메뉴 건너뛰기




Volumn 12, Issue 3, 1997, Pages 1367-1373

A new planning model for assessing the effects of transmission capacity constraints on the reliability of generation supply for large nonequivalenced electric networks

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC GENERATORS; ELECTRIC LOAD FLOW; ELECTRIC LOSSES; ELECTRIC NETWORK ANALYSIS; ELECTRIC POWER GENERATION; HEURISTIC METHODS; MATHEMATICAL MODELS; PROBABILITY; STRATEGIC PLANNING;

EID: 0031197539     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.630483     Document Type: Article
Times cited : (13)

References (10)
  • 9
    • 0018544097 scopus 로고    scopus 로고
    • IEEE Committee Report, vol. 98, No. 6, pp. 2047-2054, Nov/Dec 1979.
    • IEEE Committee Report, IEEE Reliability Test System, IEEE Trans. PAS, vol. 98, No. 6, pp. 2047-2054, Nov/Dec 1979.
    • IEEE Reliability Test System, IEEE Trans. PAS


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.