|
Volumn 33, Issue 1-2, 1997, Pages 303-306
|
Expert Line Balancing System (ELBS)
|
Author keywords
Assembly line; Bottleneck station; Expert system; Line balancing; Machine coupling; Manufacturing economics; Manufacturing efficiency; Manufacturing improvement; Work load; Worker assignment
|
Indexed keywords
COMPUTER AIDED MANUFACTURING;
ECONOMICS;
HEURISTIC METHODS;
INTERACTIVE COMPUTER SYSTEMS;
OPERATIONS RESEARCH;
PRODUCTION ENGINEERING;
TIME AND MOTION STUDY;
ASSEMBLY LINE;
BOTTLENECK STATION;
EXPERT LINE BALANCING SYSTEM;
MACHINE COUPLING;
MANUFACTURING ECONOMICS;
MANUFACTURING EFFICIENCY;
MANUFACTURING IMPROVEMENT;
TUTORIAL METHOD;
WORK LOAD;
WORKER ASSIGNMENT;
EXPERT SYSTEMS;
|
EID: 0031247309
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/s0360-8352(97)00098-3 Document Type: Article |
Times cited : (12)
|
References (2)
|