Volumn 119, Issue 4, 1997, Pages 571-579

Scheduling models for setup reduction

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; CRITICAL PATH ANALYSIS; LINEAR PROGRAMMING; MANUFACTURE; MATHEMATICAL MODELS;

EID: 0031271493     PISSN: 10871357     EISSN: 15288935     Source Type: Journal    
DOI: 10.1115/1.2831189     Document Type: Article
Times cited : (5)

References (32)
  • 3
    • 0024733003 scopus 로고
    • Lot Sizes and Setup Frequency with Learning in Setups and Process Quality
    • Chand, S., 1989, “Lot Sizes and Setup Frequency with Learning in Setups and Process Quality,” European Journal of Operational Research, Vol. 42, No. 2, pp. 190-202.
    • (1989) European Journal of Operational Research , vol.42 , Issue.2 , pp. 190-202
    • Chand, S.1
  • 4
    • 0025453709 scopus 로고
    • A Dynamic Lot Sizing Model with Learning in Setups
    • Chand, S., and Sethi, S., 1990, “A Dynamic Lot Sizing Model with Learning in Setups,” Operations Research, Vol. 38, No. 4, pp. 644-655.
    • (1990) Operations Research , vol.38 , Issue.4 , pp. 644-655
    • Chand, S.1    Sethi, S.2
  • 5
    • 0023362513 scopus 로고
    • Project Scheduling with Resource Constraints: Branch and Bound Approach
    • Christofides, N., Alvarez, R., and Tamarit, J., 1987, “Project Scheduling with Resource Constraints: Branch and Bound Approach,” European Journal of Operational Research, Vol. 29, No. 3, pp. 262-273.
    • (1987) European Journal of Operational Research , vol.29 , Issue.3 , pp. 262-273
    • Christofides, N.1    Alvarez, R.2    Tamarit, J.3
  • 6
    • 0027574351 scopus 로고
    • Designing Flexibility into Cellular Manufacturing Systems
    • Dahel, N., and Smith, S., 1993, “Designing Flexibility into Cellular Manufacturing Systems,” International Journal of Production Research, Vol. 31, No. 4, pp. 933-945.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 933-945
    • Dahel, N.1    Smith, S.2
  • 7
    • 0016498438 scopus 로고
    • A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
    • Davis, E., and Patterson, H., 1975, “A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling,” Management Science, Vol. 21, No. 7, pp. 944-955.
    • (1975) Management Science , vol.21 , Issue.7 , pp. 944-955
    • Davis, E.1    Patterson, H.2
  • 8
    • 0026895316 scopus 로고
    • The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
    • Dobson, G., 1992, “The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups,” Operations Research, Vol. 40, No. 4, pp. 736-749.
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 736-749
    • Dobson, G.1
  • 10
    • 0001215033 scopus 로고
    • The Analysis of Activity Networks under Generalized Precedence Relations (GPRs)
    • Elmaghraby, S., and Kamburowski, J., 1992, “The Analysis of Activity Networks under Generalized Precedence Relations (GPRs),” Management Science, Vol. 38, No. 8, pp. 1245-1263.
    • (1992) Management Science , vol.38 , Issue.8 , pp. 1245-1263
    • Elmaghraby, S.1    Kamburowski, J.2
  • 11
    • 38249034192 scopus 로고
    • Repetitive Lots: The Use of a Sequence-Dependent Set-up Time Scheduling Procedure in Group Technology and Traditional Shops
    • Flynn, B., 1987, “Repetitive Lots: The Use of a Sequence-Dependent Set-up Time Scheduling Procedure in Group Technology and Traditional Shops,” Journal of Operations Management, Vol. 7, No. 1, pp. 203-216.
    • (1987) Journal of Operations Management , vol.7 , Issue.1 , pp. 203-216
    • Flynn, B.1
  • 12
    • 0020543237 scopus 로고
    • Set-up Times in Cyclic and Acyclic Group Technology Scheduling Systems
    • Foo, F., and Wager, J., 1983, “Set-up Times in Cyclic and Acyclic Group Technology Scheduling Systems,” International Journal of Production Research, Vol. 21, No. 1, pp. 63-73.
    • (1983) International Journal of Production Research , vol.21 , Issue.1 , pp. 63-73
    • Foo, F.1    Wager, J.2
  • 13
    • 85010624319 scopus 로고
    • The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
    • Gallego, G., and Moon, I., 1992, “The Effect of Externalizing Setups in the Economic Lot Scheduling Problem,” Operations Research, Vol. 40, No. 3, pp. 614-619.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 614-619
