메뉴 건너뛰기




Volumn 68, Issue 6, 1997, Pages 377-401

A distributed search and simulation method for job flow scheduling

Author keywords

Heuristic; Job flow; Manufacturing; Reactive simulation; Scheduling

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; HEURISTIC METHODS; PROCESS CONTROL; PRODUCTION CONTROL; SCHEDULING; VIRTUAL REALITY;

EID: 0031170424     PISSN: 00375497     EISSN: None     Source Type: Journal    
DOI: 10.1177/003754979706800603     Document Type: Article
Times cited : (4)

References (24)
  • 1
    • 0028419491 scopus 로고
    • Scheduling flexible flow shops with no setup effects
    • April
    • Chang, S.-C. and Liao, D.-Y. 1994. "Scheduling flexible flow shops with no setup effects." IEEE Transactions on Robotics and Automation vol. 10, no. 2, April, pp. 112-122.
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 112-122
    • Chang, S.-C.1    Liao, D.-Y.2
  • 2
    • 0025521453 scopus 로고
    • The simulation of material handling systems
    • November
    • Banks, J. 1990. "The simulation of material handling systems." SIMULATION vol. 55, no. 5, November, pp. 261-270.
    • (1990) Simulation , vol.55 , Issue.5 , pp. 261-270
    • Banks, J.1
  • 5
    • 24144479136 scopus 로고
    • Simulation improves firm's competitive edge and increases productivity
    • January
    • Wilbanks, J., Stafford, E.F., and Schroer, B.J. 1990. "Simulation improves firm's competitive edge and increases productivity." Industrial Engineering January, pp. 32-38.
    • (1990) Industrial Engineering , pp. 32-38
    • Wilbanks, J.1    Stafford, E.F.2    Schroer, B.J.3
  • 6
    • 0011707098 scopus 로고
    • Apple uses simulation to improve PCB/ FMS line design and operation
    • July
    • Chisman, J.A. 1989. "Apple uses simulation to improve PCB/ FMS line design and operation." Industrial Engineering July, pp. 40-41.
    • (1989) Industrial Engineering , pp. 40-41
    • Chisman, J.A.1
  • 7
    • 0024665005 scopus 로고
    • Throughput analysis in an automated material handling system
    • May
    • Pulat, P.S. and Pulat, B.M. 1989. "Throughput analysis in an automated material handling system." SIMULATION vol. 52, no. 5, May, pp. 195-198.
    • (1989) Simulation , vol.52 , Issue.5 , pp. 195-198
    • Pulat, P.S.1    Pulat, B.M.2
  • 8
    • 0028515515 scopus 로고
    • Multicriteria design of manufacturing systems through simulation optimization
    • September
    • Mollaghasemi, M. and Evans, G.W. 1994. "Multicriteria design of manufacturing systems through simulation optimization." IEEE Transactions on Systems, Man, and Cybernetics vol. 24, no. 9, September, pp. 1407-1411.
    • (1994) IEEE Transactions on Systems, Man, and Cybernetics , vol.24 , Issue.9 , pp. 1407-1411
    • Mollaghasemi, M.1    Evans, G.W.2
  • 9
    • 0004631474 scopus 로고
    • Selecting simulation software for manufacturing application: Practical guideline and software survey
    • Law, A.M. and Haider, S.W. 1989. "Selecting simulation software for manufacturing application: Practical guideline and software survey." Industrial Engineering vol. 31, pp. 33-46.
    • (1989) Industrial Engineering , vol.31 , pp. 33-46
    • Law, A.M.1    Haider, S.W.2
  • 10
    • 84965432083 scopus 로고
    • Real-time simulation-based planning for computer generated force simulation
    • Lee, J. and Fishwick, P.A. 1994. "Real-time simulation-based planning for computer generated force simulation." SIMULATION vol. 63, no. 5, pp. 299-315.
    • (1994) Simulation , vol.63 , Issue.5 , pp. 299-315
    • Lee, J.1    Fishwick, P.A.2
  • 12
    • 0011667222 scopus 로고
    • Pocket pagers in lots of one
    • September
    • Strobel, R. and Johnson, A. 1993. "Pocket pagers in lots of one." IEEE Spectrum September, pp. 29-32.
    • (1993) IEEE Spectrum , pp. 29-32
    • Strobel, R.1    Johnson, A.2
  • 13
    • 33746059298 scopus 로고
    • Bicycles on a personalized basis
    • September
    • Bell, T.E. 1993. "Bicycles on a personalized basis." IEEE Spectrum September, pp. 32-35.
    • (1993) IEEE Spectrum , pp. 32-35
    • Bell, T.E.1
  • 15
    • 38249023160 scopus 로고
    • Due date based scheduling in a general flexible manufacturing system
    • April
    • Raman, N., Talbot, F.B., and Rachamadugu, R.V. 1989. "Due date based scheduling in a general flexible manufacturing system." Journal of Operations Management vol. 8, no, 2, April, pp. 115-132.
    • (1989) Journal of Operations Management , vol.8 , Issue.2 , pp. 115-132
    • Raman, N.1    Talbot, F.B.2    Rachamadugu, R.V.3
  • 18
    • 0022678067 scopus 로고
    • Distributed discrete-event simulation
    • March
    • Misra, J. 1986. "Distributed discrete-event simulation." Computing Surveys vol. 18, no. 1, March.
    • (1986) Computing Surveys , vol.18 , Issue.1
    • Misra, J.1
  • 21
    • 38249019026 scopus 로고
    • Scheduling random flexible manufacturing systems with dynamic environments
    • August
    • Hutchinson, J. and Khumawala, B. 1990. "Scheduling random flexible manufacturing systems with dynamic environments." Journal of Operations Management vol. 9, no. 3, August, pp. 335-351.
    • (1990) Journal of Operations Management , vol.9 , Issue.3 , pp. 335-351
    • Hutchinson, J.1    Khumawala, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.