting undermines production. Harvard Business Review 62, 95-101.
-
(1984)
Harvard Business Review
, vol.62
, pp. 95-101
-
-
Kaplan, R.S.1
-
42
-
-
84968082676
-
Accounting lag: The obsolescence of cost accounting systems
-
Kaplan, R. S. (1986) Accounting lag: the obsolescence of cost accounting systems. California Management Review 28, 174-199.
-
(1986)
California Management Review
, vol.28
, pp. 174-199
-
-
Kaplan, R.S.1
-
43
-
-
0041553435
-
Impact of implementing just-in-time in a European manufacturing environment
-
Keller, A. Z., Kazazi, A. and Carruthers, A. (1992) Impact of implementing just-in-time in a European manufacturing environment. International Journal of Quality and Reliability Management 9, 54-63.
-
(1992)
International Journal of Quality and Reliability Management
, vol.9
, pp. 54-63
-
-
Keller, A.Z.1
Kazazi, A.2
Carruthers, A.3
-
45
-
-
0041553439
-
Just-in-time and quality at the source: Implementing a performance advantage
-
Kinsey, J.W. (1990) Just-in-time and quality at the source: implementing a performance advantage. In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings). APICS Inc., pp. 37-41.
-
(1990)
CPIM Just-in-time Reprints
-
-
Kinsey, J.W.1
-
46
-
-
0042555572
-
-
reprinted APICS Inc.
-
Kinsey, J.W. (1990) Just-in-time and quality at the source: implementing a performance advantage. In: CPIM Just-In-Time Reprints (reprinted from the 1990 APICS Conference Proceedings). APICS Inc., pp. 37-41.
-
1990 APICS Conference Proceedings
, pp. 37-41
-
-
-
47
-
-
0002506422
-
The human cost of manufacturing reform
-
March-April
-
Klein, J. (1989) The human cost of manufacturing reform. Harvard Business Review (March-April), 60-66.
-
(1989)
Harvard Business Review
, pp. 60-66
-
-
Klein, J.1
-
48
-
-
84973744334
-
A re-examination of autonomy in the light of new manufacturing practices
-
Klein, J. (1991) A re-examination of autonomy in the light of new manufacturing practices. Human Relations 44, 21-38.
-
(1991)
Human Relations
, vol.44
, pp. 21-38
-
-
Klein, J.1
-
49
-
-
0002324201
-
Leading change: Why transformation efforts fail
-
March-April
-
Kotter, J.P. (1995) Leading change: why transformation efforts fail. Harvard Business Review (March-April), 59-67.
-
(1995)
Harvard Business Review
, pp. 59-67
-
-
Kotter, J.P.1
-
50
-
-
0041553420
-
Behavioural barriers to the effective implementation of the just-in-time approach in American manufacturing organisations: A case study
-
Kumar, K. and Nonis, S.A. (1990) Behavioural barriers to the effective implementation of the just-in-time approach in American manufacturing organisations: a case study. Academy of Management Proceedings, 195-198.
-
(1990)
Academy of Management Proceedings
, pp. 195-198
-
-
Kumar, K.1
Nonis, S.A.2
-
51
-
-
0042054769
-
Classification of JIT techniques and their implications
-
Kuphany, L. (1995) Classification of JIT techniques and their implications. Industrial Engineering 27, 62-67.
-
(1995)
Industrial Engineering
, vol.27
, pp. 62-67
-
-
Kuphany, L.1
-
53
-
-
0041553434
-
-
Department of Human Geography, Australian National University, Canberra, 20 pp.
-
Linge, G.J.R. (1990) Just-in-time: More or less flexible? Department of Human Geography, Australian National University, Canberra, 20 pp.
-
(1990)
Just-in-time: More or Less Flexible?
-
-
Linge, G.J.R.1
-
55
-
-
0003678739
-
-
Jossey Bass, San Francisco (quoted in Brown and Mitchell, 1991)
-
Majchrzak, A. (1988) The Human Side of Factory Automation. Jossey Bass, San Francisco (quoted in Brown and Mitchell, 1991).
-
(1988)
The Human Side of Factory Automation
-
-
Majchrzak, A.1
-
57
-
-
0043056496
-
Building the innovative organisation
-
August
-
Mathews, J. (1995) Building the innovative organisation. Benchmark 12 (August), 8-9.
