-
2
-
-
0027656759
-
Cellular Manufacturing: Its Impacts on the Total Factory
-
Burgess, A., Morgan, I., and Vollmann, T., 1993, “Cellular Manufacturing: Its Impacts on the Total Factory,” International Journal of Production Research, Vol. 31, No. 8, pp. 2059-2077.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.8
, pp. 2059-2077
-
-
Burgess, A.1
Morgan, I.2
Vollmann, T.3
-
3
-
-
0024733003
-
Lot Sizes and Setup Frequency with Learning in Setups and Process Quality
-
Chand, S., 1989, “Lot Sizes and Setup Frequency with Learning in Setups and Process Quality,” European Journal of Operational Research, Vol. 42, No. 2, pp. 190-202.
-
(1989)
European Journal of Operational Research
, vol.42
, Issue.2
, pp. 190-202
-
-
Chand, S.1
-
4
-
-
0025453709
-
A Dynamic Lot Sizing Model with Learning in Setups
-
Chand, S., and Sethi, S., 1990, “A Dynamic Lot Sizing Model with Learning in Setups,” Operations Research, Vol. 38, No. 4, pp. 644-655.
-
(1990)
Operations Research
, vol.38
, Issue.4
, pp. 644-655
-
-
Chand, S.1
Sethi, S.2
-
5
-
-
0023362513
-
Project Scheduling with Resource Constraints: Branch and Bound Approach
-
Christofides, N., Alvarez, R., and Tamarit, J., 1987, “Project Scheduling with Resource Constraints: Branch and Bound Approach,” European Journal of Operational Research, Vol. 29, No. 3, pp. 262-273.
-
(1987)
European Journal of Operational Research
, vol.29
, Issue.3
, pp. 262-273
-
-
Christofides, N.1
Alvarez, R.2
Tamarit, J.3
-
6
-
-
0027574351
-
Designing Flexibility into Cellular Manufacturing Systems
-
Dahel, N., and Smith, S., 1993, “Designing Flexibility into Cellular Manufacturing Systems,” International Journal of Production Research, Vol. 31, No. 4, pp. 933-945.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.4
, pp. 933-945
-
-
Dahel, N.1
Smith, S.2
-
7
-
-
0016498438
-
A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
-
Davis, E., and Patterson, H., 1975, “A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling,” Management Science, Vol. 21, No. 7, pp. 944-955.
-
(1975)
Management Science
, vol.21
, Issue.7
, pp. 944-955
-
-
Davis, E.1
Patterson, H.2
-
8
-
-
0026895316
-
The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
-
Dobson, G., 1992, “The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups,” Operations Research, Vol. 40, No. 4, pp. 736-749.
-
(1992)
Operations Research
, vol.40
, Issue.4
, pp. 736-749
-
-
Dobson, G.1
-
10
-
-
0001215033
-
The Analysis of Activity Networks under Generalized Precedence Relations (GPRs)
-
Elmaghraby, S., and Kamburowski, J., 1992, “The Analysis of Activity Networks under Generalized Precedence Relations (GPRs),” Management Science, Vol. 38, No. 8, pp. 1245-1263.
-
(1992)
Management Science
, vol.38
, Issue.8
, pp. 1245-1263
-
-
Elmaghraby, S.1
Kamburowski, J.2
-
11
-
-
38249034192
-
Repetitive Lots: The Use of a Sequence-Dependent Set-up Time Scheduling Procedure in Group Technology and Traditional Shops
-
Flynn, B., 1987, “Repetitive Lots: The Use of a Sequence-Dependent Set-up Time Scheduling Procedure in Group Technology and Traditional Shops,” Journal of Operations Management, Vol. 7, No. 1, pp. 203-216.
-
(1987)
Journal of Operations Management
, vol.7
, Issue.1
, pp. 203-216
-
-
Flynn, B.1
-
12
-
-
0020543237
-
Set-up Times in Cyclic and Acyclic Group Technology Scheduling Systems
-
Foo, F., and Wager, J., 1983, “Set-up Times in Cyclic and Acyclic Group Technology Scheduling Systems,” International Journal of Production Research, Vol. 21, No. 1, pp. 63-73.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.1
, pp. 63-73
-
-
Foo, F.1
Wager, J.2
-
13
-
-
85010624319
-
The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
-
Gallego, G., and Moon, I., 1992, “The Effect of Externalizing Setups in the Economic Lot Scheduling Problem,” Operations Research, Vol. 40, No. 3, pp. 614-619.
-
(1992)
Operations Research
, vol.40
, Issue.3
, pp. 614-619
-
-
Gallego, G.1
Moon, I.2
-
15
-
-
0004020261
-
-
Fifth Edition, McGraw-Hill, New York
-
Hillier, F., and Lieberman, G., 1990, Introduction to Operations Research, Fifth Edition, McGraw-Hill, New York.
-
(1990)
Introduction to Operations Research
-
-
Hillier, F.1
Lieberman, G.2
-
16
-
-
0017526656
-
Group Scheduling Techniques for Multiproduct, Multistage Manufacturing Systems
-
Hitomi, K., and Ham, I., 1977, “Group Scheduling Techniques for Multiproduct, Multistage Manufacturing Systems,” ASME Journal of Engineering for Industry, 99B(3), pp. 759-765.
-
(1977)
ASME Journal of Engineering for Industry
, vol.99B
, Issue.3
, pp. 759-765
-
-
Hitomi, K.1
Ham, I.2
-
17
-
-
0004127616
-
-
Computer Science Press, Rockville, MD
-
Horowitz, E., and Sahni, S., 1984, Fundamentals of Data Structure with Pascal, Computer Science Press, Rockville, MD.
