메뉴 건너뛰기




Volumn 8, Issue 5, 1997, Pages 437-450

Manufacturing bill-of-material planning

Author keywords

Assembly sequence; BOM; Critical pathmethod; Engineering BOM; Manufacturing BOM; Production lead time

Indexed keywords

ALGORITHMS; ASSEMBLY; CRITICAL PATH ANALYSIS; MACHINE SHOPS; MANUFACTURE; PRODUCT DESIGN; PRODUCTION CONTROL;

EID: 0031188561     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372897235019     Document Type: Article
Times cited : (18)

References (10)
  • 2
    • 0024863419 scopus 로고
    • Strategic use of WIP inventory: The impact of bill-of-material shape and plant type
    • FINCH, B. J., and COX, J. F., 1989, Strategic use of WIP inventory: the impact of bill-of-material shape and plant type. Production and Inventory Management, 1st Quarter, 63-66.
    • (1989) Production and Inventory Management, 1St Quarter , pp. 63-66
    • Finch, B.J.1    Cox, J.F.2
  • 5
    • 0011220509 scopus 로고
    • A generic bill-of-material processor using identification of products
    • HEGGE, H.M., 1992, A generic bill-of-material processor using identification of products. Production Planning & Control, 3, 63-66.
    • (1992) Production Planning & Control , vol.3 , pp. 63-66
    • Hegge, H.M.1
  • 7
    • 0022677856 scopus 로고
    • Design, bill-of-materials, and forecasting-the inseparable threesome.Production and Inventory Management, 1st Quarter
    • MATHER, H. F., 1986, Design, bill-of-materials, and forecasting-the inseparable threesome.Production and Inventory Management, 1st Quarter, 90-107.
    • (1986) , pp. 90-107
    • Mather, H.F.1
  • 9
    • 0000207229 scopus 로고
    • New developments in generative BOM processing systems
    • VEEN, E. A., and WORTMANN, J. C., 1992, New developments in generative BOM processing systems. Production Planning & Control, 3, 327-335.
    • (1992) Production Planning & Control , vol.3 , pp. 327-335
    • Veen, E.A.1    Wortmann, J.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.