    • Gallego, G.1    Moon, I.2
  • 16
    • 0017526656 scopus 로고
    • Group Scheduling Techniques for Multiproduct, Multistage Manufacturing Systems
    • Hitomi, K., and Ham, I., 1977, “Group Scheduling Techniques for Multiproduct, Multistage Manufacturing Systems,” ASME Journal of Engineering for Industry, 99B(3), pp. 759-765.
    • (1977) ASME Journal of Engineering for Industry , vol.99B , Issue.3 , pp. 759-765
    • Hitomi, K.1    Ham, I.2
  • 18
    • 84989742291 scopus 로고
    • Economic Lot Scheduling of Fully Loaded Processes with External Setups
    • Inman, R., Jones, P., and Gallego, G., 1991, “Economic Lot Scheduling of Fully Loaded Processes with External Setups,” Naval Research Logistics, Vol. 38, No. 5, pp. 699-713.
    • (1991) Naval Research Logistics , vol.38 , Issue.5 , pp. 699-713
    • Inman, R.1    Jones, P.2    Gallego, G.3
  • 19
    • 0027148704 scopus 로고
    • Is The Potential of Cellular Manufacturing Being Achieved?
    • Jordan, P., and Frazier, G., 1993, “Is The Potential of Cellular Manufacturing Being Achieved?” Production and Inventory Management Journal, Vol. 34, No. 1, pp. 70-72.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.1 , pp. 70-72
    • Jordan, P.1    Frazier, G.2
  • 20
    • 84989674850 scopus 로고
    • Production Lot Sizing under Setup and Worker Learning
    • Karwan, K., Mazzola, J., and Morey, R., 1988, “Production Lot Sizing under Setup and Worker Learning,” Naval Research Logistics, Vol. 35, No. 2, pp. 159-175.
    • (1988) Naval Research Logistics , vol.35 , Issue.2 , pp. 159-175
    • Karwan, K.1    Mazzola, J.2    Morey, R.3
  • 21
    • 0001620447 scopus 로고
    • Critical Path Planning and Scheduling: Mathematical Basis
    • Kelley, J., Jr., 1961, “Critical Path Planning and Scheduling: Mathematical Basis,” Operations Research, Vol. 9, No. 3, pp. 296-320.
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 296-320
    • Kelley, J.1
  • 23
    • 0027201210 scopus 로고
    • A Revised Critical Path Method for Networks Including both Overlap Relationships and Variable-Duration Activities
    • Leachman, R., and Kim, S., 1993, “A Revised Critical Path Method for Networks Including both Overlap Relationships and Variable-Duration Activities,” European Journal of Operational Research, Vol. 64, No. 2, pp. 229-248.
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 229-248
    • Leachman, R.1    Kim, S.2
  • 25
  • 29
    • 0020193734 scopus 로고
    • Resource-Constrained Project Scheduling with Time Resource Tradeoffs: The Nonpreemptive Case
    • Talbot, F., 1982, “Resource-Constrained Project Scheduling with Time Resource Tradeoffs: The Nonpreemptive Case,” Management Science, Vol. 28, No. 10, pp. 1197-1210.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.1
  • 30
    • 0027187517 scopus 로고
    • A Mathematical Model for the Economic Justification of Setup Time Reduction
    • Trevino, J., Hurley, B., and Friedrich, W., 1993, “A Mathematical Model for the Economic Justification of Setup Time Reduction,” International Journal of Production Research, Vol. 31, No. 1, pp. 191-202.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 191-202
    • Trevino, J.1    Hurley, B.2    Friedrich, W.3
  • 31
    • 0028396719 scopus 로고
    • A Constraint-Based Perspective in Resource Constrained Project Scheduling
    • Ulsoy, G., and Ozdamar, L., 1994, “A Constraint-Based Perspective in Resource Constrained Project Scheduling,” International Journal of Production Research, Vol. 32, No. 3, pp. 693-705.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 693-705
    • Ulsoy, G.1    Ozdamar, L.2
  • 32
    • 0018531139 scopus 로고
    • Project Scheduling with Discrete and Continuous Resources
    • Weglarz, J., 1979, “Project Scheduling with Discrete and Continuous Resources,” IEEE Transactions on Systems, Man, and Cybernetics, Vol. 9, No. 10, pp. 644-650.
    • (1979) IEEE Transactions on Systems, Man, and Cybernetics , vol.9 , Issue.10 , pp. 644-650
    • Weglarz, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.