메뉴 건너뛰기




Volumn 12, Issue 4, 1997, Pages 461-472

Design and underground construction at the xiaolangdi multipurpose dam site

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION; DAMS; DRAINAGE; EXCAVATION; GROUND SUPPORTS; GROUTING; ROCKS; STRUCTURAL DESIGN; WATER SUPPLY TUNNELS;

EID: 0031252221     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0886-7798(98)00005-4     Document Type: Article
Times cited : (11)

References (3)
  • 3
    • 23744497242 scopus 로고
    • Hard going for Yellow River tunnelling
    • December 10 1995
    • Tunnels and Tunnelling. 1995. Hard going for Yellow River tunnelling. December 10, 1995.
    • (1995) Tunnels and Tunnelling


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.