-
(1995)
Benchmark
, vol.12
, pp. 8-9
-
-
Mathews, J.1
-
58
-
-
84985841654
-
Determining the critical elements of just-in-time implementation
-
Mehra, S. and Inman, R. A. (1992) Determining the critical elements of just-in-time implementation. Decision Sciences 23, 160-174.
-
(1992)
Decision Sciences
, vol.23
, pp. 160-174
-
-
Mehra, S.1
Inman, R.A.2
-
60
-
-
0003449926
-
-
Institute of Industrial Engineers, Atlanta, Georgia
-
Monden, Y. (1983) Toyota Production System. Institute of Industrial Engineers, Atlanta, Georgia.
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
62
-
-
0043056495
-
-
Committee for Economic Development of Australia, Public Information Pamphlet No. 16, April
-
Mortensen, W. (1988) The just-in-time system - A survey. Committee for Economic Development of Australia, Public Information Pamphlet No. 16, April.
-
(1988)
The Just-in-time System - A Survey
-
-
Mortensen, W.1
-
64
-
-
0028457885
-
Just-in-time production systems: A survey of managers
-
Norris, D. M., Swanson, R. D. and Chu, Y. L. (1994) Just-in-time production systems: a survey of managers. Production and Inventory Management Journal 35, 63-66.
-
(1994)
Production and Inventory Management Journal
, vol.35
, pp. 63-66
-
-
Norris, D.M.1
Swanson, R.D.2
Chu, Y.L.3
-
67
-
-
84980305277
-
Adopting japanese-style manufacturing methods: A tale of two (UK) factories
-
September
-
Oliver, N. and Davies, A. (1990) Adopting Japanese-style manufacturing methods: a tale of two (UK) factories. Journal of Management Studies (September), 555-570.
-
(1990)
Journal of Management Studies
, pp. 555-570
-
-
Oliver, N.1
Davies, A.2
-
68
-
-
0027906723
-
Acme manufacturing: A case study in JIT implementation
-
Payne, T. E. (1993) Acme manufacturing: a case study in JIT implementation. Production and Inventory Management Journal 34, 82-86.
-
(1993)
Production and Inventory Management Journal
, vol.34
, pp. 82-86
-
-
Payne, T.E.1
-
69
-
-
0041553418
-
Just-in-time is just-a-people system
-
Perotin, S. (1987) Just-in-time is just-a-people system. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 75-78.
-
(1987)
CPIM Just-in-time Reprints
-
-
Perotin, S.1
-
70
-
-
0041553403
-
-
reprinted APICS Inc.
-
Perotin, S. (1987) Just-in-time is just-a-people system. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 75-78.
-
1987 APICS Conference Proceedings
, pp. 75-78
-
-
-
71
-
-
0027575298
-
Human resource issues in manufacturing improvement initiatives; case study experiences in australia
-
Samson, D., Sohal, A. S. and Ramsay, E. (1993) Human resource issues in manufacturing improvement initiatives; case study experiences in Australia. International Journal of Human Factors in Manufacturing 3, 135-152.
-
(1993)
International Journal of Human Factors in Manufacturing
, vol.3
, pp. 135-152
-
-
Samson, D.1
Sohal, A.S.2
Ramsay, E.3
-
74
-
-
0002275726
-
A behavioural case study of just-in-time implementation
-
Sefayeni, F. and Purdy, L. (1991) A behavioural case study of just-in-time implementation. Journal of Operations Management 10, 213-228.
-
(1991)
Journal of Operations Management
, vol.10
, pp. 213-228
-
-
Sefayeni, F.1
Purdy, L.2
-
75
-
-
84965409764
-
Someone to watch over me: Surveillance, discipline and the just-in-time labour process
-
Sewell, G. and Wilkinson, B. (1992) Someone to watch over me: surveillance, discipline and the just-in-time labour process. Sociology 26, 271-289.
-
(1992)
Sociology
, vol.26
, pp. 271-289
-
-
Sewell, G.1
Wilkinson, B.2
-
76
-
-
0027906712
-
A line stop strategy for the just-in-time/total quality control production system
-
Shin, D. and Min, H. (1993) A line stop strategy for the just-in-time/total quality control production system. Production and Inventory Management Journal 34, 43-47.