-
(1984)
Fundamentals of Data Structure with Pascal
-
-
Horowitz, E.1
Sahni, S.2
-
18
-
-
84989742291
-
Economic Lot Scheduling of Fully Loaded Processes with External Setups
-
Inman, R., Jones, P., and Gallego, G., 1991, “Economic Lot Scheduling of Fully Loaded Processes with External Setups,” Naval Research Logistics, Vol. 38, No. 5, pp. 699-713.
-
(1991)
Naval Research Logistics
, vol.38
, Issue.5
, pp. 699-713
-
-
Inman, R.1
Jones, P.2
Gallego, G.3
-
19
-
-
0027148704
-
Is The Potential of Cellular Manufacturing Being Achieved?
-
Jordan, P., and Frazier, G., 1993, “Is The Potential of Cellular Manufacturing Being Achieved?” Production and Inventory Management Journal, Vol. 34, No. 1, pp. 70-72.
-
(1993)
Production and Inventory Management Journal
, vol.34
, Issue.1
, pp. 70-72
-
-
Jordan, P.1
Frazier, G.2
-
20
-
-
84989674850
-
Production Lot Sizing under Setup and Worker Learning
-
Karwan, K., Mazzola, J., and Morey, R., 1988, “Production Lot Sizing under Setup and Worker Learning,” Naval Research Logistics, Vol. 35, No. 2, pp. 159-175.
-
(1988)
Naval Research Logistics
, vol.35
, Issue.2
, pp. 159-175
-
-
Karwan, K.1
Mazzola, J.2
Morey, R.3
-
21
-
-
0001620447
-
Critical Path Planning and Scheduling: Mathematical Basis
-
Kelley, J., Jr., 1961, “Critical Path Planning and Scheduling: Mathematical Basis,” Operations Research, Vol. 9, No. 3, pp. 296-320.
-
(1961)
Operations Research
, vol.9
, Issue.3
, pp. 296-320
-
-
Kelley, J.1
-
22
-
-
85044160449
-
Critical Path Planning and Scheduling
-
Kelly, J., Jr. and Walker, J., 1959, “Critical Path Planning and Scheduling,” Proceedings of Eastern Joint Computer Conference, pp. 160-173.
-
(1959)
Proceedings of Eastern Joint Computer Conference
, pp. 160-173
-
-
Kelly, J.1
Walker, J.2
-
23
-
-
0027201210
-
A Revised Critical Path Method for Networks Including both Overlap Relationships and Variable-Duration Activities
-
Leachman, R., and Kim, S., 1993, “A Revised Critical Path Method for Networks Including both Overlap Relationships and Variable-Duration Activities,” European Journal of Operational Research, Vol. 64, No. 2, pp. 229-248.
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 229-248
-
-
Leachman, R.1
Kim, S.2
-
25
-
-
21144464381
-
A Goal-Programming Model for Activity Crashing in Project Networks
-
Premachandra, I., 1993, “A Goal-Programming Model for Activity Crashing in Project Networks,” International Journal of Operations & Production Management, Vol. 13, No. 6, pp. 79-85.
-
(1993)
International Journal of Operations & Production Management
, vol.13
, Issue.6
, pp. 79-85
-
-
Premachandra, I.1
-
26
-
-
0003690185
-
-
Scientific Press, Palo Alto, CA
-
Schrage, L., 1984, Linear, Integer and Quadratic Programming with LINDO, Scientific Press, Palo Alto, CA.
-
(1984)
Linear, Integer and Quadratic Programming with LINDO
-
-
Schrage, L.1
-
28
-
-
0003516209
-
-
Van Nostrand Reinhold, New York
-
Steudel, H., and Desruelle, P., 1991, Manufacturing in the Nineties: How to Become a Mean, Lean, World-Class Competitor, Van Nostrand Reinhold, New York.
-
(1991)
Manufacturing in the Nineties: How to Become a Mean, Lean, World-Class Competitor
-
-
Steudel, H.1
Desruelle, P.2
-
29
-
-
0020193734
-
Resource-Constrained Project Scheduling with Time Resource Tradeoffs: The Nonpreemptive Case
-
Talbot, F., 1982, “Resource-Constrained Project Scheduling with Time Resource Tradeoffs: The Nonpreemptive Case,” Management Science, Vol. 28, No. 10, pp. 1197-1210.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.1
-
30
-
-
0027187517
-
A Mathematical Model for the Economic Justification of Setup Time Reduction
-
Trevino, J., Hurley, B., and Friedrich, W., 1993, “A Mathematical Model for the Economic Justification of Setup Time Reduction,” International Journal of Production Research, Vol. 31, No. 1, pp. 191-202.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 191-202
-
-
Trevino, J.1
Hurley, B.2
Friedrich, W.3
-
31
-
-
0028396719
-
A Constraint-Based Perspective in Resource Constrained Project Scheduling
-
Ulsoy, G., and Ozdamar, L., 1994, “A Constraint-Based Perspective in Resource Constrained Project Scheduling,” International Journal of Production Research, Vol. 32, No. 3, pp. 693-705.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 693-705
-
-
Ulsoy, G.1
Ozdamar, L.2
-
32
-
-
0018531139
-
Project Scheduling with Discrete and Continuous Resources
-
Weglarz, J., 1979, “Project Scheduling with Discrete and Continuous Resources,” IEEE Transactions on Systems, Man, and Cybernetics, Vol. 9, No. 10, pp. 644-650.
-
(1979)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.9
, Issue.10
, pp. 644-650
-
-
Weglarz, J.1
|