|
Volumn 95, Issue 24, 1997, Pages 54-60
|
Underbalanced drilling requires downhole pressure management
a,e a,f,g b,h c,i d |
Author keywords
[No Author keywords available]
|
Indexed keywords
BOTTOM HOLE PRESSURE;
DENSITY OF GASES;
DRILLING FLUIDS;
INJECTION (OIL WELLS);
NATURAL GAS PIPELINES;
NATURAL GAS WELL LOGGING;
PRESSURE EFFECTS;
TWO PHASE FLOW;
EQUIVALENT CIRCULATING DENSITY (ECD);
GAS INJECTION;
UNDERBALANCED DRILLING (UBD);
NATURAL GAS WELL DRILLING;
DRILLING;
PRESSURE FLUCTUATIONS;
WELLS-PETROLEUM;
|
EID: 0031171281
PISSN: 00301388
EISSN: None
Source Type: Journal
DOI: None Document Type: Article |
Times cited : (8)
|
References (4)
|