-
(1993)
Production and Inventory Management Journal
, vol.34
, pp. 43-47
-
-
Shin, D.1
Min, H.2
-
78
-
-
0002269249
-
Control in an age of empowerment
-
March-April
-
Simons, R. (1995) Control in an age of empowerment. Harvard Business Review (March-April), 80-88.
-
(1995)
Harvard Business Review
, pp. 80-88
-
-
Simons, R.1
-
79
-
-
0041553417
-
Just-in-time: Victorian data
-
Sohal, A. S. (1991) Just-in-time: Victorian data.. Labour and Industry 4, 41-54.
-
(1991)
Labour and Industry
, vol.4
, pp. 41-54
-
-
Sohal, A.S.1
-
81
-
-
0002966098
-
Integrating CNC technology and the JIT KANBAN system: A case study
-
Sohal, A.S., Lewis, D. and Samson, D. (1993a) Integrating CNC technology and the JIT KANBAN system: a case study. International Journal of Technology Management (Special Issue on 'Manufacturing technology: diffusion, implementation and management') 8(3-5), 422-431.
-
(1993)
International Journal of Technology Management
-
-
Sohal, A.S.1
Lewis, D.2
Samson, D.3
-
82
-
-
0042555560
-
-
Special Issue
-
Sohal, A.S., Lewis, D. and Samson, D. (1993a) Integrating CNC technology and the JIT KANBAN system: a case study. International Journal of Technology Management (Special Issue on 'Manufacturing technology: diffusion, implementation and management') 8(3-5), 422-431.
-
Manufacturing Technology: Diffusion, Implementation and Management
, vol.8
, Issue.3-5
, pp. 422-431
-
-
-
83
-
-
0037691722
-
JIT manufacturing: Industry analysis and a methodology for implementation
-
Sohal, A. S., Ramsay, L. and Samson, D. (1993b) JIT manufacturing: industry analysis and a methodology for implementation. International Journal of Operations and Production Management 13, 22-56.
-
(1993)
International Journal of Operations and Production Management
, vol.13
, pp. 22-56
-
-
Sohal, A.S.1
Ramsay, L.2
Samson, D.3
-
84
-
-
0043056487
-
Assessing and developing team effectiveness
-
Stahl, R.A. and Andersen, S.L. (1993) Assessing and developing team effectiveness. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 79-82.
-
(1993)
CPIM Just-in-time Reprints
-
-
Stahl, R.A.1
Andersen, S.L.2
-
85
-
-
0042054757
-
-
reprinted APICS Inc.
-
Stahl, R.A. and Andersen, S.L. (1993) Assessing and developing team effectiveness. In: CPIM Just-In-Time Reprints (reprinted from the 1993 APICS International Conference Proceedings). APICS Inc., pp. 79-82.
-
1993 APICS International Conference Proceedings
, pp. 79-82
-
-
-
86
-
-
0042054759
-
Real change requires more than 'feel good' management
-
Sutton, J. (1992) Real change requires more than 'feel good' management. Industrial Engineering (July) (reprinted in APICS Victorian Chapter Magazine, January 1993, p. 9).
-
(1992)
Industrial Engineering
-
-
Sutton, J.1
-
87
-
-
0043056490
-
-
July reprinted January 1993
-
Sutton, J. (1992) Real change requires more than 'feel good' management. Industrial Engineering (July) (reprinted in APICS Victorian Chapter Magazine, January 1993, p. 9).
-
APICS Victorian Chapter Magazine
, pp. 9
-
-
-
89
-
-
21144481169
-
Planning for continual improvement in a just-in-time environment
-
Swenseth, S. R., Muralidhar, K. and Wilson, R. L. (1993) Planning for continual improvement in a just-in-time environment. International Journal of Operations and Production Management 13, 4-22.
-
(1993)
International Journal of Operations and Production Management
, vol.13
, pp. 4-22
-
-
Swenseth, S.R.1
Muralidhar, K.2
Wilson, R.L.3
-
90
-
-
0010674284
-
Milwaukee electric tool
-
Taninecz, G. (1995) Milwaukee Electric Tool. Industry Week 244, 44.
-
(1995)
Industry Week
, vol.244
, pp. 44
-
-
Taninecz, G.1
-
91
-
-
0042054758
-
Kaizen leads to breakthroughs in responsiveness - And the shingo prize - At Critikon
-
Tanner, C. and Roncarti, R. (1994) Kaizen leads to breakthroughs in responsiveness - and the Shingo prize - at Critikon. National Productivity Review 13, 517-531.
