메뉴 건너뛰기




Volumn 52, Issue 3, 1997, Pages 283-290

Physical or virtual team collocation: Does it matter?

Author keywords

Collocation; Concurrent engineering; Product design; Team performance; Teaming

Indexed keywords

OPERATIONS RESEARCH; PERFORMANCE; PRODUCT DESIGN; SOCIETIES AND INSTITUTIONS;

EID: 0031245085     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(97)89241-9     Document Type: Article
Times cited : (35)

References (14)
  • 2
    • 0001827032 scopus 로고
    • Fast-cycle capability for competitive power
    • Bower, J.L., Hout, T.M., 1988. Fast-cycle capability for competitive power, Har. Bus. Rev. 66(6), 110-118.
    • (1988) Har. Bus. Rev. , vol.66 , Issue.6 , pp. 110-118
    • Bower, J.L.1    Hout, T.M.2
  • 4
    • 6944249953 scopus 로고
    • Concurrent engineering: Narrowing the education gap
    • Carrabine, L., 1991. Concurrent engineering: narrowing the education gap. Compu. Aided Eng. 10(10), 90-94.
    • (1991) Compu. Aided Eng. , vol.10 , Issue.10 , pp. 90-94
    • Carrabine, L.1
  • 5
    • 0009915826 scopus 로고
    • United front is faster
    • Duffy, J., 1989. United front is faster. Mgmt. Today November, pp. 131-139.
    • (1989) Mgmt. Today November , pp. 131-139
    • Duffy, J.1
  • 6
    • 0009888304 scopus 로고
    • Simultaneous engineering: The new philosophy for global manufacturing
    • IMC-11 Proc. September
    • Ennis, D., McKeag, 1994. Simultaneous engineering: the new philosophy for global manufacturing. Lean Production: from Concept to Product. IMC-11 Proc. September.
    • (1994) Lean Production: From Concept to Product
    • Ennis, D.1    McKeag2
  • 7
    • 0025511676 scopus 로고
    • Eight steps to simultaneous engineering
    • Garrett, R., 1990. Eight steps to simultaneous engineering. Manuf. Eng. 105(5), 41-47.
    • (1990) Manuf. Eng. , vol.105 , Issue.5 , pp. 41-47
    • Garrett, R.1
  • 8
    • 0009925861 scopus 로고
    • Concurrent engineering: Improving time to market'
    • Green, A., 1990. Concurrent engineering: improving time to market'. Prod. Inv. Mgmt Rev. 10, 7.
    • (1990) Prod. Inv. Mgmt Rev. , vol.10 , pp. 7
    • Green, A.1
  • 9
    • 0009889982 scopus 로고
    • Concurrent engineering- A management challenge
    • Nolan, P. (Ed.), IMC-10 Proc. September
    • Hurst, D., 1993. Concurrent engineering- a management challenge. In Nolan, P. (Ed.), Innovation in Product Design. IMC-10 Proc. September, pp. 27-44.
    • (1993) Innovation in Product Design , pp. 27-44
    • Hurst, D.1
  • 10
    • 0009943025 scopus 로고
    • Implementation framework for concurrent engineering in the European context
    • West Virginia, USA, August
    • Pawar, K.S., 1994. Implementation framework for concurrent engineering in the European context. Proc. 1st Conf. on Concurrent Engineering, Research and Application (CERA), West Virginia, USA, August pp. 111-118.
    • (1994) Proc. 1st Conf. on Concurrent Engineering, Research and Application (CERA) , pp. 111-118
    • Pawar, K.S.1
  • 11
    • 0002783497 scopus 로고
    • How important is physical collocation to product development success?
    • Rafii, F., 1995. How important is physical collocation to product development success? Bus. Horizons, 78-84.
    • (1995) Bus. Horizons , pp. 78-84
    • Rafii, F.1
  • 12
    • 0009895217 scopus 로고
    • Product design: An interdisciplinary approach
    • Nolan, P (Ed.), IMC-10 Proc., September
    • Sharifi, S., Pawar, K.S., 1993. Product design: an interdisciplinary approach. In: Nolan, P (Ed.), Innovation in Product Development. IMC-10 Proc., September, pp. 15-26.
    • (1993) Innovation in Product Development , pp. 15-26
    • Sharifi, S.1    Pawar, K.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.