![]() |
Volumn 8, Issue 5, 1997, Pages 437-450
|
Manufacturing bill-of-material planning
a,b c a |
Author keywords
Assembly sequence; BOM; Critical pathmethod; Engineering BOM; Manufacturing BOM; Production lead time
|
Indexed keywords
ALGORITHMS;
ASSEMBLY;
CRITICAL PATH ANALYSIS;
MACHINE SHOPS;
MANUFACTURE;
PRODUCT DESIGN;
PRODUCTION CONTROL;
ASSEMBLY SEQUENCE;
BILL OF MATERIAL;
ENGINEERING BILL OF MATERIAL;
MANUFACTURING BILL OF MATERIAL PLANNING;
PRODUCTION LEAD TIME;
PLANNING;
|
EID: 0031188561
PISSN: 09537287
EISSN: 13665871
Source Type: Journal
DOI: 10.1080/095372897235019 Document Type: Article |
Times cited : (18)
|
References (10)
|