-
(1994)
National Productivity Review
, vol.13
, pp. 517-531
-
-
Tanner, C.1
Roncarti, R.2
-
92
-
-
0041553411
-
-
Victorian Government Department of Industry, Technology and Resources in conjunction with the Federal Government Department of Industry, Technology and Commerce, Australia
-
Technology Transfer Council (1987) The Victorian Just-In-Time Manufacturing Pilot Program (JITVIC). Victorian Government Department of Industry, Technology and Resources in conjunction with the Federal Government Department of Industry, Technology and Commerce, Australia.
-
(1987)
The Victorian Just-in-time Manufacturing Pilot Program (JITVIC)
-
-
-
93
-
-
0041553412
-
JIT communication changes
-
Thibadoux, G. M., Helms, M. L. and Pauley, P. (1992) JIT communication changes. European Business Review 92, 3-9.
-
(1992)
European Business Review
, vol.92
, pp. 3-9
-
-
Thibadoux, G.M.1
Helms, M.L.2
Pauley, P.3
-
95
-
-
84949394758
-
Employee relations and just-in-time manufacturing techniques
-
Melbourne University
-
Tovey, T. (1986) Employee relations and just-in-time manufacturing techniques. MBA Research Report, Melbourne University.
-
(1986)
MBA Research Report
-
-
Tovey, T.1
-
96
-
-
0012530047
-
Key ingredients for successful implementation of just-in-time: A system for all business sizes
-
Tucker, M. and Davis, D. A. (1993) Key ingredients for successful implementation of just-in-time: a system for all business sizes. Business Horizons 36, 59-65.
-
(1993)
Business Horizons
, vol.36
, pp. 59-65
-
-
Tucker, M.1
Davis, D.A.2
-
97
-
-
0012247917
-
Applying a theory of organisation change to adopting JIT
-
Vora, J. A. (1992) Applying a theory of organisation change to adopting JIT. International Journal of Management Science 20, 193-199.
-
(1992)
International Journal of Management Science
, vol.20
, pp. 193-199
-
-
Vora, J.A.1
-
99
-
-
0002825894
-
What's your excuse for not using JIT?
-
Walleigh, R. C. (1986) What's your excuse for not using JIT?. Harvard Business Review 64, 38-54.
-
(1986)
Harvard Business Review
, vol.64
, pp. 38-54
-
-
Walleigh, R.C.1
-
101
-
-
0041553415
-
Designing the support for the factory of tomorrow
-
Wells, G.N. (1987) Designing the support for the factory of tomorrow. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 83-87.
-
(1987)
CPIM Just-in-time Reprints
-
-
Wells, G.N.1
-
102
-
-
0043056489
-
-
reprinted APICS Inc.
-
Wells, G.N. (1987) Designing the support for the factory of tomorrow. In: CPIM Just-In-Time Reprints (reprinted from the 1987 APICS Conference Proceedings). APICS Inc., pp. 83-87.
-
1987 APICS Conference Proceedings
, pp. 83-87
-
-
-
105
-
-
0041553414
-
The realities of empowerment: A factory case study
-
July
-
Williams, B.R. (1995) The realities of empowerment: a factory case study. APICS Victoria Chapter Magazine (July), 10-13.
-
(1995)
APICS Victoria Chapter Magazine
, pp. 10-13
-
-
Williams, B.R.1
-
106
-
-
21144465881
-
A framework for successful adoption and performance of Japanese manufacturing practices in the United States
-
Young, S. M. (1992) A framework for successful adoption and performance of Japanese manufacturing practices in the United States. Academy of Management Review 17, 677-700. Damien Power is Manufacturing Manager at Schlumberger Measurement & Systems Australia. Previously he was Manufacturing Manager at NEC Australia in the Transmission Systems Division, and has held supervisory, production and manufacturing management positions in a range of industries from food to electronics over the past 20 years. He holds a Bachelor of Business degree in Manufacturing Management from Monash University and is currently studying for a Master of Business (Research) in Operations Management in the area of JIT implementation and operation.
-
(1992)
Academy of Management Review
, vol.17
, pp. 677-700
-
-
Young, S.M.1
|