메뉴 건너뛰기




Volumn 33, Issue 1-2, 1997, Pages 221-224

Common cell size determination and cell loading in labor-intensive manufacturing cells

Author keywords

Cell Loading; Labor intensive Manufacturing Cells; Mixed Integer and Integer Programming; Operator Assignment

Indexed keywords

INTEGER PROGRAMMING; JOB ANALYSIS; MATHEMATICAL MODELS; OPERATIONS RESEARCH;

EID: 0031246444     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(97)00079-x     Document Type: Article
Times cited : (9)

References (2)
  • 1
    • 77957791257 scopus 로고
    • Manufacturing cell loading rules and algorithms for connected cells
    • Elsevier Science, (ed.s H Parsaei, A. Kamani and D. Liles)
    • Süer, G., Saiz., M., Dagli, C. and Gonzalez, W., "Manufacturing Cell Loading Rules and Algorithms for Connected Cells," in Design and Analysis of Cellular Manufacturing Systems, Elsevier Science, (ed.s H Parsaei, A. Kamani and D. Liles) 1995.
    • (1995) Design and Analysis of Cellular Manufacturing Systems
    • Süer, G.1    Saiz, M.2    Dagli, C.3    Gonzalez, W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.