-
1
-
-
0026207670
-
Short-term load forecasting using an adaptive neural network
-
Aug.
-
T. S. Dillon, S. Sestito, and S. Leung, "Short-term load forecasting using an adaptive neural network," Electrical Power and Energy Syst., vol. 13, no. 4, Aug. 1991.
-
(1991)
Electrical Power and Energy Syst.
, vol.13
, Issue.4
-
-
Dillon, T.S.1
Sestito, S.2
Leung, S.3
-
2
-
-
0023399522
-
The time series approach to short-term load forecasting
-
Aug.
-
M. T. Hagan and S. M. Behr, "The time series approach to short-term load forecasting," IEEE Trans. Power Syst., vol. PWRS-2, pp. 785-791, Aug. 1987.
-
(1987)
IEEE Trans. Power Syst.
, vol.PWRS-2
, pp. 785-791
-
-
Hagan, M.T.1
Behr, S.M.2
-
3
-
-
0026818086
-
Short-term load forecasting using a multilayer neural network with an adaptive learning algorithm
-
Feb.
-
K. Ho, Y. Hsu, and C. Yang, "Short-term load forecasting using a multilayer neural network with an adaptive learning algorithm," IEEE Trans. Power Syst., vol. 7, pp. 141-149, Feb. 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, pp. 141-149
-
-
Ho, K.1
Hsu, Y.2
Yang, C.3
-
4
-
-
0027898205
-
Forecasting power system peak loads by an adaptive neural network
-
C. H. Dagli, et al., Eds. New York: Amer. Soc. Mech. Eng. Press
-
A. Khotanzad, A. Abaye, and D. Maratukulam, "Forecasting power system peak loads by an adaptive neural network," in Intelligent Engineering Systems Through Artificial Neural Networks, vol. 3, C. H. Dagli, et al., Eds. New York: Amer. Soc. Mech. Eng. Press, 1993, pp. 891-896.
-
(1993)
Intelligent Engineering Systems Through Artificial Neural Networks
, vol.3
, pp. 891-896
-
-
Khotanzad, A.1
Abaye, A.2
Maratukulam, D.3
-
5
-
-
0030149443
-
An artificial neural-network hourly temperature forecaster with applications in load forecasting
-
May
-
A. Khotanzad, M. H. Davis, A. Abaye, and D. J. Martukulam, "An artificial neural-network hourly temperature forecaster with applications in load forecasting," IEEE Trans. Power Syst., vol. 11, pp. 870-876, May 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, pp. 870-876
-
-
Khotanzad, A.1
Davis, M.H.2
Abaye, A.3
Martukulam, D.J.4
-
6
-
-
0029352651
-
An adaptive modular artificial neural-network hourly load forecaster and its implementation at electric utilities
-
Aug.
-
A. Khotanzad, R. C. Hwang, A. Abaye, and D. Maratukulam, "An adaptive modular artificial neural-network hourly load forecaster and its implementation at electric utilities," IEEE Trans. Power Syst., vol. 10, pp. 1716-1722, Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 1716-1722
-
-
Khotanzad, A.1
Hwang, R.C.2
Abaye, A.3
Maratukulam, D.4
-
7
-
-
0026821995
-
Short-term load forecasting using an artificial neural network
-
Feb.
-
K. Y. Lee, Y. T. Cha, and J. H. Park, "Short-term load forecasting using an artificial neural network," IEEE Trans. Power Syst., vol. 7, pp. 124-132, Feb. 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, pp. 124-132
-
-
Lee, K.Y.1
Cha, Y.T.2
Park, J.H.3
-
8
-
-
0027543854
-
Neural-network-based short-term load forecasting
-
Feb.
-
C. N. Lu, N. T. Wu, and S. Vemuri, "Neural-network-based short-term load forecasting," IEEE Trans. Power Syst., vol. 8, pp. 336-342, Feb. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 336-342
-
-
Lu, C.N.1
Wu, N.T.2
Vemuri, S.3
-
9
-
-
0024764917
-
Analysis and evaluation of five short-term load forecasting techniques
-
Nov.
-
I. Moghram and S. Rahman, "Analysis and evaluation of five short-term load forecasting techniques," IEEE Trans. Power Syst., vol. 4, pp. 1484-1491, Nov. 1989.
-
(1989)
IEEE Trans. Power Syst.
, vol.4
, pp. 1484-1491
-
-
Moghram, I.1
Rahman, S.2
-
10
-
-
0029250532
-
Practical experiences with an adaptive neural-network short-term load forecasting system
-
Feb.
-
O. Mohammed, et al., "Practical experiences with an adaptive neural-network short-term load forecasting system," IEEE Trans. Power Syst., vol. 10, pp. 254-265, Feb. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 254-265
-
-
Mohammed, O.1
-
11
-
-
0025519319
-
A regression-based approach to short-term system load forecasting
-
Nov.
-
A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term system load forecasting," IEEE Trans. Power Syst., vol. 5, pp. 1535-1544, Nov. 1990.
-
(1990)
IEEE Trans. Power Syst.
, vol.5
, pp. 1535-1544
-
-
Papalexopoulos, A.D.1
Hesterberg, T.C.2
-
12
-
-
0028548319
-
An implementation of a neural network based load forecasting model for the EMS
-
paper no. 94 WM 209-7 PWRS, Feb.
-
A. D. Papalexopolos, S. Hao, and T. M. Peng, "An implementation of a neural network based load forecasting model for the EMS, " 1994 IEEE PES Winter Meeting, paper no. 94 WM 209-7 PWRS, Feb. 1994.
-
(1994)
1994 IEEE PES Winter Meeting
-
-
Papalexopolos, A.D.1
Hao, S.2
Peng, T.M.3
-
13
-
-
0026151476
-
Electric load forecasting using an artificial neural network
-
May
-
D. C. Park, M. A. El-Sharkawi, R. J. Marks, L. E. Atlas, and M. J. Damborg, "Electric load forecasting using an artificial neural network," IEEE Trans. Power Syst., pp. 442-449, May 1991.
-
(1991)
IEEE Trans. Power Syst.
, pp. 442-449
-
-
Park, D.C.1
El-Sharkawi, M.A.2
Marks, R.J.3
Atlas, L.E.4
Damborg, M.J.5
-
14
-
-
0027646290
-
Advancement in the application of neural networks for short-term load forecasting
-
Feb.
-
T. M. Peng, N. F. Hubele, and G. G. Karady, "Advancement in the application of neural networks for short-term load forecasting," IEEE Trans. Power Syst., vol. 8, pp. 1195-1202, Feb. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 1195-1202
-
-
Peng, T.M.1
Hubele, N.F.2
Karady, G.G.3
-
15
-
-
0003807976
-
-
New York: Macmillan
-
J. G. Proakis, C. M. Rader, F. Ling, and C. L. Nikias, Advanced Digital Signal Processing. New York: Macmillan, 1992, pp. 351-358.
-
(1992)
Advanced Digital Signal Processing
, pp. 351-358
-
-
Proakis, J.G.1
Rader, C.M.2
Ling, F.3
Nikias, C.L